Doc.: IEEE 802.11-15/1171r0 SubmissionRich Kennedy, MediaTek Summary of FCC Administrative Changes Proposed in NPRM FCC 15-92 Date: 2015-09-17 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission July 2007 John Notor, Cadence Design Systems, Inc.Slide 1 Overview of FCC ET FNPRM ISM Band Spectrum.
Advertisements

METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Doc.: IEEE tvws Submission September 2009 Stanislav Filin et al, NICTSlide 1 Comments to WS coexistence draft PAR Notice: This document.
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
Page 1 Conflicts of Interest Peter Hughes IESBA December 2012 New York, USA.
ACB Module Assessment and Integration FCC and IC Michael Derby ACB Europe7 April
Health Insurance Portability Accountability Act of 1996 HIPAA for Researchers: IRB Related Issues HSC USC IRB.
An Overview of the Responsible Party’s Responsibility Following Part 68 Privatization.
5/9/2015TCB Council1 TCB Sharing of FCC KDBs Michael Derby TCB Council Chairman 9 th April 2014.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
American Certification Body - Your Online Resource for Regulatory Training 1588 ENERGYSTAR®
CIPA Update. FOR SCHOOLS – By July 1, 2012, amend your existing Internet safety policy (if you have not already done so) to provide for the education.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15C Report.
1 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Module Approval Explained 04/18/02 Jeffrey Schiffer.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 5: Security Controls.
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
1 Updates to Texas Administrative Code 1TAC 206 Jeff Kline, Statewide Accessibility Coordinator Texas Department of Information Resources February 8, 2012.
FCC Equipment Certification / Verification / Declaration of Conformity: What They Are & What Needs Work National Spectrum Management Association Mitchell.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Doc.: IEEE /1119r0 Submission November 2005 Alistair Buttar, MotorolaSlide 1 Support for Emergency Calls Notice: This document has been prepared.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Doc.: IEEE /1032r0 Agenda September 2015 Rich Kennedy, MediaTek IEEE /15 Regulatory SC DRAFT Teleconference Plan and Agenda Date:
Doc.: IEEE /1012r1 Agenda August 2015 Rich Kennedy, MediaTek IEEE /15 Regulatory SC Teleconference Plan and Agenda Date: Authors:
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Doc.: IEEE Submission March 2010 Dave Evans, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0099r0 Submission Sept Slide 1 Geo-location Database Issues of CEPT Date: Authors: Notice: This document has been.
Doc.: IEEE /xxxxr0 Submission November, 2006 Scott Henderson, Research In Motion FCC : E911 Requirements for IP- Enabled Service Providers.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of Certain 47 CFR Part.
Forced firmware lockdown? Christian
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of 47 CFR Part 68 Presented.
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
Doc.: IEEE /0027r0 Submission January 2006 Slide 1 WiNOT Consortium: Proposal for online enrollment cluster Notice: This document has been prepared.
4/26/2017 FCC Equipment Authorization Procedure and Updates or.. How the FCC plays with global markets Mike Violette, Director American Certification.
IEEE mban SubmissionSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:Resolution.
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
Doc.: IEEE /xxxxr0 July 2011 Padam Kafle, Nokia Submission Simplification of Enablement Procedure for TVWS Authors: Date: July 18, 2011 NameCompanyAddressPhone .
VETERANS HEALTