1 Yu. Guz HCAL status 22/06/2011. 2 Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz.
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
Status of scintillator KLM study P. Pakhlov (ITEP)
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
A.Chekhtman1 GLAST LAT ProjectBeam test meeting, September 27, 2006 CsI afterglow - possible explaination of pedestal drift and excess of energy. Alexandre.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
F. Caspers, S. Federmann. Contents  Further observations and confirmation on intermodulation effects  Analysis and explanation of the gain variation.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Remembering PWO Radiation hardness studies at IHEP, Protvino Y. Kubota.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- THERMAL STEPS ANALYSIS Goals & Means : –apply a “step function” on the cooling water –look at : APD response.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
27/02/2014 INSTR14 S.Filippov1 First Years of Running for the LHCb Calorimeter System Sergey Filippov (Institute for Nuclear Research of RAS, Moscow) on.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
Phisymmetry in 2011 Phisymmetry was used:
The LHCb Calorimeter system
Preparation for CERN test beam
Ageing correction from electron
L1Calo Operations Summary
Instrumentation for Colliding Beam Physics 2017
LHCb HCAL: performance and calibration
Presentation transcript:

1 Yu. Guz HCAL status 22/06/2011

2 Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages, one right after another, both at PHYSICS HV – stability can be checked (turns out to be at ~0.3% RMS) 22/06/2011 New PHYSICS HV recipe prepared. Standalone LED runs (with 11 kHz flashing) old (#91054) and new (#91268) PHYS HV.

3 Yu. Guz Reminder: HCAL 137 Cs calibration 29/03/2011 Comparison to the 16-Feb-2011 calibration (45 days, integrated lumi 9.1 pb-1). The gain variation -22%...+8% seen. The HV change necessary for the correction is also shown (-12V…+40V). Not a big gain variation, the HV correction was not applied. 04/05/2011 HV change necessary for the correction

4 Yu. Guz HCAL 137 Cs calibration 09/05/2011 Comparison to the 16-Feb-2011 calibration (82 days, integrated luminosity 95 pb-1). The gain variation -41%...+22% seen. A systematical gain reduction in the central region, as expected. The HV change necessary for the correction is also shown (-46V…+106V). This is significantly more than 29-Mar (only 9 pb -1, previous slide). The gain variation is not negligible. The HV PHYSICS recipe was updated on 12-May. The old recipe is kept as PHYS_MAR /06/2011 HV change necessary for the correction

5 Yu. Guz Source variation vs LED variation. The following data samples used. LED: 29-Mar-2011 (run 88329) and 09-May-2011 (run 91054) (same HV) Source: 29-Mar-2011 and 09-May-2011 (same HV) A reasonable correlation seen between Cs and LED variations (41 day between the measurements) 22/06/ Cs vs LED, 09-May vs 29-Mar

6 Yu. Guz A good correspondence between expected gain ratio / and ratio of LED amplitudes taken at old HV (run 91054) and at new HV (run 91268): 3 days between these measurements. Note much better Δ(Cs)-Δ(LED) correlation than at the previous slide. 22/06/2011 check of the new HV recipe

7 Yu. Guz LED signal studies 22/06/2011 In the next few slides: 1)dependence of LED amplitudes (gain) on luminosity 2)medium-term and long-term stabilities LED/PIN ratios used; 11 kHz is always ON

8 Yu. Guz22/06/2011 ratio “3∙ kHz” / “ramp + 11 kHz” The 11 kHz do not completely saturate the gain dependence. The difference is bigger than in ECAL (?) Fill 1865, savesets: /hist/Savesets/2011/LHCb/CaloDAQCalib/06/12/CaloDAQCalib T root / /hist/Savesets/2011/LHCb/CaloDAQCalib/06/12/CaloDAQCalib T EOR.root

9 Yu. Guz22/06/2011 ratio “3∙10 32 ” / “3∙10 32 ” The stability over 12 hours looks fine. Fill 1865, savesets: /hist/Savesets/2011/LHCb/CaloDAQCalib/06/13/CaloDAQCalib T root / /hist/Savesets/2011/LHCb/CaloDAQCalib/06/12/CaloDAQCalib T root

10 Yu. Guz22/06/2011 ratio “4∙10 32 ” / “3∙10 32 ” The gain is still not completely saturated even at 3∙10 32 Fill 1871, savesets: /hist/Savesets/2011/LHCb/CaloDAQCalib/06/16/CaloDAQCalib T root / /hist/Savesets/2011/LHCb/CaloDAQCalib/06/16/CaloDAQCalib T root

11 Yu. Guz22/06/2011 ratio “3∙10 32 fill 1883” / “3∙10 32 fill 1795”. The 1 month variation is significant. Fill 1871, savesets: /hist/Savesets/2011/LHCb/CaloDAQCalib/06/21/CaloDAQCalib T root / /hist/Savesets/2011/LHCb/CaloDAQCalib/05/20/CaloDAQCalib T root

12 Yu. Guz (search for) radiation-induced effects 22/06/2011

13 Yu. Guz 13 HCAL anode currents after beam dump 22/06/2011 After beam dump Fill After the beam dump, the HCAL HV was ON during ~40 minutes, with DAQ not running (no 11 kHz pulsing). [Apart from leaking PMTs (red dots),] there is a clear pattern in HCAL PM anode currents, similar to that during data taking. Decays by a factor of ~1.5 after 20 minutes. Observed in other fills where HCAL HV was ON after the beam dump: 1787, Probably a manifestation of induced radiation. Before beam dump

14 Yu. Guz This could be seen in the comparison of 137 Cs calibration results before and after certain data taking period (in 137 Cs calibration, responses of every single scintillator tile are determined). 22/06/2011 Radiation damage of tiles and fibers beam PMT spacers WLS fibers light guide master plate scintillators row 0 row 1 row 2 row 3 row 4 row 5 The hadronic shower maximum lays ~ within the tile row 0; the dose in the row 5 is much less. Radiation damage of scintillator tiles and fibers can therefore manifest itself as a decrease of relative response of upstream rows (0, 1) with respect to row 5.

15 Yu. Guz22/06/2011 No visible regular pattern in the comparison of two consecutive source passes of 09-May Testing the procedure: 09-May run2 vs run1, no beam in between Radiation damage of tiles and fibers

16 Yu. Guz22/06/2011 a % decrease in the central area in rows 0, 1 and maybe 2. Only a small effect (if present at all). To be followed in further source runs: ~300 pb -1 between 05-Jul and 09-May! 09-May vs 29-Mar (86 pb -1 ) Radiation damage of tiles and fibers