S-17 Reference Model Status Robin Lafever 21 October 2004.

Slides:



Advertisements
Similar presentations
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Advertisements

1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
Thermal Design and Modeling for Infra Red Spectroscopic Imaging Survey Payload (IRSIS) S. L. D’Costa.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Telescopes and Spacecraft Astronomy 311 Professor Lee Carkner Lecture 7.
Physics 52 - Heat and Optics Dr. Joseph F. Becker Physics Department San Jose State University © 2003 J. F. Becker San Jose State University Physics 52.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
SDW2005, juin, Taormina The Corot Space instrument.
Thermal Modeling and Model Correlation of the LORRI Telescope
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
Dennis C. Evans p1 SuperNova/Acceleration Probe 16 November 2001 Optical Analysis & Stray Light Evaluation Optical Analysis and Stray Light Evaluation.
Solar orbiter – EUS instrument mechanical design Tim Froud and Doug Griffin.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
A SEMINAR ON HUBBLE SPACE TELESCOPE PRESENTED BY: HARI OM ELECTRONICS & COMMUNICATION REG NO SECTION-C ROLL NO.– 123.

Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Telescopes October 31. Telescope Design There are two types of optical telescopes – Reflecting-uses a curved mirror to gather and concentrate a beam of.
Telescopes Science 9. Telescopes The main purpose of a telescope is to gather light Images that form can be recorded by taking a picture or a video.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Telescope Integration and Tests Tuesday Afternoon.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Opto-Mechanics for SNAP at UM
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
Primary mirror Secondary mirror Spectroscopy focal plane Imager focal plane Beamsplitter Fully articulated solar panels and antenna Tertiary mirror Prism.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
Henry Heetderks Space Sciences Laboratory, UCB
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
An alternative spectrograph mount Bruce C. Bigelow University of Michigan Department of Physics 5/14/04.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope W. Oegerle 1, L. Feinberg 1, L. Purves 1, T. Hyde 1, H. Thronson 1, J. Townsend 1, M. Postman.
AMS-02 tracker mechanics status of construction, assembly, integration Ladder assembly Ladder installation on planes Integration details, cooling loop,
Lower Baffle Robert Besuner 26 August Background/Purpose This study follows on to 12 August study of the Spacecraft Interface/Handling Ring. —In.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
Jeff Bolognese p1 Super Nova/Acceleration Probe 16 November 2001 Structural Analysis Jeff Bolognese 16 November 2001.
Mass Simulator Concepts Robert Besuner 12 October 2005.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Spacecraft Mockups Applied to SNAP M-21 Baseline Mockup.
Stars, Planets, Moons, too! Doing the Solar System Boogaloo!
Rose Navarro HMI Lead Thermal Engineer
Update on PANDA solenoid design
The LHCb Installation Story
Scott Wakely University of Vengeance
ComCam Cryostat Justine Haupt Mar. 6, 2017
TEMPERATURE SENSOR LOCATIONS
Technical Summary - ANL
Henry Heetderks Space Sciences Laboratory, UCB
Instrument Overview Larry Springer HMI Program Manager
THERMAL CONTROL SYSTEM
Standardized CCD and MCT detector mounting configurations
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

S-17 Reference Model Status Robin Lafever 21 October 2004

2 The (mostly) ALL NEW S-17 Reference Model Featuring TMA-65 Optics

3 The (mostly) ALL NEW S-17 Reference Model Featuring TMA-65 Optics New Secondary metering structure New Lightweighted Mirrors, with FEA Cassegrain shutter

4 The (mostly) ALL NEW S-17 Reference Model Featuring TMA-65 Optics New Secondary metering structure New Lightweighted Mirrors, with FEA Cassegrain shutter New Inner and Outer Baffles, With FEA. New Lower Baffle enclosure, With FEA

5 The (mostly) ALL NEW S-17 Reference Model Featuring TMA-65 Optics New Secondary metering structure New Lightweighted Mirrors, with FEA Cassegrain shutter New Inner and Outer Baffles, With FEA. New Lower Baffle enclosure, With FEA. Radiator and side Baffles for L2 Orbit Spacecraft, 8 tank capacity, for L2 Orbit

6 The S-17 Model is built around Mike Lampton’s TMA-65 Ray Trace Model.

7 This model has a Cassegrain Mask which shapes the “useable light” Beam Envelope.

8 The S-17 Model is built around Mike Lampton’s TMA-65 Ray Trace Model. This model has a Cassegrain Mask which shapes the “useable light” Beam Envelope. This model also has all new Mirrors with lightweighting and FEA by Bobby Besuner. All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror

9 The S-17 Model is built around Mike Lampton’s TMA-65 Ray Trace Model. This model has a Cassegrain Mask which shapes the “useable light” Beam Envelope. This model also has all new Mirrors with lightweighting and FEA by Bobby Besuner. All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror New Focal Plane mounts and heat shield Assembly Note: The Focal Plane Assembly has undergone significant redesign and is not included in this model yet. Matt Hoff presented details two weeks ago and is nearly ready to install the new Focal Plane Assy in this Model.

10 The S-17 Model is built around Mike Lampton’s TMA-65 Ray Trace Model. This model has a Cassegrain Mask which shapes the “useable light” Beam Envelope. This model also has all new Mirrors with lightweighting and FEA by Bobby Besuner. All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror New Focal Plane mounts and heat shield Assembly New “dog house” lower optical bench enclosure

11 All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror New Focal Plane mounts and heat shield Assembly New “dog house” lower optical bench enclosure New secondary Metering Structure

12 All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror New Focal Plane mounts and heat shield Assembly New “dog house” lower optical bench enclosure New secondary Metering Structure New Lower Baffle enclosure

13 All new Secondary Mirror Assembly Silicon Carbide Fold-flat Mirror New Focal Plane mounts and heat shield Assembly New “dog house” lower optical bench enclosure New secondary Metering Structure New Lower Baffle enclosure New Spacecraft with 8 tank capacity. Suitable for L2 Orbit

14 New Lower Baffle enclosure New Spacecraft with 8 tank capacity. Suitable for L2 Orbit New Inner and Outer Baffles

15 New Spacecraft with 8 tank capacity. Suitable for L2 Orbit New Radiator Assembly including side shields for L2 Orbit. New Lower Baffle enclosure New Inner and Outer Baffles

16 New Spacecraft with 8 tank capacity. Suitable for L2 Orbit New Radiator Assembly including side shields for L2 Orbit. New Lower Baffle enclosure New Inner and Outer Baffles Same old PAF. Needs updating.

17 Unresolved issues, work-in-progress, and leftover details: Focal Plane Assembly is a work-in-progress and details are NOT included in this model, but will be very soon. May need rework around the Radiator interface. Cassegrain shutter is being reworked and will be in the model in a few days. Inner Baffle (Sholl baffle) may need thermal isolation and mount details. Cass shutter/Sholl baffle/Optical bench interface is unresolved. Telescope mount flexures are work-in-progress. Will be in the model soon. Optical bench table needs to be modified to accept Sholl baffle. Fold-flat needs a subframe. Star Trackers (Ball CT602) need to be moved. Again. Can we put them on the Spacecraft? PAF needs to be updated.