Doc.: IEEE P802.11-15/0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July 2015 802.11ak Agenda Date: 2015-07-15 Authors: NameAffiliationsAddressPhoneEmail.

Slides:



Advertisements
Similar presentations
Doc.: IEEE P /0498r1 Submission May 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 May ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Advertisements

Doc.: IEEE /0715r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 IEEE TGaq Teleconference Agenda for May to July 2015 Date:
Doc.: IEEE /0233r0 Agenda March 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /1562r0 Submission January 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for January 2015.
Doc.: IEEE /0737r0 Agenda July 2015 Stephen McCann, BlackBerrySlide 1 Publicity SC Agenda Date: Authors:
Doc.: IEEE /0236r0 Submission March 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for March 2015.
Doc.: IEEE /0723r4 Agenda July 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE P /64r8 Submission January 2013 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 January ak Agenda Date: Authors:
March 2015 Agenda doc.: IEEE /0234r2 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
Doc.: IEEE /0021r0 Submission January 2011 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Doc.: IEEE P /1504r3 Submission January 2014 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 January ak Agenda Date: Authors:
Doc.: IEEE P /0982r5 Agenda September 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 September ak Agenda Date: Authors:
Doc.: IEEE s Submission March 2015 Shoichi Kitazawa,ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE P /0982r0 Submission September 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 September ak Agenda Date:
Doc.: IEEE sru Submission October 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0718r0 Submission July 2015 Edward Au (Marvell Semiconductor)Slide 1 Task Group AY July 2015 Agenda Date: Authors:
Doc.: IEEE /1224r1 Submission September 2008 Jesse Walker, Intel CorporationSlide 1 IEEE TGw October Agenda Date: Authors:
Doc.: IEEE /1001r0 Submission Sept 2012 Jon Rosdahl (CSR)Slide 1 Sept 1 st Vice Chair Report Date: Authors:
Doc.: IEEE /0481r1 Submission May 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for May 2015 Date:
Doc.: IEEE P /0734r3 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE P /1320r6 Submission November 2014 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 November ak Agenda Date: Authors:
Doc.: IEEE P /1264r4 Submission November 2012 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 November 2012 General Link Agenda Date:
IEEE q SubmissionChiu Ngo (Samsung)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE s Submission May 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1511r0 Submission January 2016 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for January 2016.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE /0492r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 Publicity SC Agenda Date: Authors:
Doc.: IEEE P /1220r1 Agenda November 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 November ak Agenda Date: Authors:
Doc.: IEEE P /0792r1 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Ad Hoc Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
HL7 / ISOTC215 / IEEE11073 Device Communication Work Group Agenda January 11-16, 2009, Orlando, FL.
Doc.: IEEE P /0498r10 Submission May 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 May ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0983r0 Submission September 2015 Yongho Seok (NEWRACOM)Slide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for September.
January 2015 Agenda doc.: IEEE /0234r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-mar-2015 Date: Authors:
Doc.: IEEE /0342r2 Submission March 2011 David Halasz, OakTree WirelessSlide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for March.
Doc.: IEEE s Submission November 2014 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1031r5 Agenda September 2014 Stephen McCann, BlackberrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /0491r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /0846r0 Submission July 2015 Slide 1 Date: Authors: IEEE aj Task Group July 2015 Report Jiamin Chen (Huawei/HiSilicon),
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Doc.: IEEE /0217r7 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: May 2016.
Doc.: IEEE /1230r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: November 2015.
Doc.: IEEE P /0229r7 Agenda March 2016 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 March ak Agenda Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
May 2014 Agenda doc.: IEEE /0488r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
July 2014 Agenda doc.: IEEE /0753r0 Mark Hamilton, Spectralink Corp.Slide 1 ARC-agenda-may-2014 Date: Authors:
IEEE ah Sub 1 GHz license-exempt operation Agenda for July 2014
155 Beaver Street, Milford, MA USA
IEEE aj Task Group May 2017 Agenda
November ak Agenda Authors: November 2017 Date:
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, Jan 2015.
November ak Agenda Authors: November 2017 Date:
January ak Agenda Authors: January 2015 Date:
Sept 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for IEEE q (ULP) Task Group,
November ak Agenda Authors: November 2017 Date:
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, July 2015.
IEEE TGw September Agenda
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, May 2015 Meeting.
TGae Agenda Date: Authors: November 2011 September 2009
IEEE TGaz February Teleconference Agenda
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
IEEE aj Task Group September 2017 Agenda
November ak Agenda Authors: November 2017 Date:
TGmb Teleconferences January 2010 through March 2010
TGae Agenda Date: Authors: March 2011 September 2009
IEEE TGw July Agenda Date: Authors: July 2008
IEEE aj Task Group January 2017 Agenda
IEEE aj Task Group May 2016 Agenda
Presentation transcript:

