The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.

Slides:



Advertisements
Similar presentations
Some potential issues with the CDCM Franck Latrémolière CDCM review workshop, 17 May 2011.
Advertisements

Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Update on IDNO/DNO working group DCMF 12 November 2009.
Generation Dominated Areas Oliver Day 5 April | Energy Networks Association - DCMF.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Electricity Interconnectors in GB
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
HRA Self-Financing Update What it means & what we’ve done Housing Briefing 19 January 2012.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
Update from DCUSA Elizabeth Lawlor DCUSA Secretariat 01 December | Energy Networks Association - DCMF.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
EDCM Development Workshop Welcome 1 | Energy Networks Association 13 January 2011.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Holistic view of Charging Modifications – In flight 11th June 2018
Design Workshop: Financial Overview 28th July 2016
Mod 621A Supporting analysis
Generation Dominated Areas(GDA)
Presentation transcript:

The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011

2 The EDCM objective The objective of the EDCM is to introduce a common charging methodology across the country which is cost reflective and which accounts for key developments in the DNO networks (such as the emergence of DGs and IDNOs). Where are we in the process? 1 April 2011: The DNOs submitted their EDCM proposal to Ofgem 20 May 2011: Ofgem published a consultation on the EDCM proposals

3 Consultation overview Our consultation highlights 21 issues -core principles -issues where the DNOs have moved since their last consultation -issues where we consider that conditions may be necessary for us to approve the methodology Issues are classified as “demand”, “generation”, “IDNO” or “common” In addition we discuss implementation issues (ie phasing/delay) We provide an overview of the methodology for demand, generation and IDNOs and a more high level overview in chapter 2

4 Demand issues Issue 1: the demand revenue target Issue 2: principles guiding the use of capacity as a cost driver Issue 3: allocation of indirects and a portion of the residual based on capacity Issue 4: allocation of direct operating costs, network rates and a proportion of the residual based on notional shared asset value Issue 5: calculation of network use factors Issue 6: allocation of the residual Issue 7: customer categories EDCM consultation issues

5 Generation issues Issue 8: the generation revenue target Issue 9: scaling Issue 10: application of generation credits to units exported during super-red Issue 11: no credit for intermittent generation Issue 12: import charges for generation-dominated mixed import-export sites EDCM consultation issues

6 LDNO issues Issue 13: CDCM/EDCM boundary Issue 14: components of location specific charge paid by the LDNO Issue 15: number of discount tariffs (connection types) applicable to LDNOs Issue 16: capping discount percentages to 100 per cent EDCM consultation issues

7 Common issues Issue 17: sole use asset charge Issue 18: demand/generation side management Issue 19: reactive power charges Issue 20: sense checking of branch incremental costs in LRIC Issue 21: volatility EDCM consultation issues

8 Volatility We are considering placing a requirement on DNOs to deliver a package of measures to help customers deal with uncertainty around EDCM charges. Measures would aim to –mitigate inherent year on year volatility –provide optional access to a “long term product” Separately, we are considering a new requirement on DNOs to provide assistance to companies most affected by the step change in tariffs We invite stakeholders’ views

9 ForAgainst Full implementation by 1 April 2012 benefits realised asap substantial notice already given significant impact on some customers difficult economic climate Delayed implementation easy to implement provides time to adjust to new methodology defers realisation of benefits disadvantages customers with decreasing charges cost-reflectivity diluted Phased implementation provides time to adjust to new methodology difficult to implement could involve cross subsidy during transition makes mods difficult during transition Phased implementation only for customers with a “large” charge increase mitigation given to those most affected where to draw the line? EDCM Implementation

10 Next steps Ofgem workshop on EDCM charging for demand…………………6 June 2011 Ofgem workshop on EDCM charging for generation……………9 June 2011 Consultation responses…………………………………………………………4 July 2011  Responses on phasing………………………………………………24 June 2011 Ofgem’s decision……………………………………………………………………Aug/Sep 2011 EDCM implementation……………………………………………………………1 April 2012

11