Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.

Slides:



Advertisements
Similar presentations
1 October Test beam - THGEM group Alessandria-CERN-Freiburg-Liberec-Prague-Torino-Trieste Collaboration 4 th RD51 collaboration meeting Jarda.
Advertisements

Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Status of the ATLAS MM project
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
1 Fulvio TESSAROTTO RD51 meeting, Paris, 14/10/2008 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Situation with industry
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
1 NA58 RICH Test Beam T10 sept.2014 Fulvio Tessarotto – Stefano Levorato Partecipants: Alessandria, Aveiro, Budapest, Calcutta, Freiburg, Liberec, Prague,
Large area detectors Aida WP 9.2 RD51 WG6
DEVELOPMENT OF A THGEM-BASED PHOTON DETECTOR FOR CHERENKOV IMAGING APPLICATIONS Silvia Dalla Torre INFN - Trieste On behalf of an Alessandria-CERN-Freiburg-Liberec-Prague-Torino-TriesteCollaboration.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Lab tests of Thick GEMs (THGEM) Lab tests of Thick GEMs (THGEM) S. Dalla Torre, Elena Rocco, L. Ropelewski, F. Tessarotto May – August 2007.
1 IBF in aligned, misaligned and FLOWER THGEMs The IBF problem Standard THGEM configuration COBRA and extra electrode Misaligned holes FLOWER THGEM solution.
M. Bianco On behalf of the ATLAS Collaboration
ATLAS micromegas activities (MAMMA)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
Resistive protections Rui de Oliveira 09/12/15
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
Snowmass, August, 2005P. Colas - InGrid1 M. Chefdeville a, P. Colas b, Y. Giomataris b, H. van der Graaf a, E.H.M.Heijne c, S.van der Putten a, C. Salm.
Large THGEMs, uniformity and gain largely based on the paper for MPGD13 and some recently obtained results S. Levorato THGEM meeting CERN 13 Nov
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
R&D ON RESISTIVE TECHNOLOGY FOR MICROMEGAS BUKL STEPHAN AUNE 03/06/2015. S.Aune.
Recent progress in large THGEM production On behalf of Trieste group and Rui de Oliveira (CERN) S. Levorato RD51 mini week1.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
1 Fulvio TESSAROTTO GDD meeting, CERN, 01/10/2008 Trieste THGEM news New THGEM test in the COMPASS hall New THGEM test in the COMPASS hall Preparation.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Update on THGEM project for RICH application Elena Rocco University of Eastern Piedmont & INFN Torino On behalf of an Alessandria-CERN-Freiburg-Liberec-
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Thorsten Lux. Charged particles X-ray (UV) Photons Cathode Anode Amplification Provides: xy position Energy (z position) e- CsI coating 2 Gas (Mixture)
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
1 Fulvio TESSAROTTO CERN, 13/02/ GDD Meeting - Contribution from Trieste THGEM: TRIESTE LAB. EQUIPMENT AND CONTACTS WITH POSSIBLE PRODUCER Introduction.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
-Stephan AUNE- RD51 BARI. Saclay MPGD workshop R&D 09/10/20101 Saclay workshop R&D for new Bulk structure.
RD_FA : WP - 4 C. Chatterjee1, S. Dalla Torre, S. Dasgupta2, S. Levorato, F. Tessarotto, A. Valentini1 1 – new 2 – formally he cannot be list.
Upgrade activities at Clermont-Ferrand
Quality Control Chamber Production
Trieste proposal for the
Gaseous detectors Task Resistive anode Micromegas
Hybrid MPGD based photon detector, R&D update.
standard THGEM versus FLOWER
Large Area Endplate Prototype for the LC TPC
T1 Electronic status Conclusions Electronics Cards:
An improved design of R-MSGC
Trieste proposal for the
Presentation transcript:

Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato

RICH-1 at COMPASS experiment at CERN Upgrade starting fall 2015: Reminder radiator: C4F10 5 m 6 m 3 m UV mirror wall radiator gas: C4F10 Photon detectors system now: 12 MWPC + CsI 600 x 600 mm2 4 MAPMT 600 x 600 mm2 (2006) MWPC + CsI MAPMT … in 2016 To improve the detector performance in view of the COMPASS phase 2 Photon Detectors 4 New 600 x 600 mm2 MPGD based photon detector will be installed for a total sensitive surface of ̴ 1.1 m2 Remark  mechanical constrains to guarantee compatibility with the present structure RD51 Mini week 8-12 June S. Levorato

Detector concept: architecture chosen a reminder Hybrid Detector (2 x THGEM + B-Micromegas) Simple; robust; cheap; High photoelectron extraction efficiency in CH4 rich mixtures; Fast signals time resolution 𝜎≈10 𝑛𝑠; Closed Geometry; Cascade  G≈ 10 5  single photon detection; IBF <5%; Stability: time & high rates Staggered THGEMs Multi-Pad Anode (8mm pitch 500 mm interpad ) Each 600mmx600mm detector is made of 2 modules Each of them consisting of: 2 300mmx600mm THGEMs 1 300mmx600mm Bulk Micromegas Double THGEM: t = 0.4 mm; p = 0.8 mm; h = 0.4 mm RD51 Mini week 8-12 June S. Levorato

