HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011.

Slides:



Advertisements
Similar presentations
Interface between WPs inside FP7 HiLumi and WPs/Systems outside Lucio Rossi HL-LHC Project Coordinator CERN HiLumi/LARP collaboration Meeting 17 November.
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Role of Management and Technical Coordination
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Future Accelerators at the High Energy Frontier
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
CERN- KEK about LHC upgrades programs Lucio Rossi 14 December 2011.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
LHC High Luminosity Upgrade plans (including introduction to FP7 Hi-Lumi Design Study) Lucio Rossi CERN sLHC-PP Public CERN 8 March 2011.
HL-LHC Organization: Now and post HiLumi
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
TE-CRG Activities D. Delikaris, TE-CRG.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
The High Luminosity LHC Project
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Design Study High Luminosity LHC (HL-LHC) Collaborative Project FP7-INFRASTRUCTURE-2010 By Lucio Rossi – CERN 1st CERN 20 July.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
HL-LHC: project status and plans Lucio Rossi – LARP CM16, Montauk 16 May 2011.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Operating IP8 at high luminosity in the HL-LHC era
High Luminosity LHC (HL-LHC) and Magnet progress
ICE SECTION The coolest place to be! Elias Métral
Plans towards CC in the LHC a US – centric perspective
SLHC –PP WP6 LHC IR Upgrade - Phase I.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
FP7-HiLumi LHC Design Study Summary and Feedback
e-lens Readiness Review Introduction
Optimization of Triplet Field Quality in Collision
The HL-LHC project: info day for industry
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
HL-LHC project overview
Francesco Forti University and INFN, Pisa
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
Alternative design of the matching section for crab-cavity operation
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Presentation transcript:

HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011

Content Scope Structure Management Situation of CERN budget Situation of HiLumi FP7 DS HL kick off internal day

How the luminosity might evolve optimistic to 2012, then prudent: nominal HL kick off internal day3 Data from M. Lamont Graph E. Todesco NOT yet validated in LMC Based on 15 months LS1 now under change

HL kick off internal day4 Data from M. Lamont Graph E. Todesco NOT yet validated in LMC How the luminosity might evolve optimistic to 2012, then nominal -cont 220 inv fb by end of 2020 Based on 15 months LS1 now under change

Lumi evolution: more otpimistic (ultimate=2xnominal) is reached HL kick off internal day5 If LHC performs « nominal »: the upgrade is required by the saturation If LHC performs better, saturation is 2 years later, but radiation limits may come in earlier In such case we may reach 320 inv. fb for end of Data from M. Lamont Graph E. Todesco NOT yet validated in LMC Based on 15 months LS1 now under change

The goal The main objective of HL-LHC is to implement a hardware configuration and a set of beam parameters that will allow the LHC to reach the following targets: A peak luminosity of 5×10 34 cm -2 s -1 with levelling, allowing: An integrated luminosity of 250 fb -1 per year, enabling the goal of 3000 fb -1 twelve years after the upgrade. This luminosity is more than ten times the luminosity reach of the first 10 years of the LHC lifetime. HL kick off internal day

Goal – cont. Levelled lumi of LL p =5  s -1 cm -2 (not Hz cm -2 ) Annual integrated luminosty: IL =250 fb-1 – More than 1 fb -1 a day Which is more important? I guess IL. We take L p as guideline, not a barrier, however it is understood that this is the nominal limit. These goals are already questioning parameter space of Linear Collider: we need to be correct, optimist but not overoptimist HL kick off internal day

We need to have potential for L p =10-15  (before levelling) – Today the preferred baseline is to reach and then « crabbing ». But may be we put crab at max immediately and then use another parameters. – We cannot rely only on one scheme: we need to have scheme with very low  and not small , we need to explore very high beam curent and moderate beam current, and having more than on leveling methods. – Many actions will be needed in addition to the most visible being discussed today to reach integrated : Turn around time: will allow « releasing » beam current (protection) Stops, Shutdowns, etc… – Advanced robotics and monitoring? – Remove on surface of sensible equipments. To be worked out with experiments The upgrade is « ultimate consolidation », too. I see these actions as a « continuum » with some spike activities, the biggest being HL kick off internal day

Structure By deliverable – Study and R&D (big part in FP7 HiLumi Design Study and Eucard(2)) – Construction tooling&infrastructure, if needed, components, Assembly Test (on surface) – Installation, commissioning This way external contribution are easy to evidence and to account Also is easy to do a cost-to-completion and decision making by line management My view is to agree at Management level the cost (M+P) and time profile, then transfer resources (with clear control) to Department/Groups. It is their job to efficiently manage it and our job to check, to see sufferance or excess and propose transfers/integrations. Contingency at CERN level (or Project with full transparency toward management, but see US project: in this way contingency is always used) The cost-structure should be based on CORE-cost. This will easy in-kind contribution and make them visible. Next slides: quick overview, details and substructure to be discussed with various leaders of projects and systems. HL kick off internal day

HL-LHC composition Collimation Project Matching section and correctors Beam Diagnostics High Field Magnets R&D HE-LHC Studies Hardware Commissioning HL kick off internal day

HL-LHC management HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day

HL kick off internal day Long term R&D aimed at SC R&D and validation via FRESCA2 (13 T 100 mm) Preparation of EU Sc cable, tooling technologies (help from US-LRP)

HiLumi FP7 Design Study Saclay - 8 Feb 2011Lucio End of year

Large participation application 25 Nov 2010 Saclay - 8 Feb 2011Lucio

HiLumi is the focal point of 20 years of converging International collaboration The collaboration wiht US on LHC upgrafe started during the cosntruction of LHC EU programs have been instruemntal in federatin all EU efforts With Hi-Lumi the coordination makes a step further: from coordinated R&D to a common project CERN is not anymore the unique owner, rather is the motor and cathalizer of a wider effort. Manged like a large detector collaboration (with CERN in special position as operator of LHC) Saclay - 8 Feb 2011Lucio

Budget FP7 HiLumi Saclay - 8 Feb 2011Lucio Waiving effect CERN waives all technical works: LHC is core program. Only kept the CERN cost for managem. 50% 85% of CERN gen. mngt Only EU research area N.1/67 Score 15/ M€

Budget cont. Saclay - 8 Feb 2011Lucio Personnel for HiLumi by WP 1.Manag and Tech. Coord. (6%) 2.Acc. Physics and beam 3.Magnets for IR 4.Crab Cavities 5.Collimators 6.Sc links Estimated cost for the the whole HL-LHC over 10 years in M€ Precise cost evaluation by end 2011

In-Kind contributions: targets Profiting of LARP – 200 M$ from USA (US accounting) 5 G¥ (50 MCHF) from Japan Others? – Member states? Difficult or impossible? CH and FR are theobvious candidates Othr MSs (or Labs) with specific interest or exchange of help we give them – Non MSs: we need to think wide… HL kick off internal day27

conclusions HL kick off internal day28