October 15, 2012 PV & Storage Workshop PV and Storage Integration strawman proposals & discussion John Adams Principal Engineer.

Slides:



Advertisements
Similar presentations
An Introduction ppt - Saurabh Mehta
Advertisements

NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Rooftop Solar Systems Rooftop Solar System (Off-Grid) Reliance Solar Energy™, Ratnagiri.
Notrees Presentation – ERCOT Integration workshop Slides for Registration/Integration challenges.
Study of Wind Energy Penetration in the Iberian Peninsula RED ELÉCTRICA DE ESPAÑA 1 WIND POWER GENERATION Study of Wind Energy Penetration in the Iberian.
Prepared by: Hamzah Snouber For: Dr. I mad Breik.
System Strength Discussion
Bill Blevins Sep. 24, 2014 PV Forecasting RFP. 2 Projected Installed Capacity of PV in ERCOT.
1 Smart Distribution Systems: Sustainability Issues S. S. (Mani) Venkata Alstom Grid and University of Washington (UW)
PSCAD Simulation of Grid Tied Photovoltaic and Wind Farms
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Internal Resistance of a Source Definition: The resistance within a battery, or other voltage source, that causes a drop in the source voltage when there.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
SINTEF Energy Research 1 Fault ride-through testing of wind turbines Presented by: Olve Mo Paper co-authors: John Olav Tande Leif Warland Kjell Ljøkelsøy.
21 st May 2015 SMARTGREENS 2015 Lisbon, Portugal Lane Department of Computer Science and Electrical Engineering West Virginia University Analyzing Multi-Microgrid.
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
1 Implementation of the Solar RPS in New Jersey ABA Renewable Energy Panel November 16, 2005 Jan Pepper.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Wind / PV / Diesel in Off-grid: Lessons learned Best Practices
Sai Moorty ERCOT Integration Options into ERCOT systems.
Photovoltaics is a relatively very complicated subject. Understanding solar cell and solar modules function needs relatively broad knowledge from the.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
0 Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power October 15, 2012.
Link Building PV project By: Culver Matt Labaume Natasha Narnio Guillaume Roux Arnaud Stanton Andrew Thompson Matt Troyano Joana ENS Renewable.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
PRR835 – Reactive Power Capability Requirement
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Emerging Technologies Integration in ERCOT 2012 ERCOT Operations Seminar Mark Bruce Principal Stratus Energy Group.
The Influence of Climatic Factors on the Performance of Photovoltaic Panels PhD. Student Mirela Mihai, U.P.B Professor Dr. Eng. Ruxandra Vidu, U.S. Davis.
Sustainability Project. ladybird This bright little insect (also called lady-cow or Bishop Barnaby) is said to bring luck if it alights on someone, and.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
ERCOT Wind Forecast and Impact of Cold Weather Events Sandip Sharma ERCOT Operations.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
Predictive Learning for Energy Storage Dinos Gonatas (978) Ryan Hanna Center for Renewable Resources and Integration.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation.
Analytical Study of a Modified Thermal Energy Storage System for PS10 in Aswan Prof. S.Abdelhady Faculty of Energy Engineering, Aswan University, Aswan,
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
Date of download: 6/24/2016 Copyright © ASME. All rights reserved. From: Power Gain and Daily Improvement Factor in Stand-Alone Photovoltaic Systems With.
Date of download: 6/26/2016 Copyright © ASME. All rights reserved. From: A Single Stage Photovoltaic Inverter With Common Power Factor Control and Maximum.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
PV E LECTRIFICATION IN O FF -G RID A REAS. C ONTENTS 1.Introduction 2.Stand-alone PV systems PV generator Power conditioning Energy storage: batteries.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
RENEWABLES AND RELIABILITY
Asst. Prof. Dr. Sameer Saadoon Algburi
Date of download: 10/21/2017 Copyright © ASME. All rights reserved.
TILOS: From energy sustainability on a small Greek island to a global disruption in the power sector Zisimos Mantas Business Development Officer, EUNICE.
Panasonic Battery Project
Reliability Assessment Committee Reliability Workshop Priorities
Mid-Continent Area Power Pool
2500 R Midtown Sacramento Municipal Utility District
Photovoltaic Systems Engineering Session 10
Reliability Assessment Committee Reliability Workshop Priorities
User Experience with New Solar PV Models California ISO
NYS Department of Public Service
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

October 15, 2012 PV & Storage Workshop PV and Storage Integration strawman proposals & discussion John Adams Principal Engineer

2 Tab X ERCOT Public/Confidential/Restr icted Inverter based technologies to provide: PSS/E dynamic model for the inverter with associated parameters. PSCAD dynamic model for the inverter with associated parameters Expected fault characteristics of the inverter with full energy available. Full Interconnection Studies (FIS) shall include three phase fault at Point of Interconnect (POI) with which ERCOT can analyze voltage ride-through. Inverters are to provide 95% of reactive requirement within 0.5 seconds after a step voltage change from 100% of nominal to 90% of nominal. Full Interconnection Studies (FIS) shall demonstrate that voltage recovery after a fault is dampened within 6 seconds of the end of the event.

3 Tab X ERCOT Public/Confidential/Restr icted Photovoltaic technologies to provide: To accommodate solar energy forecasts fixed position solar farms shall provide ERCOT their latitude, longitude, alignment of solar panels, and placement angle off horizontal. Solar farms of over 100 MW capacities shall supply Total Sky Imager (1) and transfer sky images to ERCOT once every 30 seconds to facilitate short term cloud impact on energy production. Metrologic data at 30 second intervals as follows: Air temperature Back of panel temperature Wind speed Wind direction Global horizontal Irradiance For concentrated PV installations, in addition to the above, direct normal Irradiance shall be telemetered. (1) From “Benefits of Near-Term Cloud Location Forecasting for Large Solar PV”, a Thesis presented to the Faculty of California Polytechnic State University by Timothy Robert Rudd, August 2011.

4 Tab X ERCOT Public/Confidential/Restr icted Storage based to provide: Registration of maximum MW delivery capability Registration of maximum MWH capacity Registration of maximum MW charge rate. Registration of Transition time from Charging => Discharge and Discharge => Charge Telemeter current available power capability (MW) Telemeter current available energy availability (MWH) Telemeter maximum rate of power delivery or charging change (dP/dt) (MW/minute – telemetry represents delivery if current state is delivering power, and charging if current state is charging) Telemeter status including new statuses: Charging, On_reg_Charging, On_NS_Charging. Telemeter transition time from current state (Charging or Discharging) to other state (Discharging or Charging)

Discussion?