BPMs period 13-14. General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.

Slides:



Advertisements
Similar presentations
#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
AR1 BPM Calibration (for new electronics) Before any TOA measurements we attempted to look at the BPM calibration (AR2-BPM-03) Turn off quads (Q1,Q2) and.
MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
IK/JJ May 6 th 2012 Slide 0 Results from EMMA Injection Line BPM-02 measurements on May 6 th 2012 Ian Kirkman, James Jones.
Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
#3271 Sat 08-Dec-12. R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert.
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
PI laser jitter measurements Data taken on 11 th April 2013.
UNRELIABLE DATA, SEE FIRST SLIDE WARNING!!! Data taken on these shifts had attenuation factors set incorrectly and problems with faraday cup bunch charge.
Alignment and Beam Stability
Time Of Arrival/R56 measurements Period 13. Background Dave Newton’s Parameter scans \\Dlfiles03\alice\Simulations\R56 AR1 (parameter scan).pdf Deepa’s.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
ENS 203- Amplitude Modulation and Demodulation Lab 6 Radio Experiment Meric Ozcan After you configure the radio as specified in your lab sheet, you will.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Spatial Effects of Multiple Scattering of HF Signals in the Ionosphere: Theory and Experiment N. Zabotin 1,2, J.W. Wright 2, A. Gasiewski 1, G. Zhbankov.
3281, 13 th December 2012 Combined fast-MCT, AR2-BPM-01, and TOA measurements. All data at \\srofs1\PSD\Alice\Work Temp\2012\12\13\Shift 3 Different parameter.
3243 Fri 23 Nov Summary INJ-BPM-01: took 1 shot of data, just a reference to compare with previous recent shifts – Did not see a strong dominant 100 kHz.
Electron energy stability: analysis from snapshot data and temperature stabilization Recycler Departmental Meeting May 21, 2008 A. Shemyakin 1.Analysis.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak.
March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA.
#3205 Summary 6 th Nov 2012 Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse.
MKI failure event 17-April-11 Recall from logbook: MKI D (1st one seen by the beam) had a real flashover between the two sets of 36b during the 3rd 72b.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
#3205 Summary Studying beam instabilities along bunch train 3 observables – INJ-BPM-01 fast bunch electronics – INJ FCUP-01 – Laser pulse power. Laser.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Vacuum specifications in Linacs J-B. Jeanneret, G. Rumolo, D. Schulte in CLIC Workshop 09, 15 October 2009 Fast Ion Instability in Linacs and the simulation.
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
Beam-Based Calibration Screen calibration. Two screens with BPM in between. Scan beam position with upstream dipole/corrector. Absolute calibration. One.
BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Fast Electron Beam and FEL Diagnostics at the ALICE IR- FEL at Daresbury Laboratory Frank Jackson, Accelerator Science and Technology Centre (ASTeC), Daresbury.
SPM Users Basic Training August 2010 Lecture VIII – AC Imaging Modes: ACAFM and MAC Imaging methods using oscillating cantilevers.
Profiles of density fluctuations in frequency range of (20-110)kHz Core density fluctuations Parallel flow measured by CHERS Core Density Fluctuations.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Further Tracking Studies and March Trip Plan
Feng Zhou LCLS-II AP meeting 02/23/2017
Tolerances & Tuning of the ATF2 Final Focus Line
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Status of Phase Feedforward Tests
OCELOT orbit correction and optimizer
T2K Run8 MUMON Summary.
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

BPMs period 13-14

General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian Beam based calibration of AR1-BPM-03, see \\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\BPM\AR1BPM1Calibration Analysis of AR1-SEXT-01 and QUAD-01,02 misalignment Beam position, interbunch, intertrain, transients, ripples etc – Variation of bunch position over train on several shifts Dispersion (1 st and 2 nd order) measurement throughout ARC-1

Summary of 2011 Tests See \\dlfiles03\apsv4\Astec\Projects\ALICE\ALICE_Physics_Meeting\2011_09_20 Some Key Points – Basic BPM resolution/noise is um. – Initial train transient seen over 50 bunchers (~5 us) – Ripples seen at different frequencies. – horizontal: – period of (150 to 200) bunches, (80 to 110)kHz, two kinds: a single triangle wave for bunches 100 to 600 and a regular sine-like oscillation for bunches 600 to 1600, where the amplitude is (40 to 60)um; – period about 230kHz, for bunches 100 to 600, amplitude (20 to 30)um; – vertical: – oscillations for 100 to 600 bunches are similar to that in the horizontal plane; – practically no oscillation of the second kind.

