TE-MPE-CP, RD, 09-June-2011 1 Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
TE-MPE-EP, RD, 26-Jul Quench Heater Supervision for MB Status of System Integration R. Denz TE-MPE Technical Meeting July 26 th Acknowledgements:
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Changes in QPS R. Denz, TE-MPE-EP MPP workshop Acknowledgements: K. Dahlerup-Petersen, V. Froidbise, S. Georgakakis, B. Magnin, C. Martin, J.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
DQHDS Upgrade: Status of Hardware Design. Approach to implementation of the new heater measurement system. 08/06/2011V. Froidbise.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
TE-MPE-EP, RD, 26-Aug Workshop on QPS Software Layer Hardware / Agents R. Denz, TE-MPE-EP.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
TE-MPE-CP, RD, 06-Oct Radiation Induced Faults in QPS Systems during LHC run 2011 R. Denz TE-MPE Technical Meeting October 6 th.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
QPS high level controls LabView tools, an overview.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE-MPE-CP, RD, 12-Dec QPS - analysis of main problems, areas to target, possible improvements R. Denz, TE-MPE-CP Evian 2011.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
TE/MPE/EE - LHC Knud 8/3/2012 Project for Upgrade of the Electrical Circuits, the Powering Scheme and the Quench Heater Supervision for Enhanced Monitoring.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
R. Denz, A. Gomez Alonso, AT-MEL-PM
Injectors BLM system: PS Ring installation at EYETS
Ideas and design concepts, and challenges
LV Safe Powering from UPS to Clients
Powering the LHC Magnets
MPE main activities planned for LS2
the CERN Electrical network protection system
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Collimator Control (SEUs & R2E Outlook)
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP

TE-MPE-CP, RD, 09-June Outline  Introduction  Quench Heater Discharge Power Supply exploitation  Enhanced quench heater diagnostics  System integration  Cost estimate and timeline  Hardware – status of development  Vincent’s talk

TE-MPE-CP, RD, 09-June Introduction  6076 quench heater circuits in LHC used for active magnet protection –4928 x MB, 784 x MQ, 364 x IPQ, IPD, IT –Quench heater power supply type DQHDS performance in principal good but spoiled to a certain extent by one faulty component (see next slide)  At present the quench heater circuits are hardly used and stressed but this will change significantly once LHC increases energy –Magnet training campaigns, more beam induced quenches  In most cases the loss of a quench heater circuit would be acceptable but there is a risk of serious (non acceptable) collateral damage, i.e. a short to coil, which could require an exchange of a magnet –QPS supervision should indicate a potential failure of a quench heater circuit  Enhanced diagnostics must be properly integrated into existing system –Sufficient resources must be provided (material cost + manpower)

TE-MPE-CP, RD, 09-June Quench Heater Discharge Power Supply (DQHDS) exploitation  Failure rate of DQHDS basically determined by one component, the infamous main switch –Material analysis performed by CERN specialists confirmed wrong ratio of components (overshoot of hardener) in a moulded plastic part –Replacement campaign launched in 2010 (~1600 / 6076 switches so far exchanged) –Additional software interlock to take into account quench heater redundancy of the MB protection QPS_OK flag to be corrected accordingly (deployment started ~20% done together within radiation upgrade) –MTBF currently ~ 1 Mh (1.16 Mh in 2010) MTBF_MQ > 4 Mh (all updated, no faults so far), MTBF_MB ~ 0.8 Mh  Discharge tests during QPS-IST at lower energy –Successfully tested (U_HDS ~ 100 V) with IPQs during winter shutdown –Software application for fully automatic execution and analysis still to be developed

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics - motivation  Increase diagnostic capabilities for qualification and possible fault detection of the LHC main dipole quench heater circuits –Present system monitors quench heater voltage – sufficient for healthy heater circuits and DQHDS integrity check –Some dipole magnets are equipped with quench heaters which may show problems during LHC exploitation –Magnet expert wish list: Monitor discharge current Check electrical continuity of quench heater after discharge Check quench heater sanity (if possible) Check for eventual earth faults Perform discharge tests with lower energy  see exploitation –Extension to other magnet types, e.g. MQ? This needs to be clarified quickly as system integration is quite different for MB, MQ, IT, IPQ and IPD

