Network Model Management System (NMMS)

Slides:



Advertisements
Similar presentations
Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
Advertisements

1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Network (Common) Model Management System Presentation to ERCOT October 21, 2008 Thomas F Garrity Vice President Energy Management and Automation Siemens.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
RDWG – MP Online Data Entry – Project Priority List / Update July 30, 2013 Troy Anderson.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
QSE/RE Transmission Facilities Outage Coordination Workshop.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
CRR Model Building Process Bradley Bell CRR Engineer.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
U.S. Environmental Protection Agency Central Data Exchange Pilot Project Promoting Geospatial Data Exchange Between EPA and State Partners. April 25, 2007.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
2009 Project Prioritization Troy Anderson ERCOT Program Management Office February 20, 2008.
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Nodal Market Settlement and Invoicing Timeline ERCOT COPS Meeting January 9, 2006 Eric Woelfel, Formosa Utility Ventures Jim Galvin, Tenaska Power Services.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
EDS 2 Early Delivery Systems Approach March 2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Time-Based Management of Large Scale Network Models
Presentation transcript:

Network Model Management System (NMMS)

Basic Outline High Level Overview Why? How? Expectations? Conceptual Flow Examples So, the impact is?

Network Model Management System High Level Overview In a nutshell, the software that is currently projected to be the omnipresent relationship-based modeling warehouse for ERCOT. In other words, all models to be developed from a single Model Database.

NMMS Salient Points Why? (Drawbacks of current system) The model update software and associated process does not provide a reasonable and practical method for providing a variant of the on-line Operations Model to study known or anticipated future power system configurations. The current data link software does not provide the flexibility that is needed to properly track and report status of submitted change packages. With the current model editor, company names, substation facilities, weather zones and other database elements cannot be changed within the Operations Model without impacting all associated database links, pointers, and indices.

NMMS Salient Points Why? (Drawbacks of current system) The current model editor does not provide an integrated automatic link with SCADA (ICCP and RTU) data. The Operations Model and outage scheduler package should be directly linked to allow accurate and automatic flow of data between the two packages. The current model editor allows extremely limited data export capability.

Network Model Management System How? Began in 2003 with proposal to: Improve data exchange interface between ERCOT and data submitters. Reduce man hours required to load a changed model into the Production system. Improve accuracy checks for incoming data and data inserted into the Production model. Improve consistency between the Annual Planning Model and the Network Operations Model. Improve tracking of planned projects as they move from planning to construction.

Network Model Management System How? Project re-directed in late 2005 to support compliance with Nodal Protocol requirements. Additional challenges in Nodal Protocol: Model timelines). Information posting requirements. Data and Name consistency between models.

NMMS Salient Points Expectation? (Benefits of NMMS) Timely and accurate representation of the Transmission Grid using Market Participant provided change packets (Projects) containing future Transmission Grid information. Significantly more accurate field data correspondence to be utilized (Outage Scheduling< State Estimator, Study Contingency Analysis, etc). Single source of data for Planning, CRR, and Operations models to drive consistency.

NMMS Salient Points Expectations? (Benefits of NMMS) Proper tracking and notification regarding Market Participant provided Project information. More efficient utilization of current staff. Significant reduction of confusion related to naming and ownership changes. Significant reduction of time to produce more accurate one-lines. Increased data retrieval and transfer flexibility.

NMMS Conceptual flow diagram

Data Submittals Example of notification improvements 1. Reports will be available to list all pending submittals. 2. Updates and confirmation for in-service dates, will be requested weekly. 3. Status of submittals will be available to ERCOT and submitters. 4. Submitters may query and sort their projects to facilitate close coordination with ERCOT on pending projects. 5. Submitters and Planning will be reminded of upcoming Planning projects that may need to be converted to Operations projects. 6. Data submittal forms and conventions controlled by Portal. 7. Approved Project “in-service” date schedules published weekly.

Data Submittal “Highlights” Example Check Project for completeness. Request additional data when needed. Perform accuracy checks on submittal. Post the accepted Project. Add changed contingency files and one-line display changes. Model changes moved to a Test System to perform load flows, base LMP calculations, contingency analysis, and validation (30 days of testing). Move Project to Model database as complete “pending” Project. Project is approved for energization on date as submitted.

Model Database Database consist of “Today's Model” plus accepted Projects.

So, The impact is? (HIGH LEVEL) Data submittal work flows will change. Model data submittals will be completed through NMMS (including Planning, CRR, and Network Operations as well as others). Many Operation data submittals will be based on previous Planning submittals. Timelines (Nodal Requirements- timing, consistency). Modeling issues will need further review. Ownership designation (ZBR issue). Tap versus No Tap. Software Application issues (Synchronous condenser versus StatCom). Contingency lists.

Questions ?