Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCs Préparation to the ISO TC 224 Drafts Standards test.

Slides:



Advertisements
Similar presentations
9 November 2007 Cecilia de la Rosa Head of the Internal Quality Unit How to prepare for an external review Current trends in the European Quality Assurance.
Advertisements

Impact of the evaluations and follow-up activities M. Assunção, 13 October 2008 EUA Institutional Evaluation Programme, Workshop for Universities: round.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
BUILDING PARTNERSHIPS FOR ENERGY SECURITY
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
METHODOLOGY FOR THE REVIEW/EVALUATION OF POLICY DOCUMENTS By Kwami DADJI, Health Officer HIV/AIDS, TB, Malaria & OID African Union Commission.
SSATP ANNUAL MEETING 2010 Kampala, UGANDA OCTOBER 18-21, 2010 TRANSPORT STRATEGY UPDATING PROCESS IN BURKINA FASO Sub-Saharan Africa Transport Policy Program.
Business research methods: data sources
CONTACT SEMINAR November 2008 Project management tools.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
African Project Implementation of the 2008 System of National Accounts.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Participative Methods on Cultural Value Management in Rural Areas György Fekete Central Transdanubian Regional Innovation Agency Nonprofit Ltd. Budapest,
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
December To share best practices from the experience of 100 NSDS implemented over the last years. To take into account international community.
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
A Review of the Standing Committee of Caribbean Statisticians (SCCS) as a Mechanism for Statistical Development and Harmonisation The Second Meeting of.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
PRESENTATION IV Cycle of the Structured Dialogue.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Cairo, 20 December 2004 National Strategy for the Development of Statistics (NSDS) Roadmap.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Budget support training Module 5 Transparency and oversight of the budget (Third eligibility criterion) Version October 2013.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
Machinery and Equipment and PPPs Richard Dibley 3 rd Technical Advisory Group Meeting.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
Antonio Mocci Mestre, January 17, 2011 Lead partner: Governance of the project monitoring, evaluation and dissemination systems.
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Observatories for the Health Workforce in Africa VIII REGIONAL MEETING OF THE OBSERVATORIES OF HUMAN RESOURCES FOR HEALTH IN THE AMERICAS LIMA, PERU
ACTED AME Appraisal, Monitoring and Evaluation. Summary 1/ ACTED AME department 2/ AME Responsibilities 3/ AME throughout project cycle 4/ Involvement.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
PARIS21 Light Evaluation Report to the Steering Committee meeting in April 2006 on the evaluation and with recommendations on the future of PARIS21, including.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Tracking Environmental Performance - Tomas Pivoras, Kaunas University of Technology, Kaunas, Lithuania 1 Tracking Environmental Performance Tomas Pivoras.
W. Schiessl, AGRI E.II.4 Programme management and institutions involved in monitoring and evaluation.
Seite 1 GTZ Independent Evaluation in the Thematic Priority Area “Decentralization” (2008) Overview of Results and Recommendations Implications.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Country-led Joint Evaluation Dutch ORET/MILIEV Programme in China NCSTE Country-led Joint Evaluation Dutch ORET/MILIEV Programme in China Chen Zhaoying.
Participatory Monitoring and Evaluation of Community Projects – A Model Pretoria, South Africa 30 November – 3 December 2009.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
2 Seas Monitoring and Evaluation approach INTERACT seminar – Evaluation Plan workshop Vienna, 12 November 2015.
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Development and Energy in Africa
Predetermined Objectives – 2013/14
Module 1: Introducing Development Evaluation
Lithuanian Standards for Evaluation of EU Structural Funds
05 April 2016 Briefing to the Portfolio Committee on review of the draft APP - Department of Arts and Culture.
16 May 2018 Briefing to the Portfolio Committee of the Department of Sport and Recreation portfolio on the review of the draft APP.
Christophe Duhamel Global Office Coordinator, FAO Statistics Division
Statistics Governance and Quality Assurance: the Experience of FAO
Role of external contractors - Assistance, monitoring and evaluation
Evaluation plans for programming period in Poland
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Helene Skikos DG Education and Culture
Development of energy balance statistics
Task Force on Target Setting and Reporting TFTSR
Presentation transcript:

Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCs Préparation to the ISO TC 224 Drafts Standards test in Africa. WBI/NWSC WORKSHOP OUGANDA, KAMPALA, JULY, 24th TO 27th 2007

WBI/NWSC Workshop, Kampala2 Proposition of a methodology for the test of the standards in Africa Ingrid PICARD URBACONSULTING

WBI/NWSC Workshop, Kampala3 Objectives for testing the standards  To verify the relevancy of these standards in Africa  Are they considered useful by the stakeholders?  Do they contribute to improve water and sanitation services?  To analyse the results of the test process of the standards  To propose changes which take into account the specific context of African countries

