NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.

Slides:



Advertisements
Similar presentations
Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Advertisements

NCSX Mod Coil C1 features requiring rework at PPPL.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
RF Cavity / Coupling Coil Module
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
Process Planning and Computer Aided Process Planning
From Research Prototype to Production
GLAST Large Area Telescope:
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
Pre-Lehman Review Briefing Reiersen December 18, 2006.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Preparations for working on Station 1 November 22, 2005.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
NCSX Vacuum Vessel Fabrication
Stator Plan & Schedule Chris Booth 2nd March 2009
GLAST Large Area Telescope:
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer Review October 11-12, 2006 PPPL

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 2 FPA Concerns and Risks Heavy emphasis on prototyping each activity Crack Work Crew and Support –Our most highly effective and ingenious technicians assigned to perform first time tasks. More time allocated for first time. John Edwards 30 years experience (Master Support Technician), Mike Duco from Lockheed (simulations, manufacturing, coatings, vibrations), Ed Bush 20+ Quality Assurance then NB Ion Sources. –Augmented as needed by cryogenic operators and NB Technicians Learning Curve (Extra time included in schedule) –Perform all tasks first with expert crew – Prove principles to mitigate risk!! And then finalize procedures. –Train secondary support crew to perform bulk of work Tooling –Expert crew perform dry run of tooling First article takes longer and procedures cannot be finalized until techniques have been proven.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 3 FPA Metrology Issues Metrology (Mike Duco with Steve Raftopoulos engineering support) Available equipment in house –Leica Laser: ” accuracy –Romer arm: ” accuracy (2 other Romer Arms available) Reach/Accessibility –Coils are easy to reach but need high accuracy –VVSA is hard to reach but localized activities can use lower accuracy equipment. Availability –Hardware/Software is ~80% available. –Have days of crashing and unpredictable operations. Combination of Windows, Verisurf, MasterCAM, Leica Power Inspect, ROMER… Repeatability –Datums strategically located to provide individual activity support –May need recommendation for datum locations to be used through final machine assembly if datum shift or tolerance buildup is of concern Expert metrology support group being considered within Fabrication Division.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 4 FPA Activity and Risks – Station 1 Station 1 (Install VVSA external components diagnostic coils, cooling tubes, thermocouples using Leica laser tracker or Romer arm) –All three VVSA’s received by 9/30/06 –All work performed on station 1 fixture (2 “rotisserie” stations) with Leica laser tracker & 2 men augmented with 3 technicians when needed –Most risks are identified – Installation Progressing Technique developed to locate diagnostic loop templates Technique developed to adjust interferences (cooling tube studs and thermocouples) Technique developed to install diagnostic templates Technique developed to wind diagnostic loops –Remaining trials: Technique to connect cooling hoses to vertical risers Technique to hold heating tapes in place on vertical ports.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 5 FPA Activity and Risks – Station 2 Station 2 (3 coil preassembly – align, shim, and assembly using Leica laser tracker) –Some risks are identified: Prefit individual mating coils – identify any gross interferences & checkout tooling Required stiffness of adjustable platform –Remaining trials: reaming bolts - accessibility Develop shim technique and use liquid shim Install liquid shim in vertical orientation Installing studs for epoxy shim Installing metal shims (1 hole, 2 hole machined or various thicknesses) Pillow shims

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 6 FPA Activity and Risks – Station 3 Station 3 (install coils onto VVSA using Leica laser tracker) –Align and assemble 2 coil three packs first then onto VVSA –Some risks are identified: Technique developed to manipulate coils onto VVSA –Remaining trials: reaming bolts - accessibility Develop shim technique and use liquid shim Install liquid shim in vertical orientation Installing studs for epoxy shim Installing metal shims (1 hole, 2 hole machined or various thicknesses) Pillow shims

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 7 FPA Activity and Risks – Station 4 & 5 in NCSX test cell Station 4 (install, align and assemble TF Coils using Leica laser tracker) –Trials TBD Station 5 final assembly in NCSX test cell to enhance efficiency and reduce HP overhead (weld ports, install TF coils, leak check, final metrology) –Leak check moved to final assembly –Trials TBD

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 8 “SAFELY SAFELY SAFELY” Documentation and Integrated Safety Management (ISM) Work Plans –Manufacturing Facility Operation Plan (MFOP) covers overall facility conduct using ISM as its basis. –Activities Certification Committee (ACC) independently reviews each station setup, operations, and plans before station is activated.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 9 FPA Process Definitions FPA Manufacturing, Inspection, Test, Quality Assurance Plan (MIT/QA) –Input (Station specific): Dimensional Control Plan FPA Assembly Sequence Plan FPA Specification and Assembly Drawings –MIT/QA provides basis for individual procedures to perform tasks then revised to include developed improvements.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 10 FPA Roll up Schedule

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 11 FPA Manpower Loading Ramp up to full complement beginning FY 08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 12 FPA Metrology Utilization Station 1 and Station 2 FP #1 Station 2 and Station 3 FP #1 and Tooling checks Station 1 FP #3 and Station 2 FP #2 & 3 Station 4 FP #1 & 2 Station 5 FP #1

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 13 FPA Station 1 Activity has begun - Metrology VVSA1_MTM_FINAL_NUMBERSVVSA1_PPPL_BEST_FIT Very good agreement.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 14 FPA Metrology VVSA2_MTM_FINAL_NUMBERSVVSA2_PPPL_BEST_FIT Metrology is serving appropriate needs.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 15 FPA Station 1 Active Station 1 Laser Tracker setup – Diagnostic loops & cooling studs locations Port prefit – weld preparation check

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 16 FPA Summary To Conclude –Our best technicians are assigned to the FPA tasks to mitigate risk. –Some assembly operations are still somewhat conceptual and will be tested out prior to actual work is performed. –Reasonable time is allocated to perform FPA including proof of principle. Open Issues –Some activities are still quite conceptual –Metrology needs augmentation –Datum transferability and tolerance buildup I invite the review team to offer their concerns and provide advice.