River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
February 24 – February 28, 2013 ♦ Phoenix, Arizona Session #110 Collaboration in Long-Term Stewardship at DOE’s Hanford Site - Abstract # *Rick Moren,
Prepare + Prevent + Respond + Recover + Mitigate Project Implementation 1.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
National Governors Association Meeting LM: Ensuring a Smooth Transition – Procedures and Examples June 21-22, 2005 Dave Geiser Office of Legacy Management.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF DOE POLICY -- USE OF INSTITUTIONAL CONTROLS COLLEEN OSTROWSKI (202)
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Gerald Whitney Operating Experience Program Coordinator Presented May 5, 2010 DOE OEC Workshop - SLAC National Accelerator Laboratory "Lessons from the.
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
ENVIRONMENTAL MANAGEMENT PLAN
Hanford Site: Long-term Stewardship Boyd Hathaway Realty Officer Department of Energy – Richland Operations Office Hanford Long-Term Stewardship (LTS)
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Click to edit Master title style Click to edit Master subtitle style PBC Lessons Learned A Contractor’s Perspective June 29, 2005 Tushar Talele ARCADIS.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Overview of the Proposed Draft B River Corridor Baseline Risk Assessment Report Public Workshop – January 10 & 11, 2008.
1 Asset Management Steering Committee Briefing on Senate Bill 408 (Access Management) August 2013 Harold Lasley, P.E. Access Management Program.
Project Life Cycle.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
U.S. Department of Agriculture eGovernment Program Prototype Weekly Status Meeting July 1, 2003.
QRTV for UN Regulation GRB 62 Transmitted by IWG QRTV for UN Regulation Informal document GRB (62nd GRB, 1-3 September 2015, agenda item 11)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
The Proposal Presented by RAR Consulting, LLC Copyright © 2011 RAR Consulting, LLC ● Benicia, California ● PH:
Project Management Processes for a Project
California Integrated Waste Management Board Board Meeting June 16, 2009 Item #8 Consideration Of Adoption Of The Recommendations To The Legislature In.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Project Management Process
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
The Certified Quality Process Handbook Chapter 6: Audits Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor and Chair Dept. of.
FINAL FINDING WRITEN AGREEMENT (REPOSITORY AGREEMENT)
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Middle Fork Project Relicensing Process Plan April 25, 2006.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
February 26 – March 1, 2012 ♦ Phoenix, Arizona Session # 90 Long–Term Stewardship at DOE’s Hanford Site Abstract #12575 Authors & Affiliation : Rick Moren:
Implementing Program Management Standards at Duke Energy.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Roles and Responsibilities (Tab 3). Roles and Responsibilities 2 At the end of this module, participants will be able to: Distinguish between the roles.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Rob Connatser NSS Instrument Work Packages and XLPM.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Bow Basin Watershed Management Plan Revised Terms of Reference
Chapter Five Project Planning.
Bradley Smith February 28, 2017
System Planning To Programming
Campus Master Plan.
Pre-Construction Services
Implementing the Transportation/Land Use Connection Program
Report to 178th WP.29 session from the 35th IWG on DETA meeting
Presentation transcript:

River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006

River Corridor Closure Project Safety People Results E _2 General Scoping Highlights Beginning of process to establish final cleanup decisions is… Key to shared success in the River Corridor

River Corridor Closure Project Safety People Results E _3 General Scoping Highlights Present strategy and alternatives Ensure integrated approach Identify challenges Provide foundation for discussions and pathway selection –Regulatory approval and pathway selection not required per scoping agreements –TPA change package and milestones to document agreements

River Corridor Closure Project Safety People Results E _4 Document Organization 1.0 Introduction 2.0 Status of Current Activities 3.0 Hanford Site Programs 4.0 Project Organization and Baseline 5.0 WCH Performance Plan 6.0 Potential Alternative Approaches 7.0 Issues and Challenges 8.0 Conclusions/Path Forward

River Corridor Closure Project Safety People Results E _5 WCH Performance Plan for Final Cleanup Decisions Objective: Lock-in final remedial action objectives and exposure scenario mid way through contract Integrated with but not dependent on groundwater schedule Acceleration and enhancement of selected scope items One proposed plan for all source operable units

River Corridor Closure Project Safety People Results E _6

River Corridor Closure Project Safety People Results E _7 Potential Alternatives Operable unit groupings based on anticipated schedules, exposure scenarios, and cleanup effectiveness Aspects may be dependent on other Hanford contractors

River Corridor Closure Project Safety People Results E _8 Issues and Challenges Source unit and GW schedule alignment Integration role assignment, authority, and budget Exposure scenarios and land use Modeling for residual conditions (dose and contaminant transport)

River Corridor Closure Project Safety People Results E _9 Key Schedule Items 6/6Meeting to discuss initial RL comments ~6/29Briefing with Regulators; Distribution of Review Copies 8/14All comments due 9/26Transmit final document