Itzhak Tserruya, July 7, 20041  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.

Slides:



Advertisements
Similar presentations
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Advertisements

Benji Lewis APS April Meeting Hadron Blind Detector implementation during PHENIX Run-10 Benji Lewis On behalf of the PHENIX Collaboration.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status Update on Mechanical Prototype in Rome November 6,
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CsI Photocathode Production and Testing
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 AGENDA: HBD NIM paper#2 Itzhak HBD HV system HBD monitoring Acceptance and total number of channels Proposal status Large GEM tests Lev Monte Carlo Ilia.
C.Shalem et al, IEEE 2004, Rome, October 18 R. Chechik et al. ________________RICH2004_____________ Playa del Carmen, Mexico 1 Thick GEM-like multipliers:
Status of PNPI R&D for choice of the MUCH tracking base detector (this work is supported by INTAS) ■ Introduction ■ MICROMEGAS ■ GEM ■ MICROMEGAS+GEM ■
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
HV connection for a Common GEM foil design Aiwu Zhang
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Prototype Tests and Construction of the Hadron Blind Detector for the PHENIX Experiment at RHIC Craig Woody Brookhaven National Lab For the PHENIX Collaboration.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
Itzhak Tserruya IEEE 2007, October 29, 2007, Hawaii Itzhak Tserruya Weizmann Institute of Science, Rehovot, Israel for the HBD group: for the HBD group:
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
10/26/06Takao Sakaguchi, BNL1 Hadron Blind Detector for the PHENIX experiment at RHIC Takao Sakaguchi Brookhaven National Laboratory For the PHENIX Collaboration.
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Future Possibilities for Measuring Low Mass Lepton Pairs in Christine Aidala for the Collaboration Quark Matter 2002, Nantes.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
RICH detector for CLAS12 CLAS12 Technical Workshop P. Rossi Laboratori Nazionali di Frascati - INFN.
1 Alexander Milov CIPANP06 June 02, 2006 Hadron Blind Detector for PHENIX experiment at RHIC Alexander Milov (for the PHENIX collaboration) Jun 02, 2006.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Sasha Milov Phenix focus HBD June 20, 2006 Hadron Blind Detector for low mass di-leptons in PHENIX Sasha Milov (PHENIX focus on HBD) Jun 20, 2006.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
R&D on Hadron Blind detector, recent results Issues addressed: - gain limits in CF 4 with heavily ionizing particles - operation.
1 Alexander Milov Goldhaber Mini-Symposium Jan 26, 2006 Hadron Blind Detector for PHENIX experiment at RHIC Alexander M. Milov Jan 26, 2006.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
-Stephan AUNE- RD51 BARI. Saclay MPGD workshop R&D 09/10/20101 Saclay workshop R&D for new Bulk structure.
Activity of CERN and LNF Groups on Large Area GEM Detectors
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Development of GEM at CNS
Presentation transcript:

Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September 15, 2004

Itzhak Tserruya, July 7, HBD Proposal: (I) Layout 1. Physics motivation and background (Axel) - importance and significance of low-mass dileptons - summary of results at lower energies - expectations at RHIC - combinatorial background in PHENIX baseline detector and role of HBD 2. Ideal Monte Carlo simulations, system specifications (Summary of TN391) (Zeev) 3. Detector concept (Itzhak) 4. R&D results (Itzhak and Zeev ) - GEM gain in pure CF4 - Hadron blindness: * Photo-electron efficiency: - Gain saturation * Pion rejection factor: KEK results - Discharge probability - CsI quantum efficiency - Ion backflow - UV transparency of CF4 - Operation wih CsI photocathode - Absorption in H2O and O2 (Babak) - Tests in PHENIX environment (Craig) - Aging studies 5. Monte Carlo simulations and system performance (Ilia) 6. Electronics (Craig) - analog (Craig) - digital (Chi) 7. Trigger (David, Matthias) 8. Detector design and construction procedure (Itzhak) 9. Gas system (Craig) 10. Detector assembly and test facility (Sasha) 11. Estimated cost, Responsibilities and Time Table (Craig, Itzhak)

Itzhak Tserruya, July 7, HBD Proposal: (II) Logistics 1. Write all text in latex 2. Web page: 3. Timetable u All material in place by 1 st week of October. u Release to the Collaboration in October Core Week?

Itzhak Tserruya, July 7, Ongoing Activities 1. Large GEM test 2. Full size prototype 3. Monte Carlo (see Ilia’s presentation)

Itzhak Tserruya, July 7, Large GEM Test  12 Large GEMs in house 8 standard + 4 Au plated active area 228 x 237 mm 2 high voltage segmentation on top and bottom faces  15 Frames with spacer in house  PCB with hexagonal pads ready  Stretching and gluing devices ready  Stainless steel box ready and vacuum tested  Extension to CsI evaporator under construction

Itzhak Tserruya, July 7, GEM design- Bottom side (not to scale) Operational area (holes), 228mm Copper coated area, 232mm Bottom segment, 5mm Exact segmentation scheme for the bottom side: 1 segment of 7.5mm +45 segments of 5mm + 1 segment of 4.5mm Bottom segments are Staggered by 2.5mm with respect to the top segments 3mm 19mm 4mm for SMD resistors 3mm 241mm Kapton > ~400 mm Holes: 140 um pitch 80/60 um diameter Gaps between segments: As for COMPASS 237mm 241mm 12 Large GEMs in house: 8 standard + 4 Au plated active area 228 x 237 mm 2 HV segmentation on both faces

Itzhak Tserruya, July 7, GEM design - Top side (not to scale) Gaps between segments: As for COMPASS Operational area (holes), 228mm Copper coated area, 232mm 3mm 19mm 4mm for SMD resistors 3mm 241mm Kapton > ~400 mm Holes: 140 um pitch 80/60 um diameter 237mm 241mm Top segment, 5mm Exact segmentation scheme for the top side: 46 segments of 5mm + 1 segment of 7mm

Itzhak Tserruya, July 7, G10 Frame Material G10 Thickness 1.5mm Width 5mm 249mm 5mm Thickness 0.3 mm 240mm holes D2.5mm Very fragile but needed to limit the dead area Estimated dead area for a 5mm wide frame is 6%.

Itzhak Tserruya, July 7, The electrostatic pressure between GEMs: 0.5 N/m 2 Limit the sagitta to 100μ  Need a tension of app. 40 N/m Stretching Device

Itzhak Tserruya, July 7, Gluing Device Glue dispenser: 100μ thick layer 4mm width

Itzhak Tserruya, July 7, Full-size prototype 1. Box design finished 2. Working on the design of tooling and jigs 3. All raw materials ordered and most of them already in house. 4. The plan is to construct a full size box and to equip it with one detector element only. 5. Once tested, the box will be shipped to BNL. Expected to happen by the end of the year.

Itzhak Tserruya, July 7, Plans for the next 2-3 months 1. Large GEM test : Sept-Oct 2. Full size prototype: Oct-Nov 3. Monte Carlo: Sept –Oct. 4. Conferences u CAARI, October 10.15, Texas Bob u IEEE, October 16-22, Rome, Craig