Innovative Approaches to Real-Time System Management Information Kevin Korth Traffic Operations Engineer FHWA California Division May 21, 2014.

Slides:



Advertisements
Similar presentations
State Aid Standards Development March STATE AID AUTHORITY / RESPONSONSIBILTY Authorized by Minnesota Statutes 162 Rules Chapter 8820 Include Design.
Advertisements

SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
ShakeCast: An Application of Post- Earthquake Response Technologies Loren Turner Division of Research & Innovation GeoResearch Group (GRG)
Pedestrian Safety Action Plans (PSAP) and Focus State / Focus Cities Initiatives for Pedestrian Safety in California David Cohen Safety Specialist FHWA.
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
1 Trade Corridor Improvement Fund March 5, 2008 Southern California Consensus Group.
Environmental Assessment Public Meeting
ITS To Streamline Development Review 2012 ITE Western District Annual Meeting Santa Barbara, California June Presented by Chun Wong Transportation.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Caltrans IRIS – T3 Webinar T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB) at the U.S. Department of Transportation’s.
I-65 Added Travel Lanes Project in Tippecanoe County
You Are the Traffic Jam: Examination of Congestion Measures
DETERMINATION OF FREIGHT CORRIDORS FOR THE STATE OF CALIFORNIA Texas A&M University Civil Engineering Department CVEN April 28, 2003 ADHARA CASTELBLANCO.
Urban Economics Economics generally studies how markets work A market consists of a collection of buyers and sellers exchanging goods and services Urban.
Mandy Chu Office Chief Highway System Information and Performance Division of Research, Innovation and System Information Introduction to HPMS Highway.
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Truths and Myths about Traffic Data Truths and Myths about Traffic Data ITSA Presentation June 2007 AirSage Proprietary & Confidential.
Cape Cod Transportation Improvement Program (TIP) HOW DOES A PROJECT GET ONTO THE TIP ? Priscilla Leclerc, Senior Transportation Planner Cape Cod Commission.
Use of ShakeMap in Emergency Management Loren Turner Caltrans, Division of Research & Innovation.
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
California’sInfrastructureCrisis. Statewide Transportation System Needs Assessment 2011 “California’s transportation system is in jeopardy. Underfunding.
Western Region CSREES Administrative Officer’s Meeting Monterey, California October 4 – 6, 2005 Janet Downey, Staff Accountant OEP, POFMB, Oversight Section.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
UCLA Lake Arrowhead Symposium Transportation and the Recovery Act.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Use the 5 core federal aid programs to fund training and workforce development. FUNDING LOCAL PUBLIC AGENCY TRAINING AND WORKFORCE DEVELOPMENT THROUGH.
Esri Roads and Highways: An Introduction to Roadway Reporter
A Cross-State Comparison of Arkansas's Highway Financing and Infrastructure Quality.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
Sang Yoo Rahall Transportation Institute. Appalachian Regional Commission (ARC)  A Regional economic development agency that represents a partnership.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Background The Federal Highway Act was signed on June 29, marks the 50 th Anniversary of the resulting Interstate Highway System A year-long.
October April 13, 2010 – Québec City Travis Black, Co-Chair – U.S. Federal Highway Administration Daniel McGregor, Co-Chair – Transport Canada Border Infrastructure.
TxDOT UTP Category 3 Urban Area (Non-TMA) Corridor Projects Workshops.
Steve Heminger Executive Director Metropolitan Transportation Commission May 2010 Financing California’s Transportation System.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 Transit Planning Presented by Priscilla Martinez-Velez California Department.
Caltrans Research Highlights Presented by The California Department of Transportation Tab 63.
The 4 th Annual India Trade Conference. 2 India Trade Conference Logistics challenges and solutions New Delhi Kolkata Chennai Mumbai Puna.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
1 And the nominees are Project: Illinois Statewide ITS Strategic Plan and Architecture Project Lead: Illinois DOT Project Team:
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Transportation Operations Goals and Accomplishments Institute of Transportation Engineers 2001 Spring Conference and Exhibit Dr. Christine Johnson D irector,
1 Transportation Systems Management & Operations A New Paradigm for the 21 st Century Transportation Department Group 3 3 Notches Above the Rest.
Transportation Planning: A Field in Flux Steve Heminger, Executive Director Metropolitan Transportation Commission April 2004.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Julie Skallman State Aid Division Director & State Aid Engineer.
Clay Packard, PE ITS GC Software Project Manager Florida Department of Transportation WAZE – FDOT Integration.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
1 NCHRP Guidance on Quantifying Benefits of TIM Strategies – Quarterly Progress Review WebEx Bill Legg, Washington State Intelligent Transportation.
Tiffany Julien Office of Freight Management and Operations Implementation of the National Freight Network 1.
California 511 Statewide Workshop #7 March 3-4, 2008 Caltrans “provides its travel information directly to the public, through commercial/media information.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
SAFETEA-LU Section 1201 Real-Time System Management Information 23 CFR Part 511 AASHTO SSOM Task Force on Systems Operations Performance Measures 9 April.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
LCS Objectives Provide a standard interface for lane closure operations, closure tracking, and data retrieval for WisDOT regional offices statewide Provide.
Pre-State Allocation Board Meeting October 26, 2011 Presented By California Department of Education.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
1 Caltrans District 4 - ABAG Workshop - INFRASTRUCTURE INTERDEPENDENCIES January 31, 2012 California Department of Transportation (Caltrans) www. dot.ca.gov.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
1 U.S. Department of Transportation ITS Joint Program Office CASE STUDY #3 INTEGRATING THIRD PARTY CROWDSOURCED DATA Elizabeth Birriel, Florida DOT.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Multi-state Applied Weather Concepts
Focus State Initiative: TIM Performance Measures
Presentation transcript:

Innovative Approaches to Real-Time System Management Information Kevin Korth Traffic Operations Engineer FHWA California Division May 21, 2014

Background Accuracy Availability Routes of Significance Outline

Past (1960s): –Hourly teleprinter reports to subscribers –State and Federal agencies, AAA, and Chambers of Commerce, – No direct to public feed. Present: –Actively working on RTSMIP for 1 year prior to kick off –Resource Center kick off April 2014 Background

2,457 miles of interstate –25 numbered routes 6 MSAs over 1 Million –Los Angeles-Long Beach-Santa Ana –Riverside-San Bernardino-Ontario –Sacramento-Arden-Arcade-Roseville –San Diego-Carlsbad-San Marcos –San Francisco-Oakland-Fremont –San Jose-Sunnyvale-Santa Clara Background

Caltrans Districts and Planning Agencies Courtesy of Caltrans

TMC Configuration

Proposed Planned lane closures not real time Assess accuracy of data the public sees –Online and on highway 1097 “event start” 1098 “event end” Accuracy

Example: Construction Accuracy

8 of 12 TMCs are 24/7 – 24-hour TMCs cover other districts overnight – Data stream is 24/7 – Storage system: Commercial Wholesale Web Portal (CWWP) Redundant servers – Collection system: 15 minutes daily Daily maintenance downtime Availability

Routes of Significance May 30, 2014 Provide contact information of the individual/individuals that will assume responsibilities regarding ROS Sept. 30, 2014 Provide a list of your proposed ROS and demonstrate how each ROS meets or will meet the criteria June 30, 2015 If the criteria for proposed ROS cannot be met prior to date, then the roadway will not be given consideration. June 1, 2016 Local or regional agency must share the strategic plan for Accuracy and Availability with Caltrans Nov. 8, 2016 Provide Traveler Information for identified ROS approved by the Federal Highway Administration

Background Accuracy Availability Routes of Significance Summary

Questions Kevin Korth Traffic Operations Engineer FHWA California Division Office (916)