LIGO-G010293-00-M LIGO Status Report Barry Barish LSC Meeting - Hanford 14 Aug 01.

Slides:



Advertisements
Similar presentations
Peter Griffith and Megan McGroddy 4 th NACP All Investigators Meeting February 3, 2013 Expectations and Opportunities for NACP Investigators to Share and.
Advertisements

LIGO-G M Advanced LIGO Construction Proposal Submission Gary Sanders LIGO Laboratory PAC 12 June 2002, Cambridge.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Annual Review 30 April 2001 Caltech.
1 Science Opportunities for Australia Advanced LIGO Barry Barish Director, LIGO Canberra, Australia 16-Sept-03 LIGO-G M.
LIGO- G W LIGO Update by Fred Raab Local Educators Network LIGO Hanford Observatory October 27, 2005.
LIGO-G M PAC / LLO5-Dec-02 LIGO Overview Barry Barish PAC - LLO 5-Dec-02.
LIGO Status and Plans Barry Barish / Gary Sanders 13-May-02
Status of the LIGO Project
Laser Interferometer Gravitational-Wave Observatory Who? Presented By: Bonnie Wooley.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LIGO-G M LIGO Status and Plans Barry Barish LSC Meeting 19-Aug-02.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors David Shoemaker NSF Operations Review Hanford, 26 February 2001.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M GWIC16-Dec-02 LIGO Status Barry Barish GWIC 16-Dec-02.
Overview Ground-based Interferometers Barry Barish Caltech Amaldi-6 20-June-05.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
GEO-LIGO data analysis M.Alessandra Papa Max Planck Inst. f. Gravitationsphysik, Potsdam, Germany G Z VESF foundation meeting, Pisa, Dec
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
LIGO-G M Status of LIGO Gary Sanders LIGO Laboratory PAC-12 Meeting, June 2002 Cambridge.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
LIGO-G D “First Lock” for the LIGO Detectors 20 October 2000 LIGO Hanford Observatory Stan Whitcomb.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
CARRUTHERS LSC 3/20/06 1 LIGO-G M The View from NSF Tom Carruthers LIGO Program Officer National Science Foundation (703)
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
LIGO-G Z LIGO at the start of continuous observation Prospects and Challenges Albert Lazzarini LIGO Scientific Collaboration Presentation at NSF.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
Initial and Advanced LIGO Detectors
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LSC - Hanford, WA 19–22 August 2002 The View from NSF GP Funding FY 2002 NSF Funding Prospects FY 2003 Funding Opportunities for GWP Some Areas of Special.
DECIGO – Japanese Space Gravitational Wave Detector International Workshop on GPS Meteorology January 17, Tsukuba Center for Institutes Seiji Kawamura*
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
G R LIGO Laboratory1 The Future - How to make a next generation LIGO David Shoemaker, MIT AAAS Annual Meeting 17 February 2003.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LSC Meeting LIGO Scientific Collaboration - University of Wisconsin - Milwaukee 1 Software Coordinator Report Alan Wiseman LIGO-G Z.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G Z The LIGO Scientific Collaboration Peter R. Saulson NSB Site Visit LIGO Livingston Observatory 4 February 2004.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LIGO-G D Detector Installation and Commissioning Stan Whitcomb NSF Operations Review 26 February 2001 LIGO Hanford Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO - G M LIGO Laboratory and LSC Background on Major Collaborative Efforts Gary Sanders LIGO Lyon Virgo-LIGO Discussion 8 January 2001.
LIGO-G M LIGO Overview Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
The Status of Advanced LIGO: Light at the end of the Tunnels Jeffrey S. Kissel, for the LIGO Scientific Collaboration April APS Meeting, Savannah, GA April.
LIGO-G E PAC9 Meeting LIGO Laboratory at Caltech 1 The LIGO I Science Run Data & Computing Group Operations Plan 9 th Meeting of the.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LIGO G M Intro to LIGO Seismic Isolation Pre-bid meeting Gary Sanders LIGO/Caltech Stanford, April 29, 2003.
LIGO-G M Press Conference Scientific Operation of LIGO Gary H Sanders Caltech (on behalf of a large team) APS April Meeting Philadelphia 6-April-03.
LIGO-G M Advanced LIGO Construction Proposal Submission Gary Sanders LIGO Laboratory LSC Meeting August 2002, Hanford.
LIGO G PLIGO Laboratory 1 Advanced LIGO The Next Generation Philip Lindquist, Caltech XXXVIII Moriond Conference Gravitational Waves and Experimental.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
LIGO-G M LIGO Overview PAC 14 DRAFT VERSION Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
LIGO-G M Managing LIGO: Lessons for a Collaboratory Gary Sanders LIGO/Caltech NEES Awardees Meeting NSF, December 19, 2001.
Page 1 Coles – Operating the Observatories PAC 9 Dec. 13, 2000 G L Operating the Observatories Mark Coles.
Is there a future for LIGO underground?
Installation and Commissioning Status Stan Whitcomb
Nergis Mavalvala MIT IAU214, August 2002
Stan Whitcomb LSC meeting Livingston 21 March 2005
Stan Whitcomb LSC meeting Hanford 15 August 2005
Update on Status of LIGO
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

