GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
Quadrupole Magnetic Design for an Electron Ion Collider Paul Brindza May 19, 2008.
Block-coil NbTi dipoles for 6 Tesla Rapid-cycling SuperSPS
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Optimisation of Roebel cable for HTS accelerator magnets
HTS Coils for High Field Hybrid FCC Dipoles Ramesh Gupta March 23-27, Superconducting Magnet Division HTS Coils for High Field Hybrid FCC Dipoles.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Superconducting Large Bore Sextupole for ILC
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
EuCARD2 Magnet Status and action plan
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Some considerations and back-of-the-envelope computations on the multipole correctors Giovanni Volpini, CERN, 7 March 2013.
CERN Accelerator School, Erice 2013 Tiepida-2 case-study 3: High field – large aperture magnet for a cable facility TiEpIdA2 design team: I. Mondino: Project.
First approaches J. García, F. Toral, J. Munilla – CIEMAT.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
R. Bonomi R. Kleindienst J. Munilla Lopez M. Chaibi E. Rogez CERN Accelerator School, Erice 2013 CASE STUDY 1: Group 1C Nb 3 Sn Quadrupole Magnet.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
New options for the new D1 magnet Qingjin Xu
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
Update on Q4 DSM/IRFU/SACM The HiLumi LHC Design Study (a sub-system of HL-LHC) is partly funded by the European Commission within the Framework Programme.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
Correctors magnets V. Zubko, IHEP, Protvino SIS 300 Pre-consortium Meeting Thursday 19 March 2009, Protvino.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
Case study 1 : Quadrupole for Hi-Lumi LHC upgrade CAS Erice 2013 Group 1B A. Shornikov, T. Spina, Y. Arimoto, P. V. Gade, K. Brodzinski.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Preliminary analysis of a 16 T sc dipole with cos-theta lay-out INFN team October 2015.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
16 T dipole in common coil configuration: mechanical design
Massimo Sorbi on behalf of INFN team:
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
D2 Status The contract for the construction of the short model
16 T Cosq DIPOLE Mechanical Analysis
EuroCirCol: 16T dipole based on common coils
FCC-hh 16 T, 1.9 K INFN Team October 2015.
the MDP High Field Dipole Demonstrator
Yingshun Zhu Accelerator Center, Magnet Group
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
Large aperture Q4 M. Segreti, J.M. Rifflet
Vincent Roger, Siarhei Yurevich, Cecilia G. Maiano, Mario Sapinski
11T Dipole for the LHC Collimation upgrade
MQXF coil cross-section status
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Cross-section of the 150 mm aperture case
Presentation transcript:

GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE Dept.) Dr. Friedrich LACKNER (CERN TE Dept.) Mr. Shoubo HE (Inst. of Modern Physics - Chinese A. Of Sc.)

Case study no.4 New collimators to deal with increased beam intensity, energy and ion losses MB.B8R/L ∫BdL = 119.2 Tm @ Inom = 11.85 kA with 20 % margin MB.B11R/L 14.3 m Nb-Ti GOAL: Design a Nb3Sn superconducting dipole with an 60 mm aperture and a operational field (80% of Iss) at 1.9 K of 11 T. 5.5 m Nb3Sn 3 m Collim.

Cable dimensioning Bss=Bop / 0,8 = 13,75 T Aperture = 60mm  r = 30mm Cable geometry Strand diameter 0,75 mm Number of strands 40 Cu to SC ratio 1,5 Width 15mm Mid thickness 1.39 Insulation thickness 15% “Pitch” angle 15.39° Keystone angle 0.64 Filling factor 0.273 w t

Short sample solution Short sample solution jsc_ss 2560 A/mm2 jo_ss 650 A/mm2 Iss 13.5 kA Bpeak_ss 13.75 T

Operational condition & margins operational cond. (80% Iss ) jsc_op 2114 A/mm2 jo_op 530 A/mm2 Iop 10.8 kA Bpeak_op 11T Margins SC: jop/ jC 0.42 Bop/ BC 0.73 overall: jop/ jC 0.47 T 4.9 K

Comparison NbTi It’s not possible to obtain Bss > 13 T Bop > 10T (with a reasonable margin) using NbTi cables

Lay out Using one wedge, it’s possible to eliminate the B3, B5 and B7 unwanted multipole terms. A possible solution is 48° 60° 72° Using more wedges, we can eliminate more multipole terms and have a better field quality. This is the real case.

Forces and stresses We assume: Uniform j0=530 A/mm2 is ⊥ the cross-section plane Inner (outer) radius of the coils = a1 (a2) Angle = 60º No iron Fy Fx = 2424 kN/m Fy = - 2155 kN/m Fx Accumulate stress on the coil midplane σ = Fx/w = 80.8 MPa

Colliers and Iron yoke With 90% of Iss  B = 12.4T tiron = 186 mm For collars we can use as a reference other high field magnets. Thickness of collar = 30 mm We can assume the internal radius of the shrinking cylinder as the result of the sum of: D/2 + r + w + tcollar + tiron = 380 mm tshell = 12 mm D

Additional questions High temperature superconductor: YBCO vs. Bi2212 Compound Year Tc Bc2(0) ξ Bi2Sr2Ca1Cu2O8 1989 94 > 100a 1 - 2 YBa2Cu3O7 1988 92 > 100a 1 - 2 Bi-2212: Round wires. Future accelerators at >20T. Problem: mechanical stability. No solution yet for enhancing the mechanical reinforcement YBCO: Tapes. Cables, Current limiters, Wind generators. Main problems: costs, limited lengths: Commercially available: < 500 m SuperPower, USA < 500 m at Fujikura, Japan Superconducting coil design: block vs. cosΘ Block coil (HD2, HD3, Fresca2) Cable is not keystoned, perpendicular to the midplane Ends are wound in the easy side, but must be flared to make space for aperture (bend in the hard direction) Internal structure to support the coil neededRatio central field/current density is 12% less than a cosΘ with the same quantity of cable: less effective than cos theta Block design is interesting and has good properties but needs more experience Support structures: collar-based vs. shell-based All the collared magnets are characterized by significant coil pre-stress losses: the coil reaches the maximum compression (about 100 MPa) during the collaring operation, but after cool-down the residual prestress is of about 30-40 MPa.  BLADDERS and ALUMINIUM THICK SHELL: Initial pre-compression is provided by waterpressurized bladders and locked by keys. After cool-down the coil pre-stress increases due to the high thermal contraction of the aluminum shell. Assembly procedure: high pre-stress vs. low pre-stress The pre-stress avoids the appearance of tensile stresses and limits the movement of the conductors. LHC corrector sextupoles (MCS)  Learning curve was poor in free conditions and training was optimal with low pre-stress and around 30 MPa. Degradation was observed for high pre-stress (above 40 MPa)  Finally, nominal pre-stress for series production was 30 MPa.