Project Planning with PERT and CPM Chapter 14

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
Chapter 18 If mathematical analysis is too difficult, we can try each possibility out on paper. That way we can find which alternative appears to work.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
pert and cpm ch 9 Learning objectives:
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
1 Chapter 7 My interest is in the future because I am going to spend the rest of my life there.— Charles F. Kettering Forecasting.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
MGMT 483 Week 8 Scheduling.
Project Scheduling: Networks, Duration Estimation, and Critical Path
In the name of Allah the Most Gracious the Most Merciful.
Project Management Techniques.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Project Management OPIM 310-Lecture.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Management CPM, PERT, Crashing – An Illustrative Example
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Network Problem CPM & PERT
“WHY ARE PROJECTS ALWAYS LATE?” (“and what can the Project Manager DO about that?) Craig Henderson, MBA, PMP ARVEST Bank Operations.
1 Chapter 11 A number of important scheduling problems... require the study of an astronomical number of arrangements to determine which one is best....
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Transportation and Assignment Problems
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Example 5.10 Project Scheduling Models | 5.2 | 5.3 | 5.4 | 5.5 | 5.6 | 5.7 | 5.8 | 5.9 | 5.10a a Background Information.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
1 Chapter 13 Mathematical models of networks give us algorithms so computationally efficient that we can employ them to evaluate problems too big to be.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
PERT CPM assumes duration of activity is known with certainty.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT and CPM.
Project Planning & Scheduling
Project Management and scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Decision making and Organization Management
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
Project Planning and Budgeting
Probabilistic Time Estimates
Project Scheduling: networks, duration estimation, and critical path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 16 – Project Management
General Foundry Example of PERT/CPM
Planning and Managing Projects
Presentation transcript:

Project Planning with PERT and CPM Chapter 14 A construction superintendent explained to his client the massive cost overruns. He told of concrete trucks arriving too soon and having to dump their loads; of having to re-pour the foundation because the gravel underlay had not been set; of having to cut many holes through the concrete floor pad because the pipes had been covered before being inspected. Everything happened as scheduled, the poor man lamented. “You should have used PERT,” the client admonished. Project Planning with PERT and CPM

The Importance of Time in Planning Projects may have uncertainty. Projects may take a long time. Activities must be scheduled.

Basic Concepts of PERT PERT has an activity orientation. An activity is an effort that consumes time and resources. The central focus of all analysis and procedures is the PERT Network. PERT ties together all project activities as predecessors and successors. Events are project milestones and serve as the logical glue (network nodes) for connecting activities (network arcs).

Project Activities in Constructing a House

PERT Network for Constructing a House

Earliest Possible Event Times (TE)

Finding TE Values

Latest Allowable Event Times (TL)

Finding TL Values

Critical Paths and Event Slack

Activity Scheduling Project activities need two scheduled times: the starting time and the finishing time. PERT finds early and late values for each. All are relative to time 0 for the project start. An activity’s early starting time equals the TE of its beginning event: ES = TE. An activity’s late finishing time equals the TL for its ending event: LF = TL. From those, 2 times are computed using the expected activity completion time t: Early finishing time: EF = ES + t. Late starting time: LS = LF - t.

Scheduling Parameters for Constructing a House The following apply. Scheduled times must fall between ES and LF and allow at least time t to complete.

activity slack = LS - ES = LF - EF The activity slack expresses the scheduling leeway for the activity. It is computed by: activity slack = LS - ES = LF - EF Critical activities have zero slack. These lie on a critical path. Event slack and activity slack measure different things and are only loosely related.

Using QuickQuant with PERT QuickQuant will construct a PERT network and evaluate it using only tabular data input.

Time Cost Tradeoffs It is possible to speed up a project by crashing some activities at extra cost. The following data apply. To reduce project time, speed up one or more activities on the critical path.

Time-Cost Tradeoffs By successively reducing project time by 1 day at lowest cost, these plans were found.

PERT Network for Plan 4

PERT Network for Plan 7

Probabilistic Analysis The activity completion times are really random variables and probabilities apply. They are well represented by the modified beta distribution. There are three time parameters: most likely m optimistic a pessimistic b The expected value or mean and variance are computed from: t = a + 4m + b s 2 (b - a)2 6 62

Single Path Probabilities The normal distribution represents probabilities for the duration T of a single path. Using the above, the mean and variance are computed. From them, probabilities may be found that T lies in any specified interval. Probabilities for the duration of the a priori critical path can be computed. WARNING: That will not represent the duration of the project itself. The m computed above understates expected project duration.

