Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
LBOC31-May-2011 CERNMassimiliano Ferro-Luzzi 1 The usual "wishes from the experiments"  Going to stable beams / optimizing / leveling  Filling the LHC...
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Criteria for dynamic aperture limits and impact of the multipolar errors: summary of the simulations with beam-beam for levelling scenarios at 5 and 7.5x10.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Request and expectations from the experiments J. Boyd, C. Schwick (LPC) Chamonix LHC workshop 27/1/2016 1Experiment requests - Chamonix 2016 Many thanks.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday :12 Stable beams fill 3351 Initial luminosity
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Spectrometer Operation in IP2 & 8
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Summary of Week 16 G. Arduini, J. Wenninger
Mike Lamont, Jorg Wenninger
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Programme for VDM measurements Friday Oct 15
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
90m "proper" VdM scans in the 90m/10m optics
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 1 LHC Physics Programme  what's left ?

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 2Overview  Until date Wed 19 Oct, FOCUS SHOULD BE HIGH LUMINOSITY PRODUCTION. –Only those requests that can be accommodated without (or with negligible) physics beam time cost will be attempted.  From Wed 19 Oct, priority shifted to the minimal program of the 90m optics –the mode of operation will change: we will take the time that is needed to achieve this goal. –depending on the progress and availability of experts, the 90m special runs will be alternated with high luminosity production and other special physics requests (e.g. VdM scans in IP2, IP8).

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 3 Requests that require no (negligible) dedicated beam time  LHCb polarity reversal (1 or 2 more times ?) –Beam time cost: ~0.8h per reversal (at injection)  ALICE solenoid at 40% (parasitic during high lumi physics) –Beam time cost: test ~0.5h at an "end of fill" (parasitic) use ~10h during a physics fill (parasitic)  Operate 1380b with satellite-main collisions in ALICE –(using the "natural" satellites at 25ns, i.e. with ~0.1% intensity of the main bunches) –Beam time cost: <0.5h

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 4 First priority (must achieve at all cost this year!)  90m, align all 220m TOTEM pots followed by data-taking –at least ~4h data-taking –Beam time cost: ~12h  90m, align ATLAS pots followed by data-taking –~2h ALFA standalone data-taking and at least ~2h with ATLAS DAQ –Beam time cost: ~12h (can of course be merged with previous) (Use these opportunities to make loss maps for 10m TCTs)

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 5 Second priority (we want to do it, but can accept failure)  VdM scans in IP2 and IP8 at 10m, ALICE+LHCb –Beam time cost: ~8h –(+4h if dedicated fill for IP8 TCT loss maps)  90m, repeat ~4h data-taking TOTEM+ATLAS as of previous slide –Beam time cost: ~8h  90m, repeat ~2h with ATLAS DAQ + ~2h ALFA OD calib runs –Beam time cost: ~4h if after other 90m fills (see above) ~8h if dedicated fill  90m optics measurements (AC dipole, local bumps) TOTEM+ATLAS –Beam time cost: ~6-8h (?)  25ns 3h stable beams, ALICE, ATLAS, CMS, LHCb –Beam time cost: ~6h  High pile-up => MD ATLAS, CMS –Beam time cost: ~9h TODAY ? done

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 6 Nice if could do a well  Test in LHC the PS-enhanced 25ns satellites (ALICE sat-main) –Beam time cost: ~1-2h (?) at injection  Put ALICE solenoid+dipole at zero in 50ns high lumi fill –risk due to long-range encounters ? –Beam time cost: ~8h (?)

LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 7 Schedule (rough, to be discussed)  Called Wendy Korda (DG's VIP service): "no head of state visit in October"  Dates are tentative/approximative, to be confirmed 25 ns 90 m Pileup 90m VdM ? 90m VdM 3h stable beams pp IR2 aperture,  * = 1.5m, 1m moved to week 43. Sun 30 oct = physics day, MD=31Oct-4 Nov pp IR2 aperture,  * = 1.5m, 1m moved to week 43. Sun 30 oct = physics day, MD=31Oct-4 Nov VdM: only one block. if loss maps done then Thu 20 oct, else 25 oct VdM: only one block. if loss maps done then Thu 20 oct, else 25 oct 25 ns 3h stable beams 90m finish align data in ADJUST loss maps +optics 90m finish align data in ADJUST loss maps +optics