Best Value Fire Alarm RFP; Refer to RFP FG102015 For Project Specifications.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Project Procurement & Contract Administration Jiwei Ma
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
Roadmap for Sourcing Decision Review Board (DRB)
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Ensure Vendor/Engineer of Choice Product Quality
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Weekly Risk Report & Performance Metrics
Identifying and Selecting Projects
Chapter 3 Project Initiation
1 A six-pack of major RFP problems A Best Practices Training CD by Michael Asner
Lesson 5 Computer-Related Issues
5/17/2015 Pre-Proposal Meeting Best Value Model. This presentation is being provided for educational purposes only Please refer to the RFP for specific.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
The Best-Value Business Model
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Risk Assessment and Value Added Plans John Savicky Arizona State University May 2013.
S/W Project Management
Server Virtualization: Navy Network Operations Centers
This presentation is for educational purposes only Refer to the project RFP for specific details and instructions If there are any inconsistencies, the.
City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University.
Performance Based Studies Research Group Pre Award Phase.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Performance Based Studies Research Group #SW092: Waste Management Contract.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Day 2.  Questions??  Blackboard updates  IP Projects discussions  Why project management??  Assignment 1 posted in Blackboard ◦ Due in one week;
This presentation is for Educational purposes only. The RFP will contain final instructions.
This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies, the.
This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies, the.
Introductions Brian Lines Arizona State University December 2013.
Best Value Model Pre-Proposal Information RFP Rebecca Cohn Theatre Seating Renewal.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Best Value Business Model Supplemental Pre-Proposal Information Video RFP : Part A Design-Build St. Joseph’s College Residence.
SacProNet An Overview of Project Management Techniques.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Introducing Project Management Update December 2011.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
BU610 Applied Business Research 2015 Section A (Waterloo Part-time MBA) Faculty Advisors: Shelly Jha Detlev Nitsch Jack Schnabel.
The Best Value Business Model Paul Dugal SCMP (C.P.P.), C.I.M. Manager - Purchasing Services University of Manitoba
Performance Based Studies Research Group Pre Award Phase.
Overview John Savicky Arizona State University May 2013.
Strategic sourcing is a Price Based approach to supply chain management that formalizes the way information is gathered and used so that an organization.
PIPS!!! Performance Information Procurement System.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
This presentation is for Educational purposes only. The RFP/RFQ will contain final instructions.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
The University of Texas Medical Branch Business Operations and Facilities Consulting ServicesPre-Proposal Meeting Terrie Beasley, CTP UTMB Health, Purchasing.
Performance-Based Contracting PIPS Performance Information Procurement System Jacob Charries Central Purchasing
A six-pack of major RFP problems
This presentation is being provided for educational purposes only Please refer to the RFP for specific instructions If there are any inconsistencies,
Waste Audit Education Session
Procurement Management
Systems Analysis and Design in a Changing World, 4th Edition
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
(Additional materials)
Request for Proposal - Best Value
Chapter 12: Project Procurement Management
Request for Proposal - Best Value
Lesson 5 Computer-Related Issues
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Statewide Public Communications Services RFP#
Presentation transcript:

Best Value Fire Alarm RFP; Refer to RFP FG For Project Specifications

Agenda 1. Arizona State University Research and Teaching of Best Value Procurement. 2. What Do We Look For When We Look For Supplier. What Does a Supplier Do When Looking for A Customer. 3. The Best Value Process

20 Years | 210+ Publications | 550+ Presentations 2,000+ Projects | $4.6 Billion Procured

InformationTechnology networking data centers hardware COTS software ERP systems help desk services eProcurement FacilityManagement maintenancelandscaping security service building systems industrial moving waste management energy management custodialconveyance pest control Health Insurance/ Medical Services Manufacturing Business / Municipal / University Services dining multi-media rights fitness equipment online education document management property management audiovisual communications systems emergency response systems laundry material recycling bookstoresfurniture Construction / Design / Engineering large gc infrastructuremunicipallaboratoryeducationhospitalfinancial large specialty small gc renovationrepairmaintenanceroofingdemolitiondevelopment supply chain DBBCMARDBIDIQJOC Low Bid IPD

Current Canadian Efforts – University of Alberta – University of Ottawa – University of Manitoba – Wilfrid Laurier University – Queen’s University – University of Waterloo – Western University – Dalhousie University – Simon Fraser University – City of Spruce Grove – Alberta Infrastructure – Workers Comp (NS)

UofM Partnered With Arizona State University (ASU) UofM Partnered with ASU in March 2013 It Started Out As An Alternative to Low Bid Construction Tendering Can Be Applied Different Procurements. UofM Applications Construction- Bird Construction – Windows Project Bannatyne Campus Food Service- Aramark Cold Beverage- Coke Fitness Equipment for Active Living Center- STAK Fitness IT Project (Identity and Access Management)- In Process Fire Alarm Monitoring- In Process

Objective of Minimum Standards Supplier 1 Supplier 2 Supplier 3 Supplier 4 High Low Supplier High Low

Who Will Be Selected Supplier 1 Supplier 2 Supplier 3 Supplier 4 High Low Supplier 2 Supplier 4 High Low Supplier 1 Supplier 3

Perception of Standard

What Percent of RFP’s Are 100% Accurate?

What is Best-Value? Win-Win Client: Outsource to experts Higher performance Less management and resources Supplier Control of project/service Ability to increase profit by maximizing their efficiency

Factors For Success- Client Of Choice Fair and Open (state/follow rules/open to all with experience) Impartial and Transparent (minimize evaluator bias / provide debriefing) Efficient (minimize efforts) Award based on valu e

What Would You Purchase

Which Would You Purchase??

What is Dominant Information

Our Goal Is To Obtain the Least Amount of Paper with the Most Important Information.

Written Approach Goal is to keep process efficient Minimize marketing material or general information Only focus on the specific project Only look at Risks and Value Added Ideas

Best-Value RFP Best-Value does not mean: –Eliminate the specification –Eliminate the standards –Eliminate the requirements Suppliers must now understand that these are the clients best attempt at identifying what they need. The RFP will still contain: –Goals, expectations, desired outcomes, requirements –Current conditions RFP

Best Value Process/System Proposal ($) Schedule Past Performance Risk Assessment Value Assessment Interviews 19 Clarification Pre-Planning Award Weekly Reporting Post Award Metrics Final Documentation Update PPI High Level Overview Details 2 3 1

Criteria and Weights 20 No Fire Alarm RFP Criteria Weights 1 Cost Interview Risk Assessment Plan Value Assessment Plan Past Performance Information – Firm and Key Account Manager 50 Total Points: 1,000 Points

Proposal Package (Attachments) Attachment A – Proposal Cover Sheet Attachment B – Proposal Form Attachment C – Project Plan Attachment D* – Risk Assessment Attachment E* – Value Assessment Attachment F – Survey Questionnaires Attachment G – Cost Proposal Form Attachment H – Copy of Valid ULC Certificate The * Item Refers to Attachments Being Anonymous. No Supplier Names. No Names of People 21

Critical Formatting Requirements The evaluated proposal documents MUST NOT contain any names that can be used to identify who the Proposer is. Including: company names, personnel names, project names, or product names. 22

Risk Assessment Plan Identify and prioritize all major risks (applicable to this project) Risk = –Not completing on time –Not finished within budget –Sources of dissatisfaction to the owner Controllable vs Non-Controllable –Controllable is covered in base proposal cost –Non-Controllable is outside of base cost

Risk Assessment Controllable Risk Supplier 1 RISK: Noise from our demolition may result in student/staff complaints (since we will be doing demo in an in-operational library during finals week). SOLUTION: Partnering is a key to success on any project. We will work with the user to develop the best strategies that can be implemented to minimize the impact of noise from demolition. Supplier 2 RISK: Noise from our demolition may result in student/staff complaints (since we will be doing demo in an in-operational library during finals week). SOLUTION: To minimize this risk, we have planned to demolition during off hours and weekends. We will also install rubber sheets on the floors and foam pads around the wall to diminish noise and vibration

Risk Assessment Non-Controllable Risk Supplier 1 –RISK: The local water company must have the water turned on by June in order for us to water the newly installed recreational fields (or the grass will die). –SOLUTION: We will coordinate and plan our schedule with the water company as soon as the award is made to make sure that we get water to the site to irrigate the fields. Supplier 2 –RISK: The local water company must have the water turned on by June in order for us to water the newly installed fields (or the grass will die). On past projects, the water company has failed to meet the schedule 90% of the time. –SOLUTION: To minimize this risk, we will coordinate our schedule with the water company as soon as we are awarded the project. If they fail to meet our schedule, we can connect temporary waterlines to the nearby fire hydrants, or we can also rent water trucks to irrigate the fields.

Value Assessment Opportunity to identify any value added options or ideas that may benefit the Owner and Agency. This may include ideas or suggestions on alternatives in implementation strategies, timelines, project scope, equipment, goals, financing, etc. All value added ideas must be logical and/or based on verifiable performance metrics. Value added ideas is a separated from the main cost proposal. Prior to award, the Owner will determine if the value added items will be accepted or rejected

Example Value Assessment Reroofing this building will not stop all water leaks. The majority of the leaks are caused by cracks in the walls, broken/missing glass, and poor caulking. We can repair/replace all of these issues to minimize all water leaks, for a minimal impact to time/funding.

Things To Avoid Saying General items: –Clear communication between all parties is essential –Project planning is vital to keeping the project on schedule and on budget. –It is important to have buy-in from key stake holders. –An experienced project team will increase the chances of success Marketing data: –Our company is known worldwide as a leader in… –We will use our long history to… –We will use state-of-the-art process to… Technical data: –The system we propose has 200% elongation and 600psi tensile strength. –The system can process up to 24GB per second Transferring risk back to client: –We will work with the owner to resolve issues… –We will work with the user to establish the proper tests… –We will have team meetings / partnering meetings with the o wner…

Critical Formatting Requirements Proposal is limited to –1 Page = Assessment of Controllable Risks –1 Page = Assessment of Uncontrollable Risks –1 Page = Assessment of Value Added Ideas

Past Performance Information PPI will be collected on the following Entities: –The Firm –Key Account Manager Procedures 1.Prepare a list of past clients/projects 2.Send out the Survey Questionnaires 3.Collect and receive completed surveys 4.Submit the best surveys with proposal

Cost Proposal Refer to Attachment G Cost for Phase 1 – Implementation Cost for Yearly Monitoring Projected Cost for 3 to 5 Years Supplementary Cost Information Value Added Costs Cost for Phase 2 Supplementary Cost could be used in Clarification Phase.

How The Submittal Process Works Submitt al Evaluation Members Proposal Form (1 page) Non-Evaluated Documents Non-Evaluated Documents Proposal Form (1 page) Evaluated Documents Evaluated Documents Average Score Contracting Officer Purchasing Officer

Evaluated and Non Evaluated Evaluated (Evaluation Committee)  Risk Assessments  Value Assessments Non Evaluated (UofM Purchasing Services)  Cost  Survey Responses

Evaluation Committee 3-5 individuals Will be used to evaluate specific portions of the Proposal Evaluators will not be provided with the names of any Proposers, product names, cost, or any additional information Evaluators will independently (not as a group or consensus) review and score the items comparatively to one another Objective of the scoring is to not make a decision (looking for “dominant” differential) Evaluations will be scored on a 1/5/10 scale –“10” = Dominantly higher value than the average (clearly shows differential) –“5” = About average (insufficient information to make a clear decision) –“1” = Dominantly below the average (clearly shows differential) 34

35 Key Personnel Interviews The Client may interview the following individuals: Key Account Manager (overall contact / involved on the project every day) All individuals must be available on the dates specified in the RFP. If a team member is not present for the interview, they will receive a 1 rating. No substitutes, proxies, phone, or electronic interviews will be allowed. Goals: Meet the critical personnel that are being assigned to the project Identify if personnel have experience and have thought about this project Identify if the personnel can think ahead and minimize potential risks

36 Interview Format This is not a “presentation”. No other individual from the Proposer’s organization may attend The individuals cannot bring any notes or handouts. Interview times will be approximately minutes per individual A standard set of questions will be asked to each individual. The client has the option to clarify any responses. Questions will be non-technical Evaluators will rate/score the interviews comparatively to one another on a scale

Looking For Dominant Differences in Risk Assessment, Value Adds, and Interviews with the Key Account Manager What Are We Looking For? 10 51

Final Prioritization NOCriteriaPointsFirm AFirm BFirm CBestFirm A PointsFirm B PointsFirm C Points 1Cost250$145,000$150,000$170,000$145, Interviews Risk Assessment Plant Value Assessment Plant PPI- Firm (1- 10) PPI- Firm Surveys PPI-Project Manager (1- 10) PPI Project Manger (Surveys) Total

Phase 2 - Clarification

What is the Clarification Period? (Proactive vs Reactive) Minimize All Surprises!!!

What is the Clarification Period? (Proactive vs Reactive) Minimize All Surprises!!!

What Could Cause a Surprise Delivering something that doesn’t work Delivering something that isn’t what the client is expecting Delivering something that isn’t what the client needed Requiring the client to do something (that they did not know they had to do) Requiring things from the client that they cannot provide Expecting that something will happen as planned Assuming that things are clear and understandable Assuming that things will be done/occur as planned Changes that impact cost Changes that impact time Poor satisfaction 42

How Can We Minimize Surprises A Final Clarification Document is Created. Subject Mater Experts Required Carefully preplan the project in detail –Coordinate the project/service with all critical parties –Prepare a detailed project plan (work plan, staffing, implementation, etc) –Revisit the sites to do any additional investigating –Prepare a detailed project schedule identifying critical milestones Cost Verification –Detailed cost breakdown –Identify why the cost proposal may be significantly different from competitors –Review big-ticket items –Value added options Identify all assumptions –Prepare a list of all proposal assumptions 43

Obtain Internal UofM Approvals Once Final Clarification Document is Completed and Recomened by Evaluation Committee, Internal UofM Approvals are Obtained. Make the Formal Award Execute Contract Documents –Independent Contract Agreement (ICA) 44

Project Is Complete

Spreadsheet that documents all risks on the service Risk = Anything that may impact cost or schedule. Risks can be caused by the Offeror or the Client Report must be submitted on Friday of every week (until service is complete) The WRRS does not substitute or eliminate weekly progress reports or any other traditional reporting systems or meetings (that the Offeror may perform or may be required to perform). Weekly Risk Reporting System 46

Weekly Risk Reporting System 47

Open, Fair and Transparent Better Environment (less adversarial) UofM Wants Suppliers to Send Their Best People On UofM Projects Suppliers are allowed to be accountable, efficient, and creative (drive performance and maximize profit) Reward performance (not ‘favorites’) UofM Wants To Be Client of Choice 48