Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.

Slides:



Advertisements
Similar presentations
Nick Walker KEK-DESY meeting 7 th March 2005.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
International Linear Colllider Global Design Effort Barry Barish SLAC ILC Group 5-May-05.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
News from the ILC Barry Barish Users’ Meeting Fermilab 9-June-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Personal Perspectives on the ITRP Recommendation and on the Next Steps Toward the International Linear Collider Barry Barish PAC Annual Meeting Knoxville,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
Report from the GDE Barry Barish ACFA Workshop EXCO, Daegu, Korea 11-July-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Report from ILCSC Shin-ichi Kurokawa KEK ICFA Seminar Daegu, Korea September 29, 2005.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
US ILC Review by DOE/NSF Apr. 4-6 at Fermilab Consultant reviewers: Ilan Ben-Zvi (BNL/ATF &RHIC) Dixon Bogert (FNAL/NUMI) Isidoro Campisi (ORNL/SNS) Tom.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Report from the GDE Barry Barish ACFA Workshop EXCO, Daegu, Korea 11-July-05.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
The International Linear Collider Barry Barish ANL Colloquium 3-Jan-06.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
ILC Global Design Effort Barry Barish GDE 9-March-06.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Syratchev(CERN) on behalf of
ILC Global Design Effort
Barry Barish GDE Caltech
The International Linear Collider
CEPC RF Power Sources System
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05

Fermilab ILC Industry Meeting2 An International Initiative R&D toward an ILC was carried out over the last decade in three regions of the world and primarily at SLAC in the U.S., KEK in Japan and DESY in Germany The crucial technology decision was successfully made by an international panel having 4 members from each region We are now entering the design phase, which will be carried out under the guidance of the GDE, which again has comparable membership from all three regions We fully expect the final project to be international

21-Sept-05Fermilab ILC Industry Meeting3 The Technology Recommendation The recommendation was presented to ILCSC & ICFA on August 19 in a joint meeting in Beijing. ICFA unanimously endorsed the ITRP’s recommendation on August 20

21-Sept-05Fermilab ILC Industry Meeting4 The Community then Self-Organized Nov 13-15, 2004

21-Sept-05Fermilab ILC Industry Meeting5 2 nd ILC Accelerator Workshop

21-Sept-05Fermilab ILC Industry Meeting6 The Global Design Effort –The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt

21-Sept-05Fermilab ILC Industry Meeting8 Starting Point for the GDE Superconducting RF Main Linac

21-Sept-05Fermilab ILC Industry Meeting9 Cost Breakdown by Subsystem Civil SCRF Linac

21-Sept-05Fermilab ILC Industry Meeting10 TESLA Cavity 9-cell 1.3GHz Niobium Cavity Reference design: has not been modified in 10 years ~1m

21-Sept-05Fermilab ILC Industry Meeting11 Cavity Fabrication

21-Sept-05Fermilab ILC Industry Meeting12 Gradient Results from KEK-DESY collaboration must reduce spread (need more statistics) single-cell measurements (in nine-cell cavities)

21-Sept-05Fermilab ILC Industry Meeting13 Improved Fabrication

21-Sept-05Fermilab ILC Industry Meeting14 Improved Processing Electropolishing

21-Sept-05Fermilab ILC Industry Meeting15 Improved Cavity Shapes

21-Sept-05Fermilab ILC Industry Meeting16 ILC Siting and Conventional Facilities The design is intimately tied to the features of the site –1 tunnels or 2 tunnels? –Deep or shallow? –Laser straight linac or follow earth’s curvature in segments? GDE ILC Design will be done to samples sites in the three regions –North American sample site will be near Fermilab –Japan and Europe are to determine sample sites by the end of 2005

21-Sept-05Fermilab ILC Industry Meeting17 1 vs 2 Tunnels Tunnel must contain –Linac Cryomodule –RF system –Damping Ring Lines Save maybe $0.5B Issues –Maintenance –Safety –Duty Cycle

21-Sept-05Fermilab ILC Industry Meeting18 Possible Tunnel Configurations One tunnel of two, with variants ??

21-Sept-05Fermilab ILC Industry Meeting19 ILC Civil Program Civil engineers from all three regions working to develop methods of analyzing the siting issues and comparing sites. The current effort is not intended to select a potential site, but rather to understand from the beginning how the features of sites will effect the design, performance and cost

21-Sept-05Fermilab ILC Industry Meeting20 Baseline Klystrons Thales CPI Toshiba Available today: 10 MW Multi-Beam Klystrons (MBKs) that operate at up to 10 Hz

21-Sept-05Fermilab ILC Industry Meeting21 Improved Klystron ? 10 MW Sheet Beam Klystron (SBK) Parameters similar to 10 MW MBK Low Voltage 10 MW MBK Voltage e.g. 65 kV Current 238A More beams Perhaps use a Direct Switch Modulator 5 MW Inductive Output Tube (IOT) Drive Output IOT Klystron SLAC CPI KEK

21-Sept-05Fermilab ILC Industry Meeting22 How and when to involve industry? Large Scale Project Characterization –Large Project Management –Precision Engineering –International Coordination –Costing Industrialization –Civil Construction & Infrastructure –Cryogenics –Superconducting RF structures, couplers, etc –Electronics and Control Systems –Large Scale Computing