7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.

Slides:



Advertisements
Similar presentations
MPCA Citizens’ Board Information Item February 25, 2014.
Advertisements

Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
PROPOSED REGIONAL GROUNDWATER REMEDIAL ACTION ROOSEVELT IRRIGATION DISTRICT June 11, 2010.
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Biodegradation and Natural Attenuation
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Dale T Littlejohn Senior Geologist. What is fate and transport in the vadose zone? Vadose Zone Hydrocarbon release from buried pipeline Aquifer Surface.
H23A14 Briton Ferry Gas Works Land Contamination Antreas Christodoulides Georgios Efstathiou Antreas Christodoulides Georgios Efstathiou.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
IMPORWARE EGYPT - WP2 Activities. Egyptian Environmental Affairs Agency (EEAA) Established according to the Law 4/1994 (later amended by Law 9/1999) for.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
Factors that Influence the Occurrence of Nitrate in the Upper Willamette Valley Basic Groundwater Hydrology Understanding Nitrate and its Distribution.
Fate and Transport of Chemicals A Presentation by Terrie Boguski Technical Outreach Services for Communities (TOSC) Great Plains/Rocky Mountain Hazardous.
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Vadose-zone Monitoring System
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
Background and lessons learned Managers Meeting February 13, 2014.
Ground Water Conditions around the Lathers Property Town of Waukesha Douglas S. Cherkauer PhD, PG, PH November 15, 2007.
Part 1: Water Water is stored in “reservoirs” –Oceans –Lakes –Rivers –Atmosphere –biosphere.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
GROUND WATER MONITORING TO EVALUATE EFFECTS OF LAND USE ON WATER QUALITY Mike Trojan Erin Eid Jennifer Maloney Jim Stockinger Minnesota Pollution Control.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Haley & Aldrich, Inc. 1 Preliminary Draft Community Advisory Board West Van Buren WQARF Site WVB Working Group - Draft Final Feasibility Study Work Plan.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
Prepared By: Presented By: Lawrence H. Ernst, PG, CEG, CHG Principal Hydrogeologist/Wood Rodgers November 21, 2014.
Water Supplies Strategies and Techniques to Meet Growing Demands.
Preparing a Site Conceptual Model. Typical Site Management Problems: Site complexities  Complicated hydrogeology  Multiple contaminants of concern (COCs)
Environmental Toolbox. Technical Module Introduction.
Probability of Detecting Atrazine and Elevated Concentrations of Nitrate in Colorado’s Ground Water USGS Water-Resources Investigations Report
MPCA Groundwater Roles
1 Section 4- Characterization  Characterization is 95% of the Success of ISCO  Develop a complete and comprehensive Conceptual Site Model  ISCO is a.
Hydrogeologic Analysis of the Delphi Corporation Site, Wyoming Michigan Mark Bryson, Emily Daniels, Sara Nagorsen, Kirk Perschbacher, Joe Root, Jason Stewart,
Evaluating the Practicality of LNAPL Recovery Jeff Lane, P.G. November 17, 2015 International Petroleum Environmental Conference (IPEC) IPEC 22 Contact.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Feasibility Study Workplan Park – Euclid RP Group Community Advisory Board Meeting May 23, 2013.
Protection of ground water meeting UPUS Determining ground water zones – Ground water definition – Determining how many zones Examples POGWMUPUS and GW.
Jim Stockinger, Erin Eid, Jennifer Maloney and Mike Trojan
Western Avenue WQARF Site Western Avenue/Phoenix Goodyear Airport CAG Meeting of August 8, 2013 Delfina Olivarez.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Former Spellman Engineering Site Project Update Meeting March 18, 2008 William C. Denman, P.E. Remedial Project Manager (404)
Unity Ground Water Investigation Steve Faryan, USEPA.
Proposed Plan for No Further Action
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Groundwater Contamination
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Chemical Metals Industries, Inc. (CMI)
Reclaimed Water Funding
Welcome.
Qays Jasim Saud Syed E. Hasan Department of Geosciences
ENHANCED BIOREMEDIATION PILOT USING iSOC® TECHNOLOGY AT A FORMER MANUFACTURED GAS PLANT CASE STUDY PREPARED BY: MR. DAVID WORK, PE RETEC GROUP.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Warmup 10/22/12 As the population of Durham increases…
Groundwater.
Association of State Drinking Water Administrators
Ch 11 Water Page 289.
Hydrologic Investigation Summary
Brownfield Corrective Action with Revised RRS
Chemical Metals Industries, Inc. (CMI)
Forum on the strategies for the management and development of contaminated sites in Taiwan Shian-chee Wu October 25, 2007.
Groundwater Vocabulary
Preparing a Site Conceptual Model
Presentation transcript:

7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013

Monitor well network sampled January Ground water samples indicated a significant increase of tetrachloroethene (PCE) concentrations in the source area wells at both properties. Increasing water table elevations are suspected of mobilizing additional contaminants from the soils to the groundwater. Data received from Salt River Project indicated their well, located approximately one-half mile north of the source area, has been impacted at the Aquifer Water Quality Standard of 5 parts per billion. This well is cased from land surface to a depth of 600 feet and the interval open to the aquifer for water production is from 240 to 600 feet Groundwater Monitoring Results

7 th Avenue and Bethany Home Road Site Map

North-South Geologic Cross section

2012 Groundwater Monitoring Results

SRP Well 10.1N-13.5E Historical PCE Results

Final Remedial Investigation Report completed in April 2011 included the Remedial Objectives (ROs) for the site. Based upon review of public comment, the ROs are based on the following: Protect against possible exposure to hazardous substances in surface and subsurface soils that could occur during development of property based upon applicable zoning regulations. Protect against possible leaching of hazardous substances from the upper portion of the aquifer into deeper portions of the aquifer where groundwater use is occurring. Remedial Objectives Review

Based on public comment, ROs for current and future agricultural groundwater use in the 7th Avenue and Bethany Home Road WQARF site are: “To protect the supply of groundwater for irrigation use and for the associated recharge capacity that is threatened by contamination emanating from the 7th Avenue and Bethany Home Road WQARF site...” Remedial Objectives Review

Feasibility Study (FS) completed November Due to increases of PCE concentrations at the site, the FS evaluated three methods to reduce concentrations in the groundwater at the source area. 1. Enhanced reductive dechlorination (ERD) 2.In situ chemical oxidation (ISCO) 3. Groundwater Extraction and Treatment (GWET) Feasibility Study

Feasibility Study Cost Comparison

Based on the cost and other factors, ERD was selected for the pilot test at the site. ERD is preferred over the similarly priced GWET because it has the ability to destroy the volatile organic compounds in place and the potential to be completed in a quicker time frame. Feasibility Study

Dechlorination Occurring at MW-12

Feasibility Study/Pilot Test

Questions? Questions

Contact Information Scott Goodwin, Project Manager Remedial Projects Section (602) , ext Wendy Flood, Community Involvement Coordinator Remedial Projects Section (602) , ext Contact info