Probabilities for Time to Construct a House The following data apply.

Probabilities for Time to Construct a House The expected duration of the critical path a-b-d-e-i-k-l is: m = 5 + 2 + 12 + 10 + 1 + 3 + 9 = 42 days The variance for duration of that path is s 2 = .444+.444+7.111+1.000+0+.250+.444 = 9.693 and the standard deviation is the square root of the above s = 3.11 days Using 40 days, z = (40 – 42)/3.11 = -.64 and Pr[T > 40] = .5 + .2389 = .7389 This applies to the critical path, not to the project itself.

Single-Path Probabilities and QuickQuant QuickQuant provides a detailed probabilistic analysis of the critical path.

What’s Wrong with Single-Path Probabilities? Single path probabilities do not properly apply to the project itself because many paths might end up to be the longest. The critical path is one of many possibilities. Durations of all these paths are not independent random variables. To properly assess likelihoods for project duration, build the house (on paper) many times and see what happens. QuickQuant will do that. The procedure is called Monte Carlo simulation.

Simulating House Construction with PERT QuickQuant provided these simulation results.

Simulating House Construction with PERT The second QuickQuant screen tells us about unexpected longest paths. The a priori critical path was of longest duration only 437 times out of 500. In some projects, it may be longest as little as 1% of the time, or less.

PERT/CPM Evaluation for Home Construction Example (Figure 14-26) The activities on the critical path are given in column R (indicated by the word Yes). In this case they are a, b, d, e, I, k, and l. The length of the critical path is in cell N26. It is 42 in this example. The earliest event times are given in cells C25:M26

PERT/CPM Evaluation for Home Construction Example (Figure 14-26) 1. Enter the problem name in cell B3. 3. Enter data in the activity-event table. Put a -1 in the column where the activity starts and a +1 where the activity ends. All other entries in the row are blank. For example, cell C8 has a -1 because activity A starts with event 1 and cell D8 has a +1 because activity A ends with event 2. 2. Expand the table to accommodate the proper number of activities and events by inserting or deleting rows and columns. If rows are inserted, make sure to copy the formulas in columns O, P, Q, and R into these new rows.

PERT/CPM Evaluation for Home Construction Example (Figure 14-26 ) 4. Enter the activity durations in column N (cells N8:N22 in this example). 5. Click on Tools and then Solver to get the Solver Parameters dialog box shown next.

Solver Paramters Dialog Box (Figure 14-27) 1. Enter the project time, cell R26, in the Target Cell line, either with or without the $ signs. Solver Paramters Dialog Box (Figure 14-27) NOTE: Normally all these entries appear in the Solver Parameter dialog box so you only need to click on the Solve button. However, you should always check to make sure the entries are correct for the problem you are solving. 2. The Target Cell is to be minimized so click on Min in the Equal To line. 3. Enter the decision variables in the By Changing Cells line, C26:M26. 4. The constraints are entered in the Subject to Constraints box by using the Add Constraints dialog box shown next (obtained by clicking on the Add button). If a constraint needs to be changed, click on the Change button. The Change and Add Constraint dialog box function in the same manner.

The Add Constraints Dialog Box CEMCO: The Add Constraints Dialog Box Normally, all these entries already appear. You will need to use this dialog box only if you need to add a constraint. 1. Enter Q8:Q22 (or $Q$8::$Q$22) in the Cell Reference line. These are the differences between the earliest times at the ending and beginning nodes for each activity. 3. Enter the activity durations N8:N22 in the Constraint line (or =$N$8:$N$22). 4. Click the OK button. If you need to change a constraint, the Change Constraint dialog box functions just like this one. 2. Enter >= as the sign because the differences in ending and beginning earliest times cannot be less than the activity durations, given next in Step 3.

PERT/CPM Evaluation for Home Construction Example (Figure 14-26) 6. To find which activities are on the critical path (in column R) copy the portion of the Sensitivity Report titled "Constraints" and paste it into this spreadsheet so that the word Constraints is in cell N35 (for this example), as shown next. 7. If all the earliest event times are desired, run Solver once more using the sum of the earliest event times (cell R26) as the target cell.

Solver’s Sensitivity Report To get Solver’s Sensitivity Report, highlight Sensitivity Report in the Report box of the Solver Results dialog box before clicking the OK button.

Portion of Sensitivity Report Showing Critical Path (Figure 14-28) Column R shows the critical path: a 1 indicates the corresponding activity is on the critical path and a 0 that it is not.