© Project ESIL Project ESIL 1ESIL Abstimmung- 12.09.2008 1 2009-10-20 Project ESIL European Sustainable Innovation License (for SME´s) 4 th Project Meeting.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Munich, 21. – 23. October 2005 Welcome to the UEMS Management Council Meeting 2005.
Module N° 1 Module N° 1 – Introduction to SSP Familiarization course.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
1..
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Network Security Workshop Dhaka, Bangladesh 09 – 11 November 2013 Proudly Supported by:
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Mail-merge and Contact Log Shaun Elliott – Business Consultant Enhance your knowledge, improve your organisation.
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Shiretoko Model Plans. Model Plan during Bear Activity Period (for groups of 20 or less) Alternative Course Day 1 12:40 Depart Utoro lunch location 12:50.
Agenda SwiNOG-6 09:00 – 09:30 Coffee and gipfeli 09:30 – 09:40 Welcome, Agenda, SwiNOG changes... 09:40 – 10:40 Open discussion „Filtering / Lawful interception“
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
TASK: Skill Development A proportional relationship is a set of equivalent ratios. Equivalent ratios have equal values using different numbers. Creating.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Presentation transcript:

© Project ESIL Project ESIL 1ESIL Abstimmung Project ESIL European Sustainable Innovation License (for SME´s) 4 th Project Meeting 21 st to 23 rd of October 2009 bit Training Center (room 110) Kärntner Strasse 311, 8054 Graz (A) Agenda Reworked (V 2.0)

© Project ESIL Project ESIL Schedule Day 1 ( ) 2 StartTopicRespon. Partner 10:00Arrival & WelcomeCPC 10:30Discussion Meeting Agenda Goals of the Meeting CPC Austria 10:45ESIL - Methods & Tools (1) TRIZ Introduction & Basis (Overview / 40 Principles & Matrix) insin (Horst N.) 13:00Lunchat bit-Restaurant 14:00ESIL - Methods & Tools (2) Innovation Excellence Modell & Blue Ocean Stenum (Jürgen J.) 15:30ESIL - Methods & Tools (3) Creativity & Innovation / The 4 Creativity Roles Stenum (Jürgen J.) 16:30ESIL - Methods & Tools (4) TRIZ Laws & Trends / S-Curves Stenum (Jürgen J.) insin (Horst N.) 17:30End of Day 1 18:30Graz-Tour & Dinner (Glöcklbräu)CPC / Stenum

© Project ESIL Project ESIL Schedule Day 2 ( ) 3 StartTopicRespon. Partner 09:00Start & Feedback Day 1CPC 09:30ESIL - Methods & Tools (5) Sustainability Concept & Principles Stenum (Hannes F.) 11:30ESIL - Methods & Tools (6) Creativity Techniques / Evalualtion Tools CPC (Wolfgang Sch.) Stenum (Hannes F.) 13:00Lunchat bit-Restaurant 14:00+) ESIL E-Learning Concept and Usability Bit (Martin K.) 15:00ESIL Curricula & Testing Consistency, Wording, Translations Stenum (Hannes F.) 16:00+) ESIL - Certification Certification & Business Model "ECDL" (guideline for ESIL ) +) ESIL – Certification Certification Scheme / Business Model Bit (Martin K.) CPC (Christoph H.) 18:30End of Day 2 - Free evening

© Project ESIL Project ESIL Schedule Day 3 ( ) 4 StartTopicRespon. Partner 09:00Start & Feedback Day 3CPC 09:30Discussion - "How does it fit together" & Decision Working Tasks (Structure Basis Module, Curricula, Testing, Certification, …) CPC / Stenum 11:00Working Session (in 3-4 groups)All 13:00Administrative Issues - Dissemination & Exploitation - Project Reports - Next Project Meeting - Summary of Meeting / to do - List CPC (Christoph H. & Wolfgang Sch.) 13:30Lunch End of the Meeting at bit-Restaurant