Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.

Slides:



Advertisements
Similar presentations
Health impact assessment explained
Advertisements

National Environmental Policy Act of 1969 (NEPA).
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Environmental Assessment in Nova Scotia
Risk and RACI: Defining Clear Roles
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Lesson 1 ODOT Simple Models. Simple Models Learning Outcomes As part of a group, develop conceptual models of REC, stressors, and a highway project Identify.
National Environmental Policy Act of Establishes protection of the environment as a national priority Mandates that environmental impacts be considered.
Environmental Impact Assessment
PROTECTFP Work Package 1:- results from questionnaire and overview of tools for chemical assessment.
Current Status of Public Participation in the EIA Process in China Seoul Korea, June 2007 By Zhao Xinfeng Appraisal Center for Environment and Engineering,
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
Basic Concepts for Assessing Environmental Impacts [DATE][SPEAKERS NAMES]
ENVIRONMENTAL MANAGEMENT PLAN
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Environmental Impact Assessment University of Santo Tomas College of Architecture SP2 Ecological Construction Environmental Architecture.
Federal Regulation of Land Use 9/27/11. What is NEPA? NEPA = National Environmental Protection Policy Act – Mandates an environmental assessment of all.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
MEASURING CHANGES OF THE SYSTEM Environmental Gradients Human Impacts Environmental Impact Assessments (EIA’s) Modified from DARLENE OEHLKE.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Information Requirements and Tools for Screening and Preliminary Assessment.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Basic Concepts for Assessing Environmental Impacts.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Using the DSF to assess scenarios Some things it will do for you - and some things it won’t.
Delivering sustainable solutions in a more competitive world Application of Strategic Environmental Assessment (SEA) to the BDP Environmental Resources.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Homework & Homework Application
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
CALIFORNIA'S STATE WILDLIFE ACTION PLAN 2015 UPDATE A Conservation Legacy for Californians Armand Gonzales, Project Lead.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
STARTER: Recipe time! Write a recipe for the requirements of an EIA (Environmental Impact Assessment). When you’re done – brainstorm the advantages and.
1 Completing the CEQA Checklist Terry Rivasplata.
Monitoring Programme. What is monitoring? Environmental monitoring is the systematic observation, measurement and calculation of the condition of the.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
Chapter 10: Land, Public and Private
Jerzy Jendrośka Decisions on proposed activities not listed in annex 1 of the Convention (article 6 paragraph 1 (b) of the Convention) Task Force on Public.
Land, Public and Private. Human Activities Affecting Land and Environment  Extensive logging – mudslides  Deforestation – climate change  Paving –
Economics, Policy,and the FutureSection 2 Section 2: Environmental Policies in the United States Preview Bellringer Objectives History of U.S. Environmental.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
3.2 Natural Capital Human Population, Carrying Capacity, and Resource Use.
Environmental Systems
Environmental Impact Assessment:
2.3 Measuring Biotic Components of the system
Using the 5Ws above, produce questions related to this photograph
National Environmental Policy Act of 1969 (NEPA)
2017 BCGWA Regional Meeting Environmental Flow Needs (EFNs)
Assessment Statements
National Environmental Policy Act of 1969 (NEPA)
ENVIRONMENTAL ASPECT Element of an organization’s activities or products or services that can interact with the environment A significant environmental.
Environmental Systems
Environmental Impact Assessments
2.7 Measuring changes in the system
Basics of Environmental Impact Assessment
The purpose of screening
Environmental Impact Assessment EIA
Presentation transcript:

Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think the mine should go ahead. Give reasons to support your answer.

Environmental Impact Assessments (EIA)

Learning outcomes You should all be able to: Identify the different aspects of an Environmental Impact Assessment (EIA) Most of you should be able to: Describe the use of an EIA Some of you might be able to: Evaluate the use of an EIA

The purpose of an EIA is to establish the impact of a project on the environment. Predicts possible impacts on habitats, species and ecosystems. Helps decision makers decide if the development should go ahead. Addresses the mitigation of potential environmental impacts associated with the development. The report should provide a non-technical summary for the public and the media.

History In 1969 the US Federal Government passed the National Environmental Policy Act (NEPA). This made it a priority for Federal agencies to consider the natural environment for any land use planning. Over the next 20 years other countries included EIAs in their planning policies: Canada, 1973 Columbia, 1974 Netherlands, 1981 UK, 1988 Mexico, 1988

What are EIAs used for? Often part of a national planning process for large scale developments. Developments that need an EIA differ from country to country. The Three Gorges Dam in China - needed an EIA.

Examples Major new road networks, e.g. Durango – Mazatlan highway Airport and port developments, e.g. Maasvlate Port development Rotterdam, Netherlands Building power stations, e.g. Severn Power Station, UK Building dams and reservoirs, e.g. Three Gorges Dam, China Quarrying Large scale housing projects Severn Power Station, UK Durango – Mazatlan highway, Mexico

Group Activity: Sort out the statements B. Predicting the scale of potential impacts. A. Limiting the effects of impacts to acceptable limits (MITIGATION). D. Deciding if an EIA is needed and which impacts need to be considered (SCREENING). C. Identifying impacts (SCOPING).

Stages of an EIA Deciding if an EIA is needed and which impacts need to be considered (SCREENING). Identifying impacts (SCOPING). Predicting the scale of potential impacts. Limiting the effects of impacts to acceptable limits (MITIGATION).

Baseline Study Carried out because we need to know what the physical and biological environment is like, before the project starts. Variables measured as part of a baseline study include: Habitat type and abundance (total area of each habitat) Species list (number of species, flora and fauna) Species diversity (estimate abundance and calculate diversity) List of endangered species Land use (land use type and coverage) Hydrology (volume, discharge, flows and water quality) Human population (present population) Soil (quality, fertility, pH) Group Thought: What variables do you think would be measured?

Measuring Impact Consider all potential environmental impacts whether good or bad. Detail the potentially significant impacts on:

Evaluation When evaluating the environmental impact of different projects the following criteria are used: Magnitude: Extent: Duration: In pairs discuss what you thing they mean… What scale will the impact have? How big an area does the impact affect? Site only, local or regional. How long will the impact be for? Short, Medium or Long term.