Detector: integration of the new architecture RD51 Mini week 8-12 June S. Levorato

Detector: THGEM production material Thickness PCB variance as big as 15% for non selected PCB Need of material preselection 50 foils of raw PCB material bought Gain Variance > 40%* example THGEM: t = 0.8 mm; p = 0.8 mm; h = 0.4 mm *Standard daq chain Cremat+Ortec+MCA, Ar/CO2 70/30 atmosphere RD51 Mini week 8-12 June S. Levorato

THGEM production: thickness measurement Top View Thermalized room with Mitutoyo EURO CA776 Y X 800 mm 36 x 36 points in square pattern from (0,0) to (700,700) (0,0) #No. From 1245 mm x 1092 mm Raw PCB foil XY reduction Expected more uniform in thickness ( production procedure) On average 3 measured pcs/day Each foil has its unique n identifier RD51 Mini week 8-12 June S. Levorato

THGEM production, material seection 𝜹 𝒕𝒉𝒊𝒄𝒌𝒏𝒆𝒔𝒔 ~𝟐.𝟔% 50 PCBs 700 x 700 mm2 𝛿 𝑡ℎ𝑖𝑐𝑘𝑛𝑒𝑠𝑠 43 𝑡ℎ𝑔𝑒𝑚𝑠 ≤4% N pieces needed (300mm x 600 mm): 16, we can easily select 8 foils with 𝜹 𝒕𝒉𝒊𝒄𝒌𝒏𝒆𝒔𝒔 <3% ( reminder 5% in thickness  15% in gain ) RD51 Mini week 8-12 June S. Levorato

THGEM production, material selection RD51 Mini week 8-12 June S. Levorato

THGEM production 24 fixation points to guarantee THGEMs flatness and positioning Pillars in PEEK t = 0.4 mm; p = 0.8 mm; h = 0.4 mm Segmentation in 12 sectors 0.7 mm sector separation 2 reference holes to guarantee the THGEMs staggering PCB for alignment and spacing RD51 Mini week 8-12 June S. Levorato

THGEM production 24 fixation points to guarantee THGEMs flatness and positioning Pillars in PEEK Segmentation in 12 sectors 0.7 mm sector separation 2 reference holes to guarantee the THGEMs staggering PCB for alignment and spacing RD51 Mini week 8-12 June S. Levorato

THGEM production PCB material Sent to ELTOS for production, Agreed on procedure with ELTOS first batch delivery 08/06/2015: RD51 Mini week 8-12 June S. Levorato

THGEM characterization In Trieste Cleaning procedure will be applied : polish, high pressure water cleaning, ultrasonic Bath + microetching, distilled water rinsing and oven @ 160 ºC, final step Gain Characterization THGEMs stored for transport in dedicated boxes for gold coating to CERN. RD51 Mini week 8-12 June S. Levorato

THGEM characterization: proof of the principle Ar/CO2 (70:30); Pre-amplifier + Amplifier + MCA; 55Fe 55Fe main peak Escape Peak Uniformity gain, E res. spectra Corresponding connector selection Spectra collection 55Fe positioning Operation is time consuming, and affected by gain variation due to the P,T gas/environmental changes RD51 Mini week 8-12 June S. Levorato

THGEM characterization Gain Uniformity will be measured with X-Ray source (up to now 55Fe), Data collected with SRS system. Each THGEM will be fully characterized. Amore software adapted, Different Mapping Option added to have Pads: Thanks to Eraldo for borrowing us the FEC! Next weeks 55Fe X-rays gun RD51 Mini week 8-12 June S. Levorato

Detector Micromegas production Final anode design to be completed in the next weeks for production at TVR company, first delivery foreseen for half of July, they will be delivered to CERN for BULK Micromegas production (Agreed with RUI) Prototypes have already been produced @ CERN with good results in terms of gain uniformity and detector stability Start of production of BULK MM (final pieces) at the end of July Then 2 pieces for month RD51 Mini week 8-12 June S. Levorato

Detector Micromegas production 55Fe source Ar/CO2 Cremat+Ortec+Amptek Final anode design to be completed in the next weeks for production at TVR company, first delivery foreseen for half of July, they will be delivered to CERN for BULK Micromegas production (Agreed with RUI) Prototypes have already been produced @ CERN with good results in terms of gain uniformity and detector stability Start of production of BULK MM (final pieces) at the end of July Then 2 pieces for month OK RD51 Mini week 8-12 June S. Levorato

Full detector characterization: Gain Uniformity, HV monitoring, PT variation Caen HV 1471 A Correction of Voltage 𝑓 𝑃,𝑇 according to linearized exponential law System fully automated + logging LabVIEW based Thanks to P. Ciliberti wireless PicoAmmeter + automated logging Linux SW QT-based The correction under study but encouraging results! Hybrid prototype 2 THGEMs + Micromegas w/o PT correction ± 20% gain variation during the day with PT correction ± 5%. RD51 Mini week 8-12 June S. Levorato

Thanks for your attention! Full detector characterization: Gain Uniformity, HV monitoring, PT variation Thanks for your attention! Thanks to B.G. RD51 Mini week 8-12 June S. Levorato