Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

1 European Commission DG TREN / C: Conventional Energy The Regional Electricity Market in South East Europe: Mechanisms and Aims in Unified.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Baltic Energy Market Interconnection Plan (BEMIP)
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Patricia de Suzzoni, Chair of ERGEG Customer Working Group Citizens’ Energy Forum, London, September 2009 Regulatory aspects of smart metering in.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
16 November 2015 Delft University of Technology Electrical Power System Essentials ET2105 Electrical Power System Essentials Dr.ir. Pieter Schavemaker.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Regional Initiative Progress and Next Steps Graeme Steele.
efficient capacity allocation method
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
SESSION 1 - PART 1: EUROPEAN MARKETS SITUATION “MARKET TRANSPARENCY SITUATION IN EUROPE” Maria luisa Huidobro President & CEO of OMEL 2006 APEX Conference.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Europe Links 17 Power Markets as Spain, Portugal Set to Join Day-ahead power markets are set to be linked from Portugal to Finland as the European Union.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Power market structure and market price development in the SEE region
2nd Mini-Forum for Central West Electricity REM
Market Coupling and Ways Forward Lene Sonne Vice President, Market
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ETSO Comments on the draft Congestion Management Guidelines
ETSO main 2006 Issues for West-Central Europe Market Development
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Linking of regional markets
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
efficient capacity allocation method
Baltic Energy Market Interconnection Plan (BEMIP)
Walter Boltz Chairman, CEER Gas Working Group
Structure of presentation
Presentation transcript:

Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX

Key Messages Welcome the support in the Guidelines for the implicit auction approaches proposed by ETSO/EuroPEXWelcome the support in the Guidelines for the implicit auction approaches proposed by ETSO/EuroPEX Guidelines should, however, allow flexibility in terms of local and regional approachesGuidelines should, however, allow flexibility in terms of local and regional approaches Implicit auctions, flow-based transmission models and financial hedging should be clearly established as the longer term vision for the European electricity marketImplicit auctions, flow-based transmission models and financial hedging should be clearly established as the longer term vision for the European electricity market Good progress on local initiativesGood progress on local initiatives

Flexibility Local variation: a balance between existing local arrangements and European standardisationLocal variation: a balance between existing local arrangements and European standardisation –Essential European harmonisation only –Subsidiarity: build on existing local structures and regulatory arrangements Implementation: a phased approach will achieve the long term goal more quicklyImplementation: a phased approach will achieve the long term goal more quickly –Local market coupling initiatives –Local flow-based transmission model initiatives –Avoid rigid geographic definitions

Coordination Regions

Longer Term Vision Implicit auctions: both market coupling and market splittingImplicit auctions: both market coupling and market splitting –Efficient physical network use –Ease of access for all to a pan-European market –Strengthen development of liquid energy markets –Price difference bids/explicit auctions (firm flows) Flow-based transmission modelFlow-based transmission model –Improved network capacity availability Financial instrumentsFinancial instruments –Financial transmission rights –Efficient forward price difference hedging (CFD)

Local Initiatives Region Congestion Mgmt Approach Transmission Model Possible Launch Germany, Austria Market splitting (no congestion) 2005 Spain, Portugal Market splitting ATCs2005 Denmark, Germany Market splitting ATCs (HVDC) 2005 France, Belgium, Netherlands Market coupling, PTRs ATCs Early 2006 Central Eastern Europe Coordinated auctions Coordinated ATCs Early 2006 France, Spain Market coupling, PTRs ATCs2006 NorNed Market coupling ATCs (HVDC) 2007