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 1 July ak Agenda Date: Authors: NameAffiliationsAddressPhone Donald Eastlake Huawei Technologies 155 Beaver Street, Milford, MA USA

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 2 IEEE ak/GLK: Enhancements For Transit Links Within Bridged Networks Waikoloa, Hawai‘i July, 2015 Chair & Editor: Donald E. Eastlake 3 rd (Huawei) Vice Chair: Mark Hamilton (Ruckus Wireless) Vice Editor: Norm Finn (Cisco) Secretary: Vacant Mailing list:

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 3 Venue Hilton Waikoloa, Big Island, Hawai‘i

doc.: IEEE P /0734r6 Submission TGak Timeline At Start of Meeting –March 2015– Initial WG Ballot on D1.0 –September 2015 – WG Recirculation –March 2016– Sponsor Ballot Pool Formation –May 2016 – MEC/MDR Done –July 2016 – Initial Sponsor Ballot –November 2016 – Sponsor Recirculation –January 2017 – Final WG & ExecComm & RevCom Approval July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 4

doc.: IEEE P /0734r6 Submission Sessions DayTimeRoom MondayAM1 Ad HocWaikoloa 2 TuesdayAM1Waikoloa 2 TuesdayEVEQueens 4 WednesdayPM1Queens 4 WednesdayPM2Queens 4 ThursdayAM1 (joint with ARC and 802.1)Kings 2 ThursdayAM2Queens 4 ThursdayPM2Queens 4 July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 5

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 6 Monday, 13 July :00 – 10:00, Wakoloa 2 Room Call ad hoc meeting to Order. Review of IEEE 802 and Policies and Procedures on Intellectual Property, Inappropriate Topics, Etc. –Call for essential patent claims: no response. Attendance Recording Reminder Approval of Agenda Presentation of submissions to resolve comments, discussion of comments –11-15/791r0, “Addressing Simplifications”, David Kloper –Discussion of CID 229. –11-15/795r0, “Addressing Comment Resolutions”, David Kloper Adjourn ad hoc meeting

doc.: IEEE P /0734r6 Submission Participants, Patents, and Duty to Inform  All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represent. “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search July 2015 Slide 7Donald Eastlake 3rd, Huawei Technologies

doc.: IEEE P /0734r6 Submission Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at July 2015 Slide 8Donald Eastlake 3rd, Huawei Technologies

doc.: IEEE P /0734r6 Submission Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted July 2015 Slide 9Donald Eastlake 3rd, Huawei Technologies

doc.: IEEE P /0734r6 Submission Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. July 2015 Slide 10Donald Eastlake 3rd, Huawei Technologies

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 11 Tuesday, 14 July :00 – 10:00, Waikoloa 2 Room Call meeting to Order. Stephen Pope (Self) volunteered to be temporary Secretary for this session. Review of IEEE 802 and Policies and Procedures on Intellectual Property, Inappropriate Topics, Etc. Attendance Recording Reminder Agenda (734r4) approved by unanimous consent Discussion of timing relative to 802.1AC revision and possibilities of referencing or not references ak at various states. Approval of the Minutes of the May ak Meeting in Vancouver, British Columbia: 11-15/0690r0. –Approved by unanimous consent.

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 12 Tuesday, 14 July :00 – 10:00, Waikoloa 2 Room Approval of the Minutes of Teleconferences since Vancouver: –June 1 st, 11-15/750r0, “11ak Telecon Minutes ” –June 15 th, 11-15/765r0, “11ak Telecon Minutes ” –June 29 th, 11-15/782r0, “11ak Telecon Minutes ” –Approved by unanimous consent. Approval of the Minutes of the Santa Clara, California, ad hoc meeting (9&10 July), 11-15/0792r2, “July ak Ad Hoc” –Approved by unanimous consent. Approval of the Minutes of the Monday ad hoc meeting: –11-15/0893r0, “11ak 13 July ad hoc meeting minutes” –Approved by unanimous consent.

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 13 Tuesday, 14 July :00 – 10:00, Waikoloa 2 Room Initial discussion of timeline. Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: 11-15/725r3, “11ak PICS Fix”, Donald Eastlake (Huawei) /798r1, “11ak Vancouver Resolution Fixes”, Donald Eastlake (Huawei) /0795r0, “Addressing Comment Resolutions” (doc), David Kloper (Cisco) 11-15/791, “Addressing Simplifications”, David Kloper (Cisco) Recess until 18:30.