LIGO-G M LIGO Status Report Barry Barish LSC Meeting - Hanford 14 Aug 01

LIGO-G M 2 LIGO Plans schedule 1996Construction Underway (mostly civil) 1997Facility Construction (vacuum system) 1998Interferometer Construction (complete facilities) 1999Construction Complete (interferometers in vacuum) 2000Detector Installation (commissioning subsystems) 2001 Commission Interferometers (first coincidences) 2002Sensitivity studies (initiate LIGO I Science Run) LIGO I data run (one year integrated data at h ~ ) 2006+Begin ‘advanced’ LIGO installation

LIGO-G M 3 LIGO laser  Nd:YAG  mm  Output power > 8W in TEM00 mode

LIGO-G M 4 Prestabilized Laser frequency noise  Simplification of beam path external to vacuum system eliminates peaks due to vibrations  Broadband noise better than spec in Hz region

LIGO-G M 5 Pre-stabilized Laser laboratory data vs e2e simulation

LIGO-G M 6 Interferometer locking Laser end test mass Light bounces back and forth along arms about 150 times input test mass Light is “recycled” about 50 times signal Requires test masses to be held in position to meter: “Locking the interferometer”

LIGO-G M 7 L Lock Acquisition data compared with e2e simulation

LIGO-G M 8 Detector Status  All in-vacuum installation complete »Continuing installation and commissioning of control systems  LHO 2 km interferometer »Locks in recycled configuration for ~1 hour times »Sensitivity ~ rms »Working to improve both  LLO 4 km interferometer »Locked as Michelson with F-P Arms »Problem with seismic noise at low frequencies  LHO 4 km interferometer »Commissioning just beginning

LIGO-G M 9 Hanford 2km Jan 01 Interferometer noise spectrum

LIGO-G M 10 Initial LIGO Sensitivity Goal  Strain sensitivity <3x /Hz 1/2 at 200 Hz Sensing Noise »Photon Shot Noise »Residual Gas Displacement Noise »Seismic motion »Thermal Noise »Radiation Pressure

LIGO-G M 11 Initial Detector Milestones

LIGO-G M 12 LIGO steps prior to science run  commissioning interferometer »robust locking »three interferometers »sensitivity »duty cycle  interleave engineering runs (LIGO Science Collaboration) »implement and test acquisition and analysis tools »characterization and diagnostics studies »reduced data sets »merging data streams »upper limits

LIGO-G M 13 LIGO Laboratory goals  Overall goals »Bring interferometers, and data acquisition and analysis capability rapidly to the ability to collect and analyze coincidence data to address the scientific goals of LIGO. »Initiate scientific running in 2002 interleaved with progressive noise and availability studies »Advance both the interferometer commissioning and the commissioning of our analysis capability in a mutually balanced manner »Milestone, for the use of engineering run data to exercise the complete analysis pipeline  Definitions: »Engineering runs (Ex): data taking runs that are primarily motivated by the Laboratory detector improvement program »Science runs (Sx): intended to produce a data product for the LSC with scientific goals and resulting in publications

LIGO-G M 14 LIGO Laboratory proposed run plan  “E6” run before the end of 2001 (December for two full weeks) »At least one interferometer at each observatory with at least one interferometer in full recycled configuration »Goal of significant locked coincidence data, but sensitivity not guaranteed »Laboratory responsibility, with participation open to LSC members in the LIGO I working groups. Data available to upper limits groups »Analysis goal: sensitivity curves (February), full analysis (April) »if not successful, repeat the E6 run in January 2002  S1 run - May »Prime purpose to carry out the first scientific searches »Joint responsibility of the Laboratory and the LSC »Sensitivity goal is a two site coincidence with 3 interferometers running and the achieved scientific reach (R = Volume x time) 10x better than E6  S2 run »At least 10x improvement in scientific reach beyond S1,following completion of S1 analysis  Interleaving of E and S runs with improved scientific reach until design sensitivity and reliability are obtained

LIGO-G M 15 Thu, 02 Aug 2001 Dear Barry and Rai, I regret that I won't be able to attend the LSC meeting this month.This is the only period available for a family holiday, and the family has seen little of me lately. The AEI is well represented, however, by Maria Alessandra and her team. I have not seen an agenda for the meeting but I hope that someone will give the general meeting details of the data-sharing MOU. In some of the upper limit groups there seems to be some confusion still about the use of GEO data taken simultaneously with E6, so I think we should encourage all the upper limit groups to integrate GEO data into their thinking and planning for the analysis. I think a clear presentation of the MOU would help. Maria Alessandra is well briefed by me to represent my point of view on this, and of course Jim Hough will be there if anyone needs a statement from one of our PIs. Hope you have a good meeting. Best regards Bernard LIGO - GEO data exchange

