The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.

Slides:



Advertisements
Similar presentations
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Advertisements

Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Update on GTE Reverse Flow Study Vaclav Vocilka GIE Vice Executive Secretary Stakeholder Group Meeting GRI SSE, Gdynia 26 June 2009.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
EG pfa-sb Athen_November2005.ppt GIE Annual Conference The View of the Users of Gas Infrastructures Presented by Dieter Pfaff E.ON Ruhrgas AG Chairman.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
Regional Initiative Progress and Next Steps Graeme Steele.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
10 year investment plan ERGEG approach and contribution
Harmonization of Cross Border Transmission Tariffs between
Background and Process
ERGEG GRI South South East – , Maribor
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Gas Regional Initiative
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Gas Quality & TSO – LSO Coordination
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting

Context What is necessary in Europe ? – Ensuring the right investments are made (especially NDIs) – Simplifying access to the European network In order to achieve these targets – The most important requirement is a pan-European view – National solutions in each country does not address these issues because networks would remain fragmented GTE proposal is to work on the 4 following axes at the European level – Network planning & funding – Commercial aspects – Market design – Technical standards General principles driving the “Market players / GTE+ / ERGEG+” operating model are proposed

Network planning A number of supply scenarios would be defined at a high level based on Security of Supply criteria TSOs would work together and with other stakeholders on capacity development between their networks Example: TSOs operating networks A & D TSOs would publish regularly 10-year capacity development plans at their interconnection points The range of European gas supply scenarios (existing, expected, selected “crises”…) would be checked against capacity plans by GTE+, taking into account demand at peak periods. For various levels of risk, consistent infrastructure plans and related costs would be identified. TSO A TSO B TSO C TSO D TSO E Capacity A->D 400Dev. phase 2 (2015) 200Dev. phase 1 (2011) 150Current (2007) Capacity D->A Step / GWh/d

Funding of development plans TSOs would consult the market with view to get funding for their development plans – Part could be built by the TSOs based on shippers commitments – Part could be more problematic as the market shows little interest in booking capacity Gas Regional Initiatives would address the difficulties – Cooperation between National Regulators, TSOs, and stakeholders of the region Funding issues not solved at the Regional level would be escalated to ERGEG+ – ERGEG+ to assess whether the project is of European interest If ERGEG+ cannot fix the problem, it would report to the EC – Ensures identification of the obstacles to meet security of supply criteria – EC to get a list of gas supply scenarios, for which required infrastructure projects face funding issues Such a mechanism would achieve the right balance between ambitious gas supply scenarios and realistic funding of infrastructure

Commercial aspects, Market Design & Technical Standards Commercial aspects should be coordinated at each interconnection points – Open-seasons: bilateral to ensure cross-border consistency – Joint commercialization of short term capacity products Market design: we must avoid a patchwork of 27 “simple” sets of rules throughout Europe. Operational rules such as – Capacity allocation (long vs short term sales, application window vs First Come First Served), – Congestion mechanism, – Quantity allocation, – Balancing rules, – Transparency, should be harmonized at the European level Technical standards will need to be adjusted: – Codification, – Units, – IT Systems.

GTE+/ERGEG+ operating model - general principles Market Players GTE+ERGEG+ Implementation (at national or regional level) Consultation processes Proposals Approval Request for revised proposal Network users’ forum animated by GTE+ would lead to prioritizations of tasks on each of the 4 axes – Elaboration of a roadmap agreed on by stakeholders – Tasks defined in the roadmap will be dealt with by iterations (consultative process) Proposals would then be approved or rejected by ERGEG+ If pace too slow, users would be able to file a complaint to ERGEG+ Legislative changes may be necessary to define pan-European elements: – GTE+ role and ERGEG+ role – legal basis for delivering implementation post ERGEG+ approval Complain