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 14 Tuesday, 14 July :30 – 21:30, Queens 4 Call meeting to Order. Michael Fisher (Fisher Consulting) volunteered to be temporary Secretary for this session. Call for essential patents. –No response. Attendance Recording Reminder Approval of Agenda Moved, to approve the comment resolutions in 11-15/735r3 “11ak PICS Fix” and direct the Editor to incorporate them into the P802.11ak draft. –Straw poll at Santa Clara ad hoc: Yes: 5 No: 0 Abstain: 0 –Mover: David KloperSeconder: Michael Fisher –Vote: Yes: 4 No: 0 Abstain: 0

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 15 Tuesday, 14 July :30 – 21:30, Queens 4 Moved, to approve the comment resolutions in 11-15/798r1 “11ak Vancouver Resolution Fixes” and direct the Editor to incorporate them into the P802.11ak draft. –Straw poll at Santa Clara ad hoc: Yes: 5 No: 0 Abstain: 0 –Mover: David KloperSeconder: Michael Fisher –Vote: Yes: 4 No: 0 Abstain: 0 No objection to asking for the Wednesday PM1 slot that was released by TGaj. Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: 11-15/0795r0, “Addressing Comment Resolutions” (doc), David Kloper (Cisco) Recess until 16:00 Wednesday –[At the mid week WG plenary, a PM1 session for TGak Wednesday was approved.]

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 16 Wednesday, 15 July :30 – 15:30, Queens 4 Room Call meeting to Order. Call for essential patents. Attendance Recording Reminder Approval of Agenda Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: Recess until 16:00 today

doc.: IEEE P /0734r6 Submission Pending Presentations 11-15/0795r0, “Addressing Comment Resolutions” (doc), David Kloper (Cisco) 11-15/791, “Addressing Simplifications”, David Kloper (Cisco) 11-15/0556 July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 17

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 18 Wednesday, 15 July :00 – 18:00, Queens 4 Room Call meeting to Order. Call for essential patents. Attendance Recording Reminder Approval of Agenda Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: Moved, to approve the comment resolutions in the Santa Clara tab of 11-5/556r7 and direct the Editor to incorporate them into the draft. –Yes: No: Abstain: Recess until 08:00 Thursday

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 19 Thursday, 16 July :00 – 10:00, Kings 2 Room Call TGak Joint Meeting with ARC SC and 802.1Qbz to Order IPR and Attendance Recording Reminder Approval of Agenda 802.1Qbz / 802.1AC / ak status ak Teleconferences, joint with 802.1Qbz if mutually convenient: –1 hour teleconferences through the September meeting on Mondays the 3 rd, 10 th, 17 th, and 31 st of August at 10am Eastern time. –Yes: No: Abstain: Presentation and discussion of submissions and issues Recess TGk until 10:30 today

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 20 Thursday, 16 July :30 – 12:30, Queens 4 Room Call TGak Meeting to Order IPR and Attendance Recording Reminder Approval of agenda Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: GLK-GCR: –11-15/724r2 (doc), 11-15/150r9 (ppt), Ganesh Venkatesan (Intel) –11-15/796r0 (doc), Ganesh Venkatesan (Intel) Recess until 16:00 today

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 21 Thursday, 16 July :00 – 18:00, Queens 4 Room Call TGak Meeting to Order IPR and Attendance Recording Reminder Approval of agenda Presentation of submissions to resolve LB212 comments and improve the P802.11ak draft: Motions –Change the TGak timeline by moving WG recirculation from September 2015 to November 2015.

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 22 Thursday, 16 July :00 – 18:00, Queens 4 Room Moved, to approve the comment resolutions in the Waikoloa tab of 11-15/556rTBD and direct the Editor to produce a Draft P802.11ak_D1.2 incorporating all P802.11ak resolutions approved at this meeting through and including those approved by this motion. –Moved: Seconded: –Yes: No: Abstain: Further work on comment assignment and drafting of comment resolutions. Adjourn TGak

doc.: IEEE P /0734r6 Submission July 2015 Donald Eastlake 3rd, Huawei TechnologiesSlide 23 [Reference Information] ak PAR and Five Criterion –12/1207r1, “ GLK Draft PAR” –12/1208r0, “ GLK Draft 5C” Draft 1.0 of ak and results of Letter Ballot 212: – P802.11ak_D1.0.pdfhttp:// P802.11ak_D1.0.pdf –11-15/556r6, “TGak LB212 Comments” Draft 2.1 of 802.1Qbz is at – 1.pdfhttp:// 1.pdf Draft 2.0 of 802.1AC-REV is at – rev-d2-0.pdfhttp:// rev-d2-0.pdf (You can access drafts with the user name and password and vice versa.)