Proposal to use electromagnetic correction coils for RT trajectory correction.

Slides:



Advertisements
Similar presentations
Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
StaFF: Motion Stabilization with Nano-Meter Precision Proposed experiment conducted within framework of StaFF (Stabilization of Final Focus for ILC). Funded.
Wrap-up 20 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
Alignment and Beam Stability
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Extending FETS with a Ring Electron models are not sufficient for simulating the beam.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
CLIC potential baseline changes CTC items H. Schmickler, G. Riddone
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
HS, CTC Progress on beam-feedback? Proposal to study electromagnetic correction coils for the September 2009 module review.
Hybrid Synchrotron Arc: 2 Dipoles per Half Cell J. Scott Berg Advanced Accelerator Group Meeting 28 July 2011.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
What did we learn from TTF1 FEL? P. Castro (DESY).
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Sardana/IcePAP Based Control System for elliptically polarized Undulator at Max IV 30th Tango Collaboration meeting
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
Two-beam module layout
First evaluation of Dynamic Aperture at injection for FCC-hh
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Arc magnet designs Attilio Milanese 13 Oct. 2016
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Main magnets for PERLE Test Facility
HRS at small angles for e+/ e- pair for APEX
Beam-Based Alignment Results
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
IR Lattice with Detector Solenoid
Linac LLP Outline LINAC Long Lead Procurements
SCU Phase Shifter Meeting
Linear beam dynamics simulations for XFEL beam distribution system
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Proposal to use electromagnetic correction coils for RT trajectory correction

Proposal to use electromagnetic correction coils for RT trajectory correction HS, module review Sept 2009

HS, module review Background (1/2) 4000 MB quads, need about 80 correctors close to quads for beam-based feedback (BBF); Pre-choice of 80 locations impossible?  equip all 4000 quads with correctors Frequency range covered by BBF: sub-Hz to ~1 Hz In order to - have some feedback gain at f_cl =1 Hz (f_cl = f_s/gain) - to average over several BPM readings the BBF will run at a sampling frequency f_s=50 Hz; i.e. the corrections are applied every pulse: requested settling time of corrections is 5 ms ( in-between 2 beam pulses )

HS, module review Background (2/2) Technical implementation in 2008: - additional windings onto quad jokes in order to produce “a sort of dipole correction field” Pre-Choice of non-laminated MB quads for stabilization and mechanical engineering (late 2008) excludes correction coil (bandwidth problem) Present design approach: Extend dynamic range of stabilization actuators by 100 ! and make BBF corrections by displacing the MB quads. Fullscale = +- 5 um compared to +- 50nm

HS, module review Problems with present implementation Actuator dynamics, in particular for the (long) heavy magnets Absolute position of quad in beam reference frame not know (Hexapod design with sub-nm position readout in each leg) BPMs (50 nm required resolution) will move with quad. Needs sophisticated bookkeeping of past displacements. BPM close to “zero” and for longer elongations non- linear (monopole and quadrupole mode signals) Machine protection: non-energized position of quad (vertical) is max.down, not middle; might need interlocks.

HS, module review Implementation Required corrector strength (Bdl): 200 T/m *10 um * 2m 1.5 TeV) = 4 mT * m = 0,4 T * 1 cm -  very week magnet assumed strength: scales with length of Q   Q1: 0,1 mTm 1 cm long T magnets - end-field problems? - interference with quad field? - will create synchrotron radiation? (200 times higher bending radius)

HS, module review First sketch ( after discussion with Michele Modena and Alexey Vorozhtsov) BPM QUAD The present space reservation in the module integration includes the space for the coils. Close to the beampipe there is 2-3 cm free space Small window frame magnet or a variant with magnetic shielding towards the quad can go into that free space. Alexey will make a first design …

HS, module review Conclusions The presently proposed solution for high excursion piezo actuators for BBF and Stabilization will possibly work, but it has several known (and unknown) complications. A simple proposal of small electromagnets for the BBF will decouple BBF and stabilization. The stabilization equipment can then be optimized for its original task. Having positive answers to the questions of: - extra synchrotron light at high energies? (when) - a preliminary magnet design (1 month) this option should become our CDR baseline.