CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.

Slides:



Advertisements
Similar presentations
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Advertisements

Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
EE 369 POWER SYSTEM ANALYSIS
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Bill Hellinghausen EDF Trading North America
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Congestion Management Working Group WMS update 11/7/2012.
CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
CMWG Update to WMS Report of CMWG Meetings of &
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Operating Reserves and Extended Locational Marginal Pricing 1.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
1 WMS Report TO TAC April 2007 (which is in March)
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
IMM Report on MISO South Integration Presented by: David B. Patton, Ph.D. Independent Market Monitor Presented to: Entergy Regional State Committee April.
Market Trials Update NATF March 2,
Hourly Offers Schedule Update Examples
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Presentation transcript:

CMWG Update WMS September 2015 Meeting

CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap of $10M was reached in July and money was allocated to Load At this time, do not expect the fund to be needed for August CRR payments Money would again be allocated to Load

Transaction Limit Utilization Discussion Since raising the transaction limits: The number of transactions being submitted and the number of binding constraints have increased The percent of transactions being awarded has remained relatively steady at ~12% Net auction revenue has been lower than in previous years This trend is likely being driven by factors other than transaction limit changes

FIS reports & market information asymmetry CMWG has proposed a solution to address the market data inequity issue. CMWG would like input from the TSPs/ERCOT on any issues that could arise by enacting this solution. Proposal: If an FIS Stability Report were to be released to an IE that would notify the IE of any of the following, this information must be released to the market as a whole simultaneously with the notification to the IE. potential system stability constraint(s) potential imposed interface(s) potential proposed stability MW limit value(s) The entire FIS Stability Report does not need to be released. A short market notice including only the information listed above would suffice

Pricing and Stability Limits Stability Limits are not efficiently managed by GTLs because LMPs don’t accurately reflect the impact of generation on the post-contingency overload. Stability constrained areas that would benefit from synchronous generators lack the proper price signals to encourage traditional resources to site in that region. When stability constraints bind, the constrained region may see an LMP set by a low marginal cost producer (e.g. wind or solar.) If a thermal resource online at LSL would increase that stability limit, the societal benefit would not be shared appropriately with the producer alleviating the stability constraint. Similarly, wind units closest to the constraint have the least negative effect on the constraint, but see the lowest prices. CMWG is reviewing alternative mechanisms that would preserve appropriate LMPs but compensate the resource for the incremental transfer capability created by committing a thermal resource in a stability constrained area.

Interface limit without traditional resource: 2200MW Interface limit with traditional resource online and committed: 3000MW Wind available for export: 3200MW λ=$50 Constrained area LMP = $0 Incremental System Benefit * : (700*$50) – (700*$0) = $35,000 savings Less (0-LSL) =$25,000 Net Societal Benefit * Assume there are 801MW of $50 offers on the margin that can be replaced by 700MW of $0 for the calculation of incremental system benefit.

Interface limit without traditional resource: 2200MW Interface limit with traditional resource online and committed: 3000MW LSL of Thermal Resource: 100MW Wind available for export: 3200MW λ=$50 Constrained area LMP = $0 Incremental System Benefit * : (700*$50) – (800*$0) = $35,000 savings Reduced by $100 (0-LSL) nets $25,000 LMP at the Thermal Resource Bus: $0 None of the societal gain created by the producer is transferred to the producer * Assume there are 801MW of $50 offers on the margin that can be replaced by 700MW of $0 for the calculation of incremental system benefit.

CMWG Meeting scheduling Per the TAC/ TAC Subcommittee Structural and Procedural Review should CMWG and QMWG coordinate meeting times? Back-to-back or Morning/Afternoon? Does this affect participation or travel schedules?