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics - constraints  Significant but successful effort from 2009 through 2011 to stabilize QPS –System is now working correctly and reliable –Any modification must minimize impact on existing systems At this level it is by far easier to get it wrong than to get it right  Modification of existing electronics, i.e. Local Protection Unit and Quench Heater Discharge Power Supplies, not wishful: –Potentially radioactive material  special workshop etc. –High risk of collateral damage –ALARA principle  LS /2014 is one of the few occasions to perform this upgrade –Major work in the LHC tunnel due to splice consolidation Collateral damage expected Extensive re-testing of equipment required in any case

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics – possible upgrades

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics – feasibility studies I  Monitoring of discharge voltage and current –Feasible if installed as separate new data acquisition system Data acquisition at significantly higher sample rates (~20 kHz) Current measurement by dedicated tailor-made current transformer –Affordable resolution is one per mil  100 mA –Two different technical solutions elaborated Microcontroller based (integrated 12 Bit ADC) –12 Bit  25 mA / 250 mV resolution FPGA based with external 16 Bit ADC Both solutions have already been tested for radiation tolerance in previous projects –Only useful if combined with powerful analysis software –Implicates as well a change of the QPS supervision 3 PM data blocks instead of one: the selected board, the other board, heater supervision

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics – feasibility studies II  Electrical continuity and heater sanity –Old almost discarded approach of DC resistance measurements has been re-evaluated recently Measurements performed by Joaquim Mourao R0 = mΩ ΔR = mΩ w0 = 15 mm Δw = 14.7 mm

TE-MPE-CP, RD, 09-June Enhanced quench heater diagnostics – feasibility studies II  Test results indicate that an ohmmeter with ~100 µΩ resolution should be able to detect the onset of a potential rupture of the quench heater strip –Bipolar measurements required in order to compensate thermals –I = ± 100 mA  U = ± 1.2 V (R Heater ~ 12 Ω)  Measurement system must only be used with unpowered magnets –Radiation tolerance not required as system can be switched off during operation with beam –One system per protection system sufficient Also wishful in order to compare better the different heater circuits of a magnet –Design of such a system seems to be feasible at “moderate” cost (but not for free!) –Type testing of hardware ongoing  more news from Vincent

TE-MPE-CP, RD, 09-June System integration I  System integration will strongly depend on the magnet type –MB, MQ systems are different –IT, IPQ and IPD systems similar but quite different from the other two Very long cables  difficult for resistance measurement  All new systems must communicate with QPS supervision through the DAQ systems of the magnet protection –Local communication bus to be extended  new measurement electronics has to be integrated into a new protection crate For MB (1232) and MQ (392) new crates are required –Power supplies and quench detectors can be re-used –Fieldbus coupler (DQAMC) must be able to address 6 clients –Present controller used for MB and MQ can only address 4 clients  new fieldbus couplers for MQ required IT, IPD and IPQ: integration into old crates feasible –Should be done within nQPS upgrade of these systems

TE-MPE-CP, RD, 09-June System integration II  Electrical distribution boxes for racks type DYPB and DYPQ (“Crawford boxes”) to be modified as well –Necessary manipulations to be indentified and to be checked with RP whether this work can be performed on systems currently installed in the tunnel (see Vincent’s presentation) –Purchase of new boxes is most probably not significantly more expansive than the modification of the old boxes  QPS fieldbus network in the tunnel should be reconfigured in order to increase the maximum data transmission rate –Current network is loaded already up to 90% –To be done anyhow for the exploitation of the NanoFip boards  QPS supervision to be upgraded as well –New signals to be defined etc. (straight forward but tedious...) –Post mortem data transmission to be modified  QPS-IST for main circuits to be revised and extended

TE-MPE-CP, RD, 09-June Cost estimate & timeline  Table shows a first price estimate (hardware only) for the update of MB and MQ protection systems –Manpower not yet included but significant (also a lot of “donkey work”)  Time constraints –Specification and R&D phase to be completed in 2011 –Type testing early 2012 (including tests in LHC) –Purchasing procedures to be launched as well early 2012 (potential bottleneck, especially for orders > 200 kCHF) –Production 2 nd half 2012, 2013 –Test & installation during LS /2014