Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

PRODUCTION AND OPERATIONS MANAGEMENT
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Manufacturing’s Objectives
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Operations Management Capacity Planning Supplement 7
Operations Management
Perencanaan Kapasitas Produksi
For Products and Services
Operations Management
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Capacity Planning Production Planning and Control.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Capacity Planning © 2006 Prentice Hall, Inc.
Aggregate Planning.
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
Lecture 13 Production Activity Control
7 Capacity Planning PowerPoint presentation to accompany
Operations Management Aggregate Planning
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
© 2006 Prentice Hall, Inc.S7 – 1 Capacity Planning © 2006 Prentice Hall, Inc.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Capacity Planning Pertemuan 04
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Chapter 5 Lecture 8 Capacity Planning FOR Products and Services.
Basics of Supply Chain Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
S7 - 1 Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Lecture 23 Order Quantities
Operations Management
Lecture 24 Order Quantities (Continued)
Introduction to Materials Management
13 Aggregate Planning.
Dr Sh Salleh bin Sh Ahmad
Operations Management
Capacity Planning.
Operations Management
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus, Stephen N. Chapman, Ph.D., CFPIM, North Carolina State University, Lloyd M. Clive, P.E., CFPIM, Fleming College Operations Management for Competitive Advantage, 11th Edition, by Chase, Jacobs, and Aquilano, 2005, N.Y.: McGraw-Hill/Irwin. Operations Management, 11/E, Jay Heizer, Texas Lutheran University, Barry Render, Graduate School of Business, Rollins College, Prentice Hall

Objectives Capacity Capacity Management Matching Capacity and Demand Capacity Planning process Resource Planning Inputs to capacity planning

Capacity The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time Determines fixed costs Determines fixed costs Determines if demand will be satisfied Determines if demand will be satisfied Three time horizons Three time horizons

Capacity Management Capacity management is planning and controlling resources needed to meet production objectives –Planning - determining resources needed to meet the priority plan; selecting methods to make that capacity available –Controlling - monitoring output, comparing it with the plan, and taking corrective action

Matching Capacity and Demand Demand Management –vary prices –change lead times –encourage/discourage business Capacity Management –adjust staffing –adjust equipment and processes –change methods to facilitate production –redesign the product to facilitate production

Capacity Planning Process Determine the capacity available at each work center. Translate the released and planned orders into the capacity required at each work center in each time period. Sum up the capacities required for each work center to determine the load on each work center in each time period. Resolve differences between available capacity and required capacity.

Modify capacity Use capacity Planning Over a Time Horizon Intermediate- range planning SubcontractAdd personnel Add equipmentBuild or use inventory Add shifts Short-range planning Schedule jobs Schedule personnel Allocate machinery * Long-range planning Add facilities Add long lead time equipment * * Limited options exist

Resource Planning RP involves long-range capacity resource requirements and is directly linked to production planning. RP involves changes in manpower, capital equipment, product design, or other facilities that take a long time to acquire and eliminate. The production plan and RP set the limits and levels for production.

Rough-Cut Capacity Planning RCCP is the process to check the feasibility of the master production schedule (MPS) (end items), provide warnings of any bottlenecks, ensure utilization of work centers, and advise vendors of capacity requirements.

Capacity Requirements Planning CRP is directly linked to the material requirements plan (MRP) (component items). CRP is the most detailed, complete, and accurate of the capacity planning techniques and is highly important in the immediate time periods.

Inputs for Capacity Planning Inputs needed are: –open shop orders from open order file –planned order releases from material requirements plan –routings and time standards from the routing file –lead times and work center capacities from the work center file

Inputs for Capacity Planning Planned order releases are determined by the computer’s MRP logic based upon the gross requirements for a particular part. Used to help assess the total capacity required in future time periods.

Inputs for Capacity Planning Routing file is the path that work follows from work center to work center as it is completed. It should contain: –Operations to be performed –Sequence of operations –Work centers to be used –Possible alternate work centers –Tooling needed for each operation –Standard times: setup times and run times per piece

Inputs for Capacity Planning Work center file is composed of a number of machines or workers capable of doing the same work. It contains the following information –Move time is the time normally taken to move material from one workstation to another. –Wait time is the time a job is at a work center after completion and before being moved. –Queue time is the time a job waits at a work center before being handled. –Lead time is the sum of queue, setup, run, wait, and move times.

