Topics to be Covered 1. Capacity Planning
Advertisements

Aggregate / Production Planning
BUAD306 Aggregate Planning. Determines the resource capacity needed to meet demand over an intermediate time horizon Typically months in duration.
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management Dr. Ron Lembke
Operations Management
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Aggregate Planning Chapter 11 MIS 373: Basic Operations Management.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
Utdallas.edu/~metin 1 Aggregate Planning Chapter 12.
Aggregate Planning and Master Scheduling
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Ardavan Asef-Vaziri Systems and Operations Management
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Aggregate Planning Chapter 11.
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
IOA- C th July.
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Production and Operations Management
Presentation transcript:

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling

10-2 Learning Objectives  Explain what aggregate planning is and how it is useful.  Identify the variables decision makers have to work with in aggregate planning and some of the possible strategies they can use.  Describe some of the graphical and quantitative techniques planners use.  Prepare aggregate plans and compute their costs.  Describe the master scheduling process and explain its importance.

10-3 What is aggregate planning? Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Short range Intermediate range Long range Now2 months1 Year

10-4  Short-range plans (Detailed plans)  Machine loading  Job assignments  Intermediate plans (General levels)  Employment  Output  Long-range plans  Long term capacity  Location / layout Overview of Planning Levels

The concept of aggregation  Aggregate planning is essentially a “big- picture” approach to planning.  Planners usually try to avoid focusing on individual products or services. Instead, they focused on a group of similar products or services. 13-5

Why it is needed?  It takes time to implement plans.  It affect costs, equipment utilization, employment levels and customer satisfaction. 13-6

10-7 Planning Sequence Business Plan Establishes operations and capacity strategies Aggregate plan Establishes operations capacity Master schedule Establishes schedules for specific products Corporate strategies and policies Economic, competitive, and political conditions Aggregate demand forecasts Figure 10.1

10-8 Aggregate Planning  Begin with forecast of aggregate demand  Forecast intermediate range  General plan to meet demand by setting  Output levels  Employment  Finished goods inventory level  Production plan is the output of aggregate planning  Update plan periodically – rolling planning horizon always covers the next 12 – 18 months

10-9  Resources  Workforce  Facilities  Demand forecast  Policies  Subcontracting  Overtime  Inventory levels  Back orders  Costs  Inventory carrying  Back orders  Hiring/firing  Overtime  Inventory changes  Subcontracting Aggregate Planning Inputs

10-10  Total cost of a plan  Projected levels of inventory  Inventory  Output  Employment  Subcontracting  Backordering Aggregate Planning Outputs

10-11  Pricing  Promotion  Back orders  New demand Demand Options

10-12  Hire and layoff workers  Over/slack time  Part-time workers  Inventories  Subcontracting Capacity Options

10-13 Basic Strategies  Level capacity strategy:  Maintaining a steady rate of regular-time output while meeting variations in demand by a combination of options.  Chase demand strategy:  Matching capacity to demand; the planned output for a period is set at the expected demand for that period.

10-14 Level Approach  Advantages  Stable output rates and workforce  Disadvantages  Greater inventory costs  Increased overtime and idle time  Resource utilizations vary over time

10-15 Chase Approach  Advantages  Investment in inventory is low  Labor utilization is high  Disadvantages  The cost of adjusting output rates and/or workforce levels

Determine demand for each period 2.Determine capacities for each period 3.Identify policies that are pertinent 4.Determine units costs 5.Develop alternative plans and costs 6.Select the best plan that satisfies objectives. Otherwise return to step 5. Techniques for Aggregate Planning

10-17 Cumulative Graph Cumulative production Cumulative demand Cumulative output/demand Figure 10.3

10-18 Mathematical Techniques Linear programming: Methods for obtaining optimal solutions to problems involving allocation of scarce resources in terms of cost minimization. Simulation models: Computerized models that can be tested under different scenarios to problems.

Mathematical Techniques  Linear programming  E company produces four kinds of products (A, B, C, D), these products respectively with five workshop order processing, product B and D to use import metal plate, demand is 1 square meters and 0.6 square meters respectively. This metal plate annual supply is 1000 square meters

Mathematical Techniques  Table Dispatching Method:  Decision variables: the arrangement of output of regular 、 overtime and subcontract  Objective function: lowest cost  Constraints: Demand Capacity 13-20

Table Dispatching Method  Example 13-21

13-22 Period capacity Period Beginning inventory available All Regular Overtime Subcontract Regular Overtime Subcontract Regular Overtime Subcontract Overtime Regular PERIOdPERIOd Demand

13-23 Period capacity Period Beginning inventory available All Regular Overtime Subcontract Regular Overtime Subcontract Regular Overtime Subcontract Overtime Regular PERIOdPERIOd Demand

13-24 Regular Overtime Subcontract Regular Overtime Subcontract Regular Overtime Subcontract Overtime Regular PERIOdPERIOd Demand Period capacity Period Beginning inventory available All

Period1234 Regular Overtime Subcontract Ending inventory =(260)+( ) =(510)+( ) =(400)+( ) =(0)+( )-350  Aggregate plan

10-26 Aggregate Plan to Master Schedule Aggregate Planning Disaggregation Master Schedule Figure 10.4

10-27  Master schedule: The result of disaggregating an aggregate plan; shows quantity and timing of specific end items for a scheduled horizon. Disaggregating the Aggregate Plan

10-28 Master Scheduling Process Master Scheduling Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master production schedule Uncommitted inventory Figure 10.6

10-29 Projected On-hand Inventory Projected on-hand inventory Inventory from previous week Current week’s requirements - =

Beginning inventory: 45 JUNEJULY Forecast20 40 Customer order POH Master Schedule Lot-size production:

10-31 Time Fences Time Fences – points in time that separate phases of a master schedule planning horizon.

10-32 c Period “frozen” (firm or fixed) “slushy” somewhat firm “liquid” (open) Figure