WBI/NWSC Workshop, Kampala4 Objectives for testing the standards  To develop an ISO guidebook for the application of the 24510/24511/24512 standards, specifically adapted to African realities, and to facilitate the dissemination of these standards

WBI/NWSC Workshop, Kampala5 Objectives of the workshops  To present the standards  To present the proposed methodology for testing the standards  To discuss this proposition  To verify the motivation of local stakeholders  To propose a road-map for the next deadline

WBI/NWSC Workshop, Kampala6 The global process

WBI/NWSC Workshop, Kampala7 What does it mean ‘To test the standards’?  To test the standards means:  To implement the standard as it stands, for a long time period (+/- 2 years)  To implement 2 or 3 of these standards: o ISO for each site o + ISO for the sanitation service and/or ISO for the water supply service  To follow the 6 stages described below

WBI/NWSC Workshop, Kampala8 Stage 1: Identification of the stakeholders  Stakeholders are numerous but it is essential to have at least the participation of:  Users  Responsible bodies  Operators  Regulatory bodies  A Test Pilot Comitee, including a representative of all these stakeholders, will be created. It will be in charge of the application of the test of the standards on the site

WBI/NWSC Workshop, Kampala9 Stage 2: Preparation of implementation  This stage will be essential for the test of the standards. It will consist of:  Analysing the whole standards  Producing a shared vision of the objectives for improving services  Analysing gaps with regards to existing situation  Identifying priority action plans  Choosing indicators  Designing a monitoring system

WBI/NWSC Workshop, Kampala10 Partial evaluation  At the end of stage 2 an evaluation will be done  The test will continue if consensus and realistic action plans have been identified  The test will end if not…  An initial version of the Application Guidebook could be draft at this stage

WBI/NWSC Workshop, Kampala11 Stage 3: Implementation  Stage 3 is the implementation phase of the test. Actions will be:  Implementation of priority action plans  Monitoring the indicators  Coordination with the African level and the external partners

WBI/NWSC Workshop, Kampala12 Stage 4: Analysis of the impact  Evaluation of the activities undertaken during the stage 3 will allow an analysis of the progress made  If possible, new objectives and action plans could be identified (return to stage 2) to carry out the improvement of services

WBI/NWSC Workshop, Kampala13 Stage 5: Evaluation and global synthesis for generalisation  Local level evaluation  Collect the opinions of the stakeholders involved  Measure the effects of the implementation of the standards on the water and sanitation services  Global evaluation and analysis of the results  Analysing the results of all the test sites  Conclusion on the applicability of the standards in African countries  Composition of the ‘Standards Application Guidebook’

WBI/NWSC Workshop, Kampala14 Stage 6: Continuing with standards implementation  The implementation of the standards can be carried out even after the end of the project  The improvement of the service is a long process, which never really end…

WBI/NWSC Workshop, Kampala15

WBI/NWSC Workshop, Kampala16 African specifics (1/2)  Weak governance (unclear institutional organisation) and lack of dialogue between stakeholders  Many informal operators (with poor accounting, no contract…), even if they have thousands of customers and a good quality of service

WBI/NWSC Workshop, Kampala17 African specifics (2/2)  Monitoring systems are often weak or even lacking: data collection is very difficult, then calculation of performance indicators are not easy to make

WBI/NWSC Workshop, Kampala18 Forward-looking planning (1/3)  Beginning of the test phase: early 2008  Months 1 to 3: identification of the stakeholders and creation of the test Pilot Committee;  Months 3 to 4: analysis of the standards content; definition of objectives / evaluation criteria and associated performance indicators;  Months 4 to 5: collection of available data, taking advantage of the human resources found in the Pilot Committee;  Months 5 to 6: evaluation of the initial situation and determination of the « zero value » for each of the performance indicators that will have been selected as relevant

WBI/NWSC Workshop, Kampala19 Forward-looking planning (2/3)  Months 6 to 24: application of the standard  implementation of the procedures in order to obtain reliable data with which calculate the performance indicators; standard should be tested for 18 to 24 months  Months 24 to 26:  evaluation of the final situation and analysis of the contribution of the standard to the improvement of the service;  elaboration of recommendations to the ad hoc group for changes to make to the standards as a function of the specific constraints/difficulties at each site, whether they reflect, or no, African realities

WBI/NWSC Workshop, Kampala20 Forward-looking planning (3/3)  Months 26 to 30:  centralisation of the results from the whole of the group of test sites by ad hoc DC group  global synthesis of the results obtained at the test sites and formulation of recommendations (final consolidated version) to the ISO technical committee for eventual changes to the standards (for the review study of the standards in 2010).  This calendar will be refined and adapted for each site.  Every six months, the meetings of the SC5 “Norms ISO TC224” of the AfWA will be an opportunity to give updates on the progress of the process in each single site.

WBI/NWSC Workshop, Kampala21 Thanks for your attention! Ingrid Picard