Page 1 of 15 Robust High-Performance First Wall Design and Analysis X. R. Wang, S. Malang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion.

Slides:



Advertisements
Similar presentations
Studying Thermal Creep on a Sample using ANSYS Dara Navaei, Siegfried Malang, Xueren Wang ARIES Project Meeting Jan. 26 th,2011 UCSD.
Advertisements

Thermal Load Specifications from ITER C. Kessel ARIES Project Meeting, May 19, 2010 UCSD.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
CFD and Thermal Stress Analysis of Helium-Cooled Divertor Concepts Presented by: X.R. Wang Contributors: R. Raffray and S. Malang University of California,
High Performance Divertor Target Plate, a Combination of Plate and Finger Concepts S. Malang, X.R. Wang ARIES-Pathway Meeting Georgia Institute of Technology,
Page 1 of 15 Tungsten Structures for High Heat Flux Components: Opportunities & Challenges M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion.
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
U PDATES ON D ESIGN AND A NALYSES OF THE P LATE -T YPE D IVERTOR X.R. Wang 1, S. Malang 2, M. S. Tillack 1 1 University of California, San Diego, CA 2.
D ESIGN I MPROVEMENTS OF THE W-B ASED D IVERTOR C ONCEPTS X.R. Wang 1, S. Malang 2, M. S. Tillack 1, J. Burke 1 University of California, San Diego, CA.
Be/FS joining for ITER TBM Ryan Matthew Hunt FNST Meeting August 18, 2009 A collaboration between UCLA, SNL-Livermore, Brush-Wellman, Axsys Inc. and Bodycote.
What is Dual Coolant Blanket? Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University of California, Los.
Page 1 of 14 External Transition Joints for Tungsten Divertors D. Navaei, X. R. Wang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion Power.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
Impact of Liquid Wall on Fusion Systems Farrokh Najmabadi University of California, San Diego NRC Fusion Science Assessment Committee November 17, 1999.
May 28-29, 2008/ARR 1 Thermal Effect of Off-Normal Energy Deposition on Bare Ferritic Steel First Wall A. René Raffray University of California, San Diego.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
December 12-13, 2007/ARR 1 Power Core Engineering: Design Updates and Trade-Off Studies A. René Raffray University of California, San Diego ARIES Meeting.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
ILE, Osaka Concept and preliminary experiment on protection of final optics in wet-wall laser fusion reactor T. Norimatsu, K. Nagai, T. Yamanaka and Y.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft 02/24/2005 T. Ihli PL FUSION FZK - EURATOM ASSOCIATION 1 He-cooled Divertor Development in the.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
ISIS Second Target Station
Fracture and Creep in the All-Tungsten ARIES Divertor
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
How do we deal with the power/energy fluxes we have derived for ELMs, disruptions or others C. Kessel, PPPL ARIES Project Meeting, Jan 23-24, 2012, UCSD.
Assessment and comparison of pulsed and steady-state tokamak power plants Farrokh Najmabadi UC San Diego 21 st International Toki Conference, 28 Novemeber-1.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Tungsten Armored Ferritic Steel Glenn Romanoski & Lance Snead June 2004.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
Neutronics Analysis for K-DEMO Blanket Module with Helium coolant June 26, 2013 Presented by Kihak IM Prepared by Y.S. Lee Fusion Engineering Center DEMO.
MHD/Heat Transfer considerations for SiC FCI in DEMO and ITER Sergey Smolentsev DCLL Special Meeting at UCLA April 23-24, 2007.
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
E LASTO -P LASTIC -C REEP M ODELING FOR THE F IRST W ALL WITH W A RMOR X.R. Wang 1, S. Malang 2, M. S. Tillack 1 1 University of California, San Diego,
1 Parametric Thermal-Hydraulic Analysis of TBM Primary Helium Loop Greg Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI.
Page 1 of 12 A potpourri * of engineering topics M. S. Tillack, with help from many others ARIES Project Meeting July 2011 * A collection of various.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Heat Loading in ARIES Power Plants: Steady State, Transient and Off-Normal C. E. Kessel 1, M. A. Tillack 2, and J. P. Blanchard 3 1 Princeton Plasma Physics.
Forschungszentrum Karlsruhe FZK - EURATOM ASSOCIATION 05/14/2005 Thomas Ihli 1 Status of He-cooled Divertor Design Contributors: A.R. Raffray, and The.
UCLA - S.Sharafat: ITER TBM Dec. ’04 DCLL ITER-TBM: Design for Accident Relevant Loading Jaafar A. El-Awady, P. Rainsberry, S. Sharafat, and N. Ghoniem,
Helium-Cooled Divertor Options and Analysis
Update on ARIES ACT2 Power Core Design and Engineering X. R. Wang, M. S. Tillack, C. Koehly ARIES Project Meeting 18 September2013 ARIES UC San Diego UW.
Page 1 of 17 Evaluation of high heat flux components under normal and off-normal conditions M. S. Tillack with contributions from X. Wang, A. R. Raffray,
U PDATES ON H IGH P ERFORMANCE H E - COOLED W D IVERTOR C ONCEPTS X.R. Wang 1, S. Malang 2, M. S. Tillack 1, J. Burke 1 and D. Navaei 1, 1 University of.
Page 1 of 8 Concept development of pin-fin cooled divertors M. S. Tillack ARIES Project Meeting July 2010.
DESIGN AND ANALYSIS OF AN INNOVATIVE FIRST WALL CONCEPT X.R. Wang 1, S. Malang 2, and M. Tillack 1 1 University of California, San Diego, USA 2 Fusion.
Fracture and Creep in an All- Tungsten Divertor for ARIES Jake Blanchard University of Wisconsin – Madison August 2012.
Page 1 of 9 ELM loading conditions and component responses C. Kessel and M. S. Tillack ARIES Project Meeting 4-5 April 2011.
Page 1 of 19 Design Improvements and Analysis to Push the Heat Flux Limits of Divertors M. S. Tillack, X. R. Wang, J A. Burke and the ARIES Team Japan-US.
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
ARIES ACT1 Power Core Engineering M. S. Tillack, X. R. Wang, F. Najmabadi, S. Malang and the ARIES Team ANS 20 th Topical Meeting on the Technology of.
Engineering models in the ARIES system code, Part II M. S. Tillack, X. R. Wang, et al. ARIES Project Meeting January 2011.
ISIS TS1 Project: Target Design and Analysis
2K Cold Box Structural Analysis
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Improvements to power flow modeling in the ARIES system code
Integrated Design: APEX-Solid Wall FW-Blanket
C. E. Kessel1, M. S. Tillack2, and J. P. Blanchard3
He-cooled Divertor Design Approach
Modified Design of Aries T-Tube Divertor Concept
Manifolding and MHD issues
Near-term plan for the current ARIES project
Status of the ARIES Program
Update on Fracture Analyses
Presentation transcript:

