LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
SC Magnets at Fermilab New Collaring and Coil Pre-stress Limit for a Nb3Sn Magnet Alexander Zlobin Technical Division Fermilab.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
1 Letter of Rossi to Peggs (agred with Schmickler and Devred) April 2005  We strongly believe that the major steps in the near term are: 1)Construction.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
FCC Week 2015Design Options for 16 T LTS Dipoles – G. Sabbi 1 Overview of Magnet Design Options for LTS Dipoles in the 16 T Range GianLuca Sabbi, LBNL.
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Helical Solenoid Development
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
CERN, 11th November 2011 Hi-lumi meeting
TQ Program and Review Charge
Model magnet test results at FNAL
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
Glyn Kirby Magnet AssemblyTechniques.
To be presented at Nb3Al R&D Review,
the MDP High Field Dipole Demonstrator
New Magnets for the IR How far are we from the HL-LHC Target?
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Muon Collider SR and IR Magnets
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday, October 8, 2007

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets2 US Accelerator Research Program (LARP)  What is LARP ? US Accelerator Specialist to play role in LHC Accelerator, commissioning, operation and performance upgrades Fermilab AD/APC/TD play major role  Magnet LARP Motivation Existing 70 mm NbTi IR quads will likely be replaced after 4-7 years of operation to increase luminosity We want to play a major role with CERN in developing these magnets

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets3 IR Higher Luminosity Replacement Magnets  IR Environment (low , more interactions)  Wider beam profile, Larger G*dl, Higher energy deposition, More Radiation  Utilize Nb3Sn Superconductor  Improved Nb3Sn magnet technology  Improved Nb3Sn conductor  Rad Hardened structure  Implications for Magnet Design  Wider Aperture, Higher Gradient  Higher field on conductor, SC Temperature Margin, Rad Hardened Materials

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets4 Nb3Sn has been around for a while… Nb3Sn/NbTi on parallel path –Alternative for Isabelle –SSC development –LHC 4.2 K Nb3Sn vs. 1.9K NbTi Nb3Sn Tape BNL W. B. Sampson, circa 1967 NbTi Wins! 1990’s Generic R&D to push envelope Twente, LBNL, achieve up to T One of a kind magnets 21st Century, Nb3Sn revisited for future VLHC, LHC upgrade –Conductor improvements in Nb3Sn vs. Field limitations in NbTi –Several participants by now... BNL, FNAL, LBNL,TAMU, CEA, Twente, KEK –10’s of 1 meter models magnets successfully built, mostly in the US…. But never used in an actual accelerator

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets5 LARP 2009 Challenge “Demonstrate that Nb 3 Sn magnets are a viable choice for an LHC IR upgrade”  Technological Quadrupoles (TQ) for performance reproducibility 1 m long, 90 mm aperture Cos(2  ), G nom > 200 T/m, B coil > 12T  Scale up to 4 meter long (LQ) TQs-like cross section and mechanical structure, + experience from two long magnet intermediate studies Milestone set in agreement with CERN  High gradient quadrupoles (HQ) to explore performance limits 1 m long, 90+ mm aperture, G nom > 250 T/m, B coil > 15 T

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets6 Technological Quadrupoles Two mechanical designs are under development Same coils / Aperture = 90 mm / Gradient > K 2 layers Filler Keys 4 pads Bladder Yoke Aluminum shell TQC: using collars Collar laminations from LHC-IR quads 1 st time applied to Nb 3 Sn coils TQS: using Al-shell Pre-loaded by bladders and keys 1 st time applied to shell-type coils LBNL: concept, design, development, coils co-fabric., assembly & test FNAL: concept, design, development, coils co-fabric., assembly & test FNAL: coils co-fabric, test at 1.9K LBNL: coils co-fabric

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets7 Recent TQ Test Results at Fermilab TQE02: Build a TQC magnet with TQS02 coils Direct comparison of mechanical structures To be tested early Oct (this week!) TQC01b training history TQC01b (Collar structure): Re-assembly of TQC01 with 2 TQS coils 85% ssl at 4.5 K 89% at 1.9 K Reached G = 200 T/m  Improvement over TQC01 in understanding and process control TQS02 (Shell Structure): with next generation RRP 54/61 conductor, assembled at LBNL reached ~215 T/m at 4.5 K, little improvement at 1.9K TQS02a training history 4.5K 1.9K 4.5K

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets8 Plan for Length Scale-Up LENGTH SCALE-UP CHALLENGE: No Nb 3 Sn accelerator magnet longer than 1m has ever been built LARP should make a successful 4m long quadrupole by end of 09 Design Inputs to LQ: TQ results and design studies Long mirror 2 m/4 m Nb3sn Cos (  ) Dipole with COLLAR structure Long race track 4 m Nb3Sn Racetrack coil with SHELL Structure Scale up quad (LQ) will be a 4 meter longer version of the TQ with TQS, TQC or hybrid structure

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets9 LARP Long Racetrack The goals of the Long Racetrack (LR): fabricate and test long Nb 3 Sn racetrack coils test an Al-shell-based supporting structure (preloaded using bladders and keys) From 0.3 m to 3.6 m Reported in Sept 7, 2007 Fermilab Today Results: - I q > 90% ssl LBNL Designed BNL Built/tested

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets10 FNAL Long Mirror This magnet is a base program contribution in support of LARP FNAL “Mirror magnet” is a Nb3Sn cos(  ) dipole where a coil is substituted by iron blocks. Long cos(  ) coils fabrication/reaction and collar mechanics prior to LQ Front view of mirror magnet SSL Successful 2m mirror magnet test in May m mirror magnet will be tested in November LM02 quench history at 4.5K compared with 1m model

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets11 LQ Status/Future Plans We are developing a plan whose goal is to produce 2 4- meter long LQ’s by the end of CY 2009 Program leader for LQ has been chosen (Giorgio Ambrosio) Program will involve all three participating LARP Magnet Labs Major issue to be decided is the mechanical structure There will be an external review of the LQ program in late November

All Exp. Meeting - 08 Oct 07Michael Lamm on LARP Magnets12 LARP Magnet Status 1)Several TQ Magnets have been built. All of them work well. Performance improves with successive rebuilt due to increased understand of mechanics and coil fabrication. 2)Scaleup to 4 meters is underway. 4 meter long racetrack and 2 meter long mirror dipole (4 meter test soon) LQ plan for 4 meter long cos(  ) underway 3)Beyond LQ several LARP activities toward final goal of Nb3Sn accelerator magnets (local leaders) 1)Conductor Studies for higher Jc better conductor stability (Barzi) 2)Join AP/Magnet IR studies (Zlobin) 3)HQ quad model program (project leaders at LBNL but with contributions from Fermilab on magnetic design for e.g.) 4)1.9K Test facility and instrumentation upgrades