First Shifts #3091-#3123 Initial shifts #3091, # were used for looking at transients, droop, and ripple. But the shifts above were problematic for several reasons – Attenuation on buttons set differently to each other – Problems with bunch charge (scope set-up problems) However, despite problems ripples and transient evident, as in Much of the data on these shifts is doubtful because of the problems. A separate ppt for these files … – \\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\BPM\bpms pptx … However, some of this data was valid (attenuation set correctly) and was used for input to IBIC 2012 paper.

#3121 Observations 16 MHz, 100 us (1600 bunch) trains, 30 pC Lattice from a THz-like set-up AR1 probably not closed … (strong-ish AR1Q1/4=2.22 A) Knowledge of beta functions poor/non-existent. mean values subtracted

#3121 Observations General observations, from a single shot: – bunch to bunch position variation; larger in x than y – various ripples seen on x, y, sum_V – initial “transient”, always on sum_V, sometimes on x, y. The first observation might be naively expected, since any bunch energy variation would show in x but not y But since beta functions so poorly understood, not possible to confirm this.

#3121 Analysis. A very rich pictures of ripples, for IBIC 2012! This data was the basic for the IBIC paper Fourier-analysed the various frequency components In x and y – Biggest feature is a ~ 100 kHz oscillation (170 bunches, 10 us) oscillation. Magnet ripple? – Other peaks in the kHz range not exactly the same in x and y – Smaller ~300 kHz and 6 MHz signal on both and x and y. Hard to see the 300 kHz on the x,y plots. In sum_voltage signal – kHz signal. Laser pulse power variation? – 300 kHz quite visible on the sum_V. DC-DC converter? – 6 MHz as in x,y So the biggest effects are the ~100 kHz ripple seen on x,y, and the ~ 60 KHz ripple on charge. I would suggest these are the highest priority to investigate.

AP ‘block’ #3133, 3136, 3141, Week 17 th 23 rd September Attenuation set correctly, charge pC, 16 MHz AR1-BPM-01, 03, 04, 05 Check the x,y sign convention Varying AR1-Q1-4 to try and generate high dispersion on 1 or more bpms to look for energy transients on trains , 100 kHz bunch oscillation seen very obviously in both x and y, on all BPMs And similar amplitude in x on BPM-01 as BPM-05, suggesting this is not an energy oscillation Identical oscillation on x and y on BPM-03. Able to manipulate amplitude of y amplitude on BPM-05 by ST1-Q2

#3133 See \\Dlfiles03\alice\Analysis\Period 14 data\AP_period13and14\BPM\3133\3133.ppt Struck by how regular the oscillation was compared to earlier shifts

#3136 ~1/2 a shift after FELIS/SNOM problems Not much intra-train studies on this shift Trying to measure dispersion, crudely, on AR1- BPM-05 by varying beam energy, and study how AR1-SEXT-01 affects the dispersion here (ideally, it shouldn’t affect dispersion). Get some decent agreement between theory and measurement Also can see the T166 component quite easily

#3141 Some software tweaks for automatic dispersion measurements Changed beam energy to observe effect on ripple. 100 kHz (and lower freq) enhanced significantly by reducing the energy. Higher order dispersion T166 observations – Measuring dispersion with single bunch vs whole_train_mean doesn’t make much difference More detailed effect of sextupole vs. bpm-05 dispersion. AR1-quad alignment data. Recording many (1000) trains for train-to-train jitter measurements.

#3168 # th October Strange instability seen on ST2-BPM-03, 1 every 30 refreshes Alignment data again.