Block Diagram MTB Board #1 PC LabVIEW Program #1 Config File #1 MTB Board #2 LabVIEW Program #2 Config File #2 Database SUB record for each channel. Other.

Slides:



Advertisements
Similar presentations
MIL/STD-1553B Bus Overview J. Frederick Bartlett Fermilab June 3, 1999.
Advertisements

Make This work with EPICS! 2006
PROGRAMMABLE PERIPHERAL INTERFACE -8255
Multiplexer. A multiplexer (MUX) is a device which selects one of many inputs to a single output. The selection is done by using an input address. Hence,
EPICS Base R and beyond Andrew Johnson Computer Scientist, AES Controls Group.
Programmable Interval Timer
External Interrupt Module MTT EXTERNAL INTERRUPT REQUEST MODULE (IRQ)
SNS Integrated Control System Running IOC Core on Windows and Linux Dave Thompson Wim Blokland Ernest Williams.
Local Trigger Control Unit prototype
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
OPC Overview OPC Device Support (PLC Gateway for 3.14) Ralph Lange – EPICS Collaboration Meeting at SLAC, April 2005.
14 Nov 2000G3/FlexIO/PLC5/VSIOD8 Carl Lionberger 1 EPICS Support for G3/FlexIO/PLC5/VSIOD8 Carl Lionberger Group3™ optical-fiber-connected I/O AB FlexIO™
Dirk Zimoch, EPICS Meeting April 2007, Hamburg Siemens S7 PLC Communication.
EPICS support for ControlLogix via EtherNet/IP Kay-Uwe Kasemir, LANL May 2001.
Ether_ip - EPICS EtherNet/IP support for ControlLogix Kay-Uwe Kasemir, LANL Nov
Managed by UT-Battelle for the Department of Energy Kay Kasemir Sept EPICS EtherIP Driver.
Stanford Linear Accelerator Center Next Linear Collider Test Accelerator EPICS Support S. Allison, R. Chestnut, M. Clausen, K. Luchini.
NS Training Hardware. System Controller Module.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
EPICS Collaboration meeting Fall 2012, SDD status and plansPage 1 Self-Described Data - SDD status and plans Lana Abadie, ITER CODAC.
Dirk Zimoch, KSTAR Meeting 2009 Auto Save and Restore.
1 1999/Ph 514: State Notation Language EPICS State Notation Language (SNL) Ned D. Arnold APS.
Chapter 10: Input / Output Devices Dr Mohamed Menacer Taibah University
8254 Counter/Timer Counter Each of the three counter has 3 pins associated CLK: input clock frequency- 8 MHz OUT GATE: Enable (high) or disable.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
System Clocks.
Simple Mail Transfer Protocol (SMTP)
8 May 2001EPICS Group3 Carl Lionberger1 EPICS Support for Group3 Control System Carl Lionberger Group3™ optical-fiber-connected I/O Software and operational.
1 Experimental Physics and Industrial Control System (EPICS) Database Bob Dalesio, May 31,2010.
Experimental Physics and Industrial Control System (EPICS) Database Bob Dalesio, June 27,2001.
Visual Basic for Applications The Datapump Board Jamieson Olsen.
VLBA Software Group Meeting RBDE Control via VSI-S Interface Miguel Guerra National Radio Astronomy Observatory (Socorro, NM) 2010 January 12.
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Feb Material copied from the IOC Application Developer's.
1 1999/Ph 514: EPICS Database II EPICS EPICS Database II Ned D. Arnold APS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
7-6 단일 레지스터에서 Microoperation Multiplexer-Based Transfer  Register 가 서로 다른 시간에 둘 이상의 source 에서 data 를 받을 경우 If (K1=1) then (R0 ←R1) else if (K2=1) then.
Experience Running Embedded EPICS on NI CompactRIO Eric Björklund Dolores Baros Scott Baily.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Integrating EPICS and LabVIEW on Windows using DCOM Freddie Akeroyd ISIS Computing Group.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
Control System Overview J. Frederick Bartlett Fermilab June 1,1999.
Connecting EPICS with Easily Reconfigurable I/O Hardware EPICS Collaboration Meeting Fall 2011.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
The labjack. WHAT IS A LABJACK? An interface box that allows a computer to interact with the real world by collecting data and passing out instructions.
Computer Operating Properly Module MTT COMPUTER OPERATING PROPERLY MODULE (COP)
EPICS Records J. Frederick Bartlett Fermilab June 1,1999.
Control System Overview J. Frederick Bartlett Fermilab June 1,1999.
Controls Group New Channel Access Nameserver Presented by Karen White for Joan Sage.
Channel Access Security 2006 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Channel Access Security  The IOC Application.
TV Remote As A Wireless Mouse For PC.
Programmable Interval Timer
Programmable Interval Timer
Sheng-Li Liu, James Pinfold. University of Alberta
Status of Fast Controller EPICS Supports for ITER Project
LCLS Event System - Software
Timers.
NA61 - Single Computer DAQ !
asyn Driver Tutorial Measurement Computing 1608GX-2A0
8259 Programmable Interrupt Controller
Next Linear Collider Test Accelerator and EPICS
Reference Chapter 7 Moris Mano 4th Edition
Presentation transcript:

Block Diagram MTB Board #1 PC LabVIEW Program #1 Config File #1 MTB Board #2 LabVIEW Program #2 Config File #2 Database SUB record for each channel. Other records linked with SUB record. IOC CA Client (medm) Control SUB record and linked records. Reboot File PC 12JAN04 PS

MTBeddtg Control Record Arrangement MBBO record to select Event Code MBBO Direct record to mux Trigger Inputs select Delay Time select TG Gate Duration Enable Facility Clock events Enable Trigger_A Enable Trigger_B B INPI C INPA VAL INPD Enable Retrigger (optional AO record) Load MTB Channel Enable/Disable a channel Send Self-Test Event MBBO record to select Self Test Event Code. SUB Record using ce_MTBeddtg subroutine (optionally use BO records) 12JAN04 PS 5 sec B0 B1 B2 B3 MBBO record to select Personality INPE INPG INPJ Arm module INPH INPF Rising-edge sensitive command 1=Enable 1=Issue Code Now 1=Arm 5 sec Rising-edge sensitive command 1=Enable 1=LOAD Channel Now Composite Control Word Read by LabVIEW

MTBstatus Record Arrangement Status Word #1 from LabVIEW VAL INPA Channel Personality G Board number H Channel number I Number of MTB boards in PC J Program Operation Status K Watchdog Counter F Last Event Code Received SUB Record using ce_MTBstatus subroutine 12JAN04 PS Status Word #2 from LabVIEW INPB MBBI record to show Event Code show Delay Time C D show TG Gate Duration E MBBI Direct record to demux Status bits Channel Enabled EDD Delay Active TG Gate Active Facility Clock Events Enabled Trig_A Enabled Channel Retrigger mode. Trig_B Enabled Module Armed Facility Clock Health Interface Board Connection (optional AI record) (optionally use BI records) B0 B1 B2 B3 B4 B5 B6 B7 B8 B9 Monitored Delay Time from LabVIEW Monitored Gate Duration from LabVIEW