page 1 of 15 Robust High-Performance First Wall Design and Analysis X. R. Wang, S. Malang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 2011

page 2 of 15 The EU “blanket box” first wall was adopted for the original DCLL blanket 1.Robust, thoroughly analyzed and well tested. 2.Adopted in ARIES (since ARIES-ST) as a good steel FW design. 3.Limited to roughly 0.8 MW/m 2 Single-sided roughening used to enhance heat transfer with only 25% penalty on pressure drop

page 3 of 15 A modified first wall concept using W pins was proposed to better resist transients Similar to micro brush concept developed for the ITER divertor W pins are brazed into ODS steel plates, which are brazed to RAFS cooling channels Pins help resist thermal transients and erosion Minor impact on neutronics (under investigation) Goal of 1 MW/m 2 normal, 2 MW/m 2 transient ITER outboard divertor target W bevel

page 4 of 15 Fabrication method for plasma-facing panels 1.The main cooling panel is formed by Hot Isostatic Pressing (HIP) of RAFS. 2.Holes are drilled in a simple flat “sieve plate” made from high-temperature ODS-steel. 3.Brazing foils, rings or pastes are placed on the top of the FW cooling panel and in the sieve plate holes. 4.The unconstrained assembly is placed in a furnace and slowly heated to the braze temperature (1000~1100 ºC). Residual stresses are relaxed. 5.The assembly is cooled to room temperature to seal the braze joints. Some local plastic deformation will occur during this step. 6.The assembly is tempered at 700~750 ºC for ~ 1 hour. Most of the residual stresses in the RAFS will be relaxed, but the temperature is too low for creep relaxation in the W or ODS steel. 7.The assembly is cooled to room temperature. Some plastic deformation may occur by exceeding the yield strength, especially in the RAFS cooling ducts.