LIGO-G M 16 LIGO-M M/GEO-E Memorandum of Understanding Between the German/British Collaboration for the Detection of Gravitational Waves (GEO) And the Laser Interferometer Gravitational Wave Observatory (LIGO) Project June 15, 2001 The purpose of this Memorandum of Understanding is to establish and define the cooperation between the German/British Collaboration for the Detection of Gravitational Waves (GEO) and the Laser Interferometer Gravitational Wave Observatory (LIGO) Project in respect of the operation of their detectors, the sharing of data, the joint analysis of data, and the dissemination of results of that analysis. Both parties to this agreement share the joint goals of observing gravitational radiation and of using gravitational radiation as an astrophysical probe. This agreement is intended to assist in the realization of these joint goals. The two parties already have a Memorandum of Agreement dated August 15, 1997 (LIGO -M M). The present MOU strengthens the cooperation established by the previous one and does not replace it. LIGO - GEO data exchange

LIGO-G M 17 Addendum A to the Memorandum of Understanding (LIGO M M/ GEO-E ) Between the GEO 600 Gravitational Wave Collaboration and the Laser Interferometer Gravitational Wave Observatory (LIGO) Laboratory 15 June 2001 This Attachment to the Memorandum of Understanding LIGO M M/ GEO- E describes the operation of the LIGO-GEO data exchange agreement. It applies to data acquired by either Project from the effective date of the agreement. The agreement shall remain in force until one or the other party withdraws from it or a revised agreement is adopted. LIGO - GEO data exchange

LIGO-G M 18 LIGO - GEO data exchange 1. All provisions of this attachment are reciprocal. Any provision for the treatment of GEO data by LIGO applies equally to the treatment of LIGO data by GEO. Responsibility for operation of the exchange lies with the LIGO Director on the one hand and the GEO Principal Investigator for Data Analysis on the other. In general, both projects agree that they will endeavor to distribute, analyze, and ensure the security of data received from the other project in the same way as their own.

LIGO-G M 19 LIGO - GEO data exchange 2. The word “data” refers to any experimental data recorded from any detector and its associated monitoring systems. The term “reduced data set” refers to a data product that includes a calibrated data stream suitable for analysis for gravitational wave signals. The exact format of the reduced data set will be agreed upon from time to time by LIGO and GEO

LIGO-G M Members of LIGO Laboratory and of the LIGO Science Collaboration (LSC) named in Attachment 1 have the right to access the full GEO data set, and members of GEO and GEO Associate Scientists named in Attachment 2 will have the right to access the full LIGO data set. The projects will maintain a joint public list of scientists who access either data set, listing the data accessed and the purpose of the investigation. Investigators should normally analyze data of comparable sensitivity from all detectors of the two projects that were recording data during the period covered by their investigation, in order to arrive at a result with maximum confidence. Scientists will submit 6-monthly reports on the progress of their work to their Project. LIGO and GEO will each make 6-monthly reports to the other on the use of the other project’s data. Any publication of results from this data will be subject to the provisions of paragraph 6 below. LIGO - GEO data exchange

LIGO-G M LIGO and GEO agree to exchange reduced data sets on a continual basis. Each project will make the reduced data set from the other project available to its own scientists and collaborators from its own data archive. LIGO and GEO will ensure maximum reasonable compatibility between data formats in order to facilitate analysis. Through the LIGO Scientific Collaboration( LSC) LIGO and GEO will encourage maximum cooperation between members of each Project on data analysis. LIGO - GEO data exchange

LIGO-G M LIGO and GEO will cooperate to the best of their abilities on scheduling observations, with the aim to ensure that at any time at least two independent detectors are operating with good sensitivity in full-bandwidth mode. Planned periods of data recording will be discussed and coordinated by representatives appointed by the Director of LIGO and the Principal Investigators of GEO. LIGO - GEO data exchange

LIGO-G M Any form of dissemination of the results of the analysis of the data covered by this agreement to persons outside the projects may be made only with the permission of both the Director of LIGO and the GEO Principal Investigator for Data Analysis. Scientific publications describing such results will be jointly authored by individuals identified by each Project. Any press releases based on the analysis of data under this agreement will be issued jointly and simultaneously by LIGO and GEO. LIGO - GEO data exchange

LIGO-G M 24 Future Operations Proposal Budget FY 2001 ($M) FY 2002 ($M) FY 2003 ($M) FY 2004 ($M) FY 2005 ($M) FY 2006 ($M) Total ($M) Currently funded Operations Increase for Full Operations Advanced R&D R&D Equipment for LSC Research Total Budgets FY 2001 currently funded Operations ($19.1M for ten months) is normalized to 12 months and provided for comparison only and is not included in totals.

LIGO-G M 25 Future Operations Proposal (cont.) FY 2001 funding normalized to 12 months shown for comparison Current Funding

LIGO-G M 26 Summary and News  Commissioning in progress »Emphasis on making three robust fully operational interferometers »E6 run in December »Sensitivity studies and improvements »S1 run in May  LIGO I Program »Series of MDCs for LDAS underway »Preparations of Upper Limit Groups  Awards »LIGO Operations funding FY02+ (5 years) approved by NSF ($160M) »Penn State awarded PFC (S Finn) »iVDGL funded – LIGO tier 2 centers at UWM and Penn State  Advanced LIGO – preparations and plans (Sanders)