Determining Capacity Available What is Capacity available? –The capability of a system or resource to produce a quantity of output in a particular time period. APICS Dictionary

Determining Capacity Available How do we calculate Capacity? –To calculate available capacity, we need to know: Available time Utilization Efficiency

Available Time Available time depends on the number of machines, the number of workers, and the hours of operation. The number of hours a work center can be used. If a work center has three equivalent machines and works eight hours a day for five days a week, what is its weekly available time? Available time = 3 x 8 x 5 = 120 hours per week

Utilization Utilization is the percentage of time that the work center is actually active. What is the utilization if a work center is available for 120 hours a week, but produces goods for only 100 hours?

Standard Time is the time it would take a qualified operator working at a normal pace to do the job using the proscribed method.Efficiency

Efficiency Efficiency is a measure (as a percentage) of the actual output compared with the standard expected output. What is the efficiency if a work center is used 100 hours per week and produces 120 standard hours of work?

Utilization and Efficiency Problem A work center produces 90 standard hours of work in one week. The hours available are 80, and 70 are actually worked. Calculate the utilization and efficiency of the work center.

Rated Capacity Rated capacity is a measure of the output that can be expected for a work center. Rated Capacity = available time x utilization x efficiency A work center has 3 machines and is operated 8 hours a day for 5 days/week. Past utilization has been 75% & efficiency has been 110%. What is the rated capacity? Available time = 3 x 8 x 5 = 120 hours per week Rated capacity = 120 x 0.75 x 1.10 = 99 standard hours

Rated Capacity Problem A work center consists of six machines that are available 16 hours per day for five days a week. Utilization is 80%, and efficiency is 120%. What is the rated weekly capacity?

Rated Capacity Problem Available time = 6 x 16 x 5 = 480 hours per week Rated capacity = 480 x 0.80 x 1.20 = standard hours

Demonstrated (Measured) Capacity Demonstrated capacity is proven capacity calculated from actual performance data. The result is average capacity. Over the previous four weeks, a work center produced 110, 140, 120, and 130 standard hours of work. What is the demonstrated capacity?

Required Capacity Determining required capacity is a two step process:  determine the time needed for each order at each work center ‚sum up the capacity required for individual orders to obtain a load

Required Capacity Time Needed for Each Order: –The sum of the setup time and the run time A work center is to process 150 units of gear shaft SG 123 on work order 333. The setup time is 1.5 hours, and the run time is 0.2 hours per piece. What is the standard time needed to run the order? Total standard time = setup time + run time = (150 x 0.2) = 31.5 std. hrs.

Scheduling Orders Calculate the operation time required at each work center –Operation time = setup time + (run time per piece x number of pieces) Calculate lead time –Lead time = operation time + queue time + wait time + move time

Scheduling Orders Back Scheduling is to start with the due date and, using the lead times, to work back to find the start date for each operation.

Resolving Differences Change Capacity Overtime or undertime Hiring or layoff Shift work force Alternate routings Subcontract Alter Load Alter lot sizes Reschedule

Design and Effective Capacity  Design capacity is the maximum theoretical output of a system  Normally expressed as a rate  Effective capacity is the capacity a firm expects to achieve given current operating constraints  Often lower than design capacity

Utilization and Efficiency Utilization is the percent of design capacity achieved Efficiency is the percent of effective capacity achieved Utilization = Actual output/Design capacity Efficiency = Actual output/Effective capacity

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Design capacity = (7 x 3 x 8) x (1,200) = 201,600 rolls Utilization = 148,000/201,600 = 73.4% Efficiency = 148,000/175,000 = 84.6%

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Efficiency = 84.6% Efficiency of new line = 75% Expected Output = (Effective Capacity)(Efficiency) = (175,000)(.75) = 131,250 rolls

Bakery Example Actual production last week = 148,000 rolls Effective capacity = 175,000 rolls Design capacity = 1,200 rolls per hour Bakery operates 7 days/week, hour shifts Efficiency = 84.6% Efficiency of new line = 75% Expected Output = (Effective Capacity)(Efficiency) = (175,000)(.75) = 131,250 rolls

Capacity and Strategy  Capacity decisions impact all 10 decisions of operations management as well as other functional areas of the organization  Capacity decisions must be integrated into the organization’s mission and strategy

Capacity Considerations  Forecast demand accurately  Understand the technology and capacity increments  Find the optimum operating level (volume)  Build for change

Economies and Diseconomies of Scale Economies of scale Diseconomies of scale 25 - room roadside motel 50 - room roadside motel 75 - room roadside motel Number of Rooms Average unit cost (dollars per room per night)

Build In Flexibility 100% 100% – 80% 80% – 60% 60% – 40% 40% – 20% 20% – 0 0 – NissanChryslerHondaGMToyotaFord Percent of North American Vehicles Made on Flexible Assembly Lines

End of Lecture 11