RESOURCE REDEVELOPMENT: Second-Generation Transfer Stations Daniel Knapp, Ph.D. For the GRRN Zero Waste National Zero Waste Action Conference JULY 30,

Slides:



Advertisements
Similar presentations
Computer Recovery Project Developing a Network For Change Product Stewardship and Electronics Recycling.
Advertisements

Reducing construction waste through design Dave Marsh Construction Project Manager.
Mining the URBAN ORE A 30-year Saga Joe Werth Manager, Outside Trader Department Zero Waste International Alliance October 29, 2010.
NEW RULES FOR THE PROPER HANDLING OF COMMUNITY DISCARDS Making your Waste a Resource for the 21st Century: Resource Recovery Parks and Food Scrap Composting.
Victoria’s Towards Zero Waste Strategy and Waste Management Reform SA Local Government Waste Forum 10 February 2006 Jenny Pickles Manager Strategy & Regional.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
MUSKOKA Landfill & Transfer Station Operations Mark Pringle - Manager, Solid Waste MWA Fall Workshop October 29, 2014.
Demolition Materials Management Program. Program Goals Encourage reduction and recycling of demolition material Discourage using valuable RLF airspace.
ZERO WASTE The RENEW LA Goal To reduce, reuse, recycle, or convert the resources (municipal solid waste) now going to landfills so as to achieve an overall.
Wake County Experience with Alternative Landfill Land Use Presented by: John Roberson, P.E. Director of Solid Waste Management Division.
Food Waste to Energy Utilizing Anaerobic Digestion
Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
San Juan County Solid Waste: Funding. Solid Waste Funding Current Solid Waste Revenue Current Solid Waste Revenue Rate Structure used to collect revenue.
SOLID WASTE MANAGEMENT DIVISION WAKE COUNTY ELECTRONICS RECYCLING E-SUMMIT OCTOBER 22, 2001 Kelley Dennings.
Reuse as an ECONOMIC DRIVER In Hub and Spoke Recycling Daniel Knapp, Ph.D. President, General Manager June 22, 2010.
Case Study #3: The Park East Freeway Corridor Redevelopment Plan 64 acre site Planning began in middle 90s Demolition of elevated freeway began in late.
Albuquerque Recycling Now & In the Future Mayor Martin J. Chávez __ Ed Adams, P.E., Chief Administrative Officer Irene García, Chief Operations Officer.
Fighting for the Brand of Zero Waste GRRN National Zero Waste Action Conference July 30, 2011, San Diego, CA By Gary Liss & Associates
Getting to 50% and Beyond: Zero Waste in the RDN.
Green Building and Sustainable Architecture
Solid Waste Management in Hong Kong
PhD Candidate: Rıdvan AYDIN DEPARTMENT OF INDUSTRIAL AND SYSTEMS ENGINEERING An Integrated Marketing and Engineering Approach to Product Line Design with.
PaintCare Paint Stewardship Program Alison Keane, VP, Government Affairs, ACA General Counsel, PaintCare.
Barriers to C&D Reuse & Recycling Survey Results & Findings.
“Study on Other States’ Regulatory Oversight of Waste and Material Handling Activities Relative to Recycling Centers, Transfer Stations, and Green Material.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Environmental Science: Toward a Sustainable Future Richard T. Wright
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Building the Infrastructure Beyond Recycling GRRN National Zero Waste Action Conference Saturday, July 30, Ruth C. Abbe National Practice Leader.
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
NEW RULES NEEDED TO GET TO ZERO WASTE R.V. Anthony Richard Anthony Associates, San Diego, California GRRN Recycling and Zero Waste Conference Devens, Massachusetts.
Beyond 50% Recycling: Toward a Zero Waste Economy Institute for Local Self-Reliance
1 2 nd Informal Workshops on Draft Revisions to the Disposal Reporting System Regulations June 24, Diamond Bar June 26, Sacramento.
West of England Joint Waste Core Strategy September 2009.
Planet, People, Profit: Business As Usual Mary Lou Van Deventer Operations Manager GRRN Zero-Waste Conference, Devens, MA October 2009.
Going Green. Green Building and Sustainable Architecture What is Sustainability? Sustainable Design Sustainable Building Life Cycle Pre-Building Phase.
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Waste Management. Early Concepts of Waste Disposal Start of Industrial Revolution, the volume of waste produced in the US was relatively small. Factories.
WASTE MANAGEMENT AND RECYCLING 1. SOLID WASTE MANAGEMENT 2.
Sustainable Resource Management Report from the EPR-Zero Waste Retreat June 4-5, 2011, Springfield, Illinois These slides were approved by group consensus.
Local Jurisdiction Adoption of Construction & Demolition Ordinances Local Assistance & Market Development July 11,
3D Computer Study Model: Hillhurst/Sunnyside Richard M. Levy, Ph.D. MCIP.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
Resource Development Lands The Future of Zero Waste Mary Lou Van Deventer Operations Manager Bay Area Industrial Roundtable & ABAG May 8, 2008.
City and County of San Francisco Construction and Demolition Debris Recovery Ordinance No Effective July 1, 2006.
Increasing Diversion Without a Zero Waste Plan/Resolution Ana Carvalho Environmental Specialist 2011 GRRN National Zero Waste Action.
Introduction to URBAN ORE Daniel Knapp, Ph.D. President, General Manager June 23, 2010.
Public Workshop UCLA March 4, 2005 Draft Air Quality and Land Use Handbook: A Community and Health Perspective.
Designing Zero-Waste Resource Recovery Parks Daniel Knapp, Ph.D. GRRN Zero-Waste Conference, Ft. Devens, MA October 2009.
Smooth Sailing Ahead Partnering With Sustainability and Waste Compliance & Mitigation Fernando Berton, CIWMB.
GOING GREEN PLAN FOR Going Green Step 1: Reduce.
Green Materials for building construction  Materials or products that Minimize resource use  Materials or products with Low environmental impact  Materials.
Green Building and Sustainable Architecture
California Integrated Waste Management Board Consideration Of Allocation Proposals To Be Funded From The Integrated Waste Management Account And/Or To.
Metro Vancouver New Waste-to-Energy Capacity Project SIWMA Conference, Pemberton September 20, 2013 Sarah Wellman, Acting Project Manager.
Cabinet of the Mayor Brussels,
Technological Design Sustainable Construction
The New Construction and Demolition Debris Waste Ban Amendments
Zero Waste Program. Zero Waste Program …Zero What? Zero Waste aims to minimize the amount of materials sent to our landfills by capturing valuable.
The catalytic route to zero waste
Negotiating Franchise Agreements A Case Study December 7, 2017
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
העולם טובע בפסולת.
Solid Waste Division - Operations
Going Green Plan for 2011.
Septage Management Options
Going Green Plan for 2011.
Zero Waste Program. Zero Waste Program …Zero What? Zero Waste aims to minimize the amount of materials sent to our landfills by capturing valuable.
Zero Waste Program. Zero Waste Program …Zero What? Zero Waste aims to minimize the amount of materials sent to our landfills by capturing valuable.
Presentation transcript:

