1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Recent Developments toward Sub-Quantum-Noise-Limited Gravitational-wave Interferometers Nergis Mavalvala Aspen January 2005 LIGO-G R.
Virgo Control Noise Reduction
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
3 May 2011 VESF DA schoolD. Verkindt 1 Didier Verkindt Virgo-LAPP CNRS - Université de Savoie VESF Data Analysis School Data Quality and vetos.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Displacement calibration techniques for the LIGO detectors Evan Goetz (University of Michigan)‏ for the LIGO Scientific Collaboration April 2008 APS meeting.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Advanced interferometers for astronomical observations Lee Samuel Finn Center for Gravitational Wave Physics, Penn State.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LSC-VIRGO joint meeting - Pisa1 Input mirrors thermal lensing effect Frequency modulation PRCL length in Virgo Some results from a Finesse simulation.
CALVA : A test facility for Lock Acquisition F.Cavalier 1 on behalf of CALVA team : M.-A.Bizouard 1, V.Brisson 1, M.Davier 1, P.Hello 1, N.Leroy 1, N.Letendre.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
Aligning Advanced Detectors L. Barsotti, M. Evans, P. Fritschel LIGO/MIT Understanding Detector Performance and Ground-Based Detector Designs LIGO-G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Alessio Rocchi INFN Roma Tor Vergata Thermal Compensation System for Virgo+
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
LIGO-G D Advanced LIGO Systems & Interferometer Sensing & Control (ISC) Peter Fritschel, LIGO MIT PAC 12 Meeting, 27 June 2002.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Back-scattered light noise in Virgo 2nd Science Run data
Reaching the Advanced LIGO Detector Design Sensitivity
Nergis Mavalvala Aspen January 2005
Status of Virgo GWDAW Dec 13-16
Signal recycling R&D at LAL: Influence in Virgo
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Virgo Update – LSC meeting
Improving LIGO’s stability and sensitivity: commissioning examples
Status at the Prague meeting
Advanced Virgo ISC subsystem
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration

2 Difficulties and hopes Control of many degrees of freedom Aberrations Environmental noises Definitions of mid term scientific goals Stability of the mirrors Use of NDRCs for high power ITF Long work expected on environmental noises Involve theoreticians in time scheduling?

3 Some remarks on VSR2 Science Mode duty cycle > 80% Locked duty cycle > 85% Interferometer working mode particion Start July End January

4 Sensitivity and Horizon Sensitivity of Virgo+ during VSR2 (red) compared with theorical sensitivity (black) Horizon for NSNS solar masses for a typical lock

5 Sensitivity in good agreement with Noise Budget projections Recent noise budget with input power P0=17Watts. The total noise (pink curve) also includes the expected thermal (pendulum and mirror) noises

6 Difficulties of control many degrees of feeedom Alignment – the present control of alignment degrees of freedom is already complex and at the limit of noise reintroduction Residual (before closing the global alignement ) picth RMS about 0.8  rad Having the quiet mirrors also helps in lock acquisition (0.1  m/s) and in reducing control noises

7 Complexity of ADV detectors More degrees of freedom NDRCs lower the higher order modes thus error signal amplitudes High circulating power  radiation pressure effects Important to start with qiuet mirrors

8 Remarks on thermal noise During VSR2 the noise between Hz was in agreement with the expected Thermal noise + a small contributions of the other measured noises in the band

9 Installation monolithic suspensions Comment: the lowering of noise at low frequency appears to require long commissioning time both for control noises and environmental noises. The incoming operation of ITF with monolithic suspensions is expected to give important contribution for Adv detector Presently Virgo has two monolithic suspensions (input mirrors) installed and it is on going the installation of the other couples of monolithic suspensions (end mirrors) Nominal sensitivity of Virgo+ with monolithic suspensions (black) and VSR2 sensitivity (red). At very low frequency the nominal Virgo+MS sensitivity is comparable with Adv-Virgo

10 Aberrations From this picture it is seen how the NDRC maintain a much higher recycling of the sidebands with respect to MSRC configurations. This is also true for the carrier for high aberration

11 The sidebands in VSR2 We used about 1 of TCS per mirror to obtain the above shape of the sidebands and 15 recycling gain The amount of TCS was limited to 1 Watt due to noise reintroduction (before TCS power stabilization (early october) ) and to not available time for otpimization during the run During VSR2 with about 1 W of TCS per mirror Figure: sideband (left and right) and carrier (center) amplitudes at the output port of the ITF. As expected the carrier is highly aberrated (it is on dark fringe). The sidebands “should” be gaussian

12 Before and after installation of the two input monolithic suspensions Comparison of sidebands and carrier shapes at the output port before (upper) and after (lower) the installation of the first couple of monolithic suspensions and new input mirrors VSR2 Present Lower SB Carrier Upper SB

13 Control during VSR2 In these conditions of sidebands the control loops were not affecting the sensitivity. The projected noise with higher finesse and some tuning of loops is already compatible with Virgo+MS  Adv-Virgo The lesson from aberrations is somewhat “difficult”  the early Adv detectors will probably be injected with “low power” (around 25 Watt ) and use only power recycling. Anyway the locking of the ITF can be acquired and maintained in presence of not negligible aberrations  encouraging for the Adv

14 Environmental noise Up conversion of low frequency seismic noise Seismic and acustic noise due to Air conditioning machines, cooling fans….. Magnetic noise….. Modal analysis of NEB optical bench: (Left) measured map of bench motion with respect to ground; (Right) simulation of bench first structural mode.  stiffen the legs damp the resonances……

15 Environmental noises reduction Reduction of diffused ligth noise (bench alignments, isolation of pumps and funs), magnetic studies and reductions, dust protections TCS Power stabilization Time – frequency plot of dark fringe spectrum before and after turbo pump replacement with a smaller one Free running (blue) and controlled relative intensity noise of CO2 laser

16 Environmental and glitchness Rates of glitches for different SNR (central frequency < 150 Hz) for the whole VSR2. Each point correspond to 6 hours of data After the commissioning break of early October the high SNR glitches rate is greatly reduced, to less Hz, mediated on 6 hours of data, in normally quiet (not high microseism) conditions. Comment: the reduction of environmental noises can profit of a good collaboration between commissioners /data analysts (Data Quality) and should be encouraged in Adv detector

17 Experimentalists and theorists Horizon for NSNS solar masses for a typical lock Horizon as a function of total binary mass system for Virgo in June (blue curve) and in October (green), compared with the two Ligo detectors in the same period Comparison with Ligo detectors show that for high solar mass systems Virgo maintains a remarkable horizon, but it is very difficult to work in coincidence for high masses of the system.

18 The case of Virgo+ Monolithic suspensions Virgo+ with monolithic suspensions will leave a short life: it will be closed in July 2011 to start Adv-construction. Probably it will not have time to reach his potential sensitivity. A tight collaboration among experimentalists and theorists could define better where to strengthen the commissioning efforts. In the same way in case of Adv-Virgo a tight collaboration between theorists and experimentalists could be important in the various stages of the evolution of the sensitivity Medium term expected sensitivity for Virgo+MS Anticipating in very low frequency the sensitivity of Adv what could be searched for? Can we help in shortening the “desert crossing” of data?