Aggregate Planning and Resource Planning Chapters 13 and 14.

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Managing Production across the Supply Chain
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
DOM 301 : Operations Management Practice
Manufacturing Production Control Systems Dr. Ron Tibben-Lembke SCM 461.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1 Operations Management MRP Lecture 22 (Chapter 14)
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Master Production Scheduling
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Production Planning and Control
Materials Requirements Planning
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Inventory Management for Independent Demand Chapter 12, Part 1.
BUAD306 MRP.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Master Production Scheduling (MPS)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Aggregate Planning Chapter 13.
BUAD306 MRP/ERP.
Chapter 16 Materials Requirements Planning
MRP and ERP.
Management Science 2 Material Requirements Planning (MRP)
CHAPTER 14 MRP and ERP.
Material Requirement Planning (MRP)
Introduction to Materials Management
14 MRP and ERP.
Material Requirement Planning (MRP)
MRP Introduction EXAMPLES
Chapter 14 Dependent Demand
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Aggregate Planning and Resource Planning Chapters 13 and 14

Why is Aggregate Planning Important? Operations and supply chain management To ensure that Operations is prepared to meet customer needs Should make-buy decisions be changed? Contracts for raw materials and parts Labor requirements Inventory levels

Why is Aggregate Planning Important? (2) Marketing To ensure that the company's capacity will be used in the most profitable way, considering market constraints If there is not enough capacity, which products or customers will have priority? If there is more capacity than needed, how can the firm sell more?

Why is Aggregate Planning Important?(3) Accounting and Finance To have an accurate budget for operations To ensure adequate cash flow for operations Year-end inventory levels affect earnings forecasts Human resources management If more workers will be needed, plan for hiring and training If fewer workers are needed, plan for layoffs

Aggregate Operations Planning for Services Input: demand forecast by product line by month by facility Output: Labor requirements by month by facility

Aggregate Plan in Manufacturing Input: sales forecast by product line by month for 6-18 months Information in the plan, by product line by month Supply: production and outsourcing (buying from another firm) by product line by month Labor force by product line by month Ending inventory level by month

3 Levels of Planning for Manufacturing

Master Production Schedule (MPS) and Rough Cut Capacity Plan Master Production Schedule (MPS): shows planned production by item, by day or week, for 2 – 6 months Is revised as sales forecast changes Rough Cut Capacity Plan: a calculation to ensure that there is enough capacity to make the items in the Master Production Schedule

Aggregate Production Plan and Master Production Schedule (MPS)

Master Production Schedule

Objective of Material Requirement Planning To ensure that customer demand will be met in a cost-effective way

Ch © 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e Material Requirement Planning (MRP) Computerized inventory control & production planning system for dependent demand Schedules component items and subassemblies when they are needed - no earlier and no later Specifies planned orders for internal production and external purchase

Ch © 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e MRP Terminology Lot size: amount of an item to order. Lead time (LT): elapsed time from order placement to order receipt. LT is assumed to be fixed and known. Planning periods may be days, weeks or months. Must be consistent. Current period = period 1.

MRP Terminology (2) Planned order receipt: order quantity which must be received on a specific date. May be a work order or a purchase order. Planned order release: order quantity which will be released on a specific date. Available to promise: amount of inventory and planned production which is available to fill new customer orders.

MRP Process MRP requires data accuracy in all files. (Planned order report)

Databases Used in MRP Calculation Bill of material file: list of parts, raw materials, and subassemblies for each finished good Quantity required for each item Order of assembly (how product is put together) Inventory records file: amount of each finished good, part, raw material, and subassembly in inventory, plus amounts already ordered and expected dates of receipt