RESOURCE REDEVELOPMENT: Second-Generation Transfer Stations Daniel Knapp, Ph.D. For the GRRN Zero Waste National Zero Waste Action Conference JULY 30, 2011

The Problem Many current transfer stations were built when landfills were closing in the early 1980s. Now they’re outmoded and dilapidated. They need to be rebuilt.

What do the new transfer stations need? They need to be Zero Waste transfer stations.

Zero-Waste Transfer Stations Architecture and fee structures carry out policy priorities. Organize dropoff areas around load types and contents to promote highest and best recovery. Wasting costs the most. Except for some regulated materials. Commodity-specific fees are key.

Receiving Areas Reuse. Containers and fibers. Construction and demolition materials. Landscape materials. Regulated materials. Wasting.

They Require a New Set of Design Principles Urban Ore’s concepts and approach were developed with the late Mark Gorrell, Architect.

The First One From the May-June SIERRA magazine.

They Can Be New Purpose-Built Facilities Lowestoft, England - for Rick Anthony and Associates

They Can Rebuild Completely Berkeley, California, a design we volunteered and donated. It hasn’t been built – yet.

Berkeley from the top

Materials Flow

They Can Retrofit Old Facilities Burbank, California - in process, with Architect Greg VanMechelen (vanmechelenarchitects.com). Early design provides 3 options.

Option 1, No New Land Multiple design constraints include solid existing buildings to be partially repurposed; scales; narrow oddly shaped site; crowded traffic. Adaptations and compromises are required. Design in process.

Option 2, Some New Land Assumes adding some land from adjoining CalTrans site. Areas expand, entrances and exits change, and more. Design in process.

Use entire CalTrans site with building, change traffic. Doubles size. Better reuse and recycling before fee gate, more throughput. Option 3, Acquire All CalTrans Land under Freeway Design in process.

Go Forth and Design Go forth and design.

The End 900 Murray St. Berkeley, CA phone SAVE Daniel Knapp, Ph.D President Urbanore.com