page 5 of 15 Operating scenarios, “birth to death” Note: all of the ANSYS plastic material models are rate-independent except thermal creep. Therefore, changing slopes of the temperature and heat flux curves will not change the results. The thermal creep is not yet included. Loading profile for operation with warm shut-down and “over-power” transient Loading profile for fabrication steps including heat treatment 1 Operating Cycle Stress-free temperature (most conservative)

page 6 of 15 Our FW design criterion allows for plasticity where is the maximum value of the accumulated principal strains over the operating life, and is 1/2 of the uniform elongation (ue=the strain at necking). Temperature (C)Allowable strain (%) F82H302.4 F82H ODS Eurofer302.3 ODS Eurofer Pure W Pure W

page 7 of 15 Thickness of the RAFS front-plate was varied from 1 mm to 2 mm o 1 mm front plate may be unrealistic for fabrication o 2 mm front plate can reduce primary stress and plastic deformation, thus avoiding ratcheting during transient operations. Total FW depth kept constant (38 mm) Primary stress Temperature Thermal stresses “Front plate” thickened to reduce ratcheting

page 8 of 15 Analysis of fabrication steps The maximum plastic strains are reached at room temperature, and are far less than allowables for both designs. 2-mm RT strain (%) 1-mm RT strain (%) Allowable strain (%) F82H ODS W mm FS plate strain 1-mm FS plate

page 9 of 15 Thermal analysis during operation q’’=2 MW/m 2 2-mm plate T (2-mm) ˚C 1(2) MW/m 2 T (1-mm) ˚C 1,2 MW/m 2 T (nominal) ˚C 1,2 MW/m 2 Allowable ˚C 1,2 MW/m 2 F82H522 (607)480 (542)562 (642)550 ODS544 (648)500 (582)650 (826)700 W560 (680)515 (618)–1200 Temperature in F82H

page 10 of 15 Stress analysis of cycling with warm shutdown The maximum plastic strain at the interface ε pl = 0.92% (< ε allow =1.1%) occurs at 30˚C. There is no ratcheting observed after 100 load cycles. The plastic strain saturates during the first load cycle, with maximum ε pl = 0.79% First Load Cycle 100 Load Cycles 1: T=20 C 2: T=385 C 3: Power on 4,5:q=1 MW/m 2 6,7:q=2MW/m 2 8: q=1 MW/m 2 9: q=0 10: T=385 C Strains in F82H at the braze location (highest strain cases) 1-mm front plate channel center rib center

page 11 of 15 Partial FE model showing artificial node numbers 100 Load Cycles Stress analysis of cycling with cold shutdown The plastic strain reaches the limit (< ε allow =1.1%) after ~40 load cycles. The potential for ~40 cycles during the lifetime of the blanket down to RT(~20ºC) requiring draining of liquid metal from the blanket is probably sufficient.

page 12 of 15 Ratcheting was halted completely by increasing the F82H front plate thickness F82H ODS steel W  =1 mm F82H ODS steel W  =2 mm (In fact, both designs are probably acceptable)

page 13 of 15 Transient ELM heat loads to the FW o ΔW ELM x f ELM ~ constant = 0.2–0.4 x P div o f ELM (ITER, worst case) = 1-2 Hz & ΔW ELM (ITER, worst case) = 20 MJ o ΔW ELM to FW = 5% for small ELMs and ~ 20% for largest ELMs o τ ELM,rise ~ 2πR q95 /c s,ped ( c s =10 6 (  ZT e ) 1/2 cm/s ) o τ ELM,fall ~ 2-3 x τ ELM,rise o All of the energy lands outboard o Peaking of 2-4x associated with filaments expanding off the plasma. o Filaments do not land in the same place all of the time: random location. o For T ped =4000 eV, P max ~ 2 GW/m 2 over µs

page 14 of 15 Peak Temperatures from ELM’s Steel first wall, 2.5 GW/m 2 over 75 µs o ΔT = 1480 K o  = 43  m Tungsten-coated first wall, 2.5 GW/m 2 over 75 µs o ΔT = 1080 K o  = 100  m q” t

page 15 of 15 Summary and future directions The new first wall concept can withstand higher heat flux than the original design. Design limits on temperature and strain are met. Ratchetting is completely avoided if a cooling channel wall thickness of 2 mm is used. The new design is more tolerant toward ELM’s. We are now working to include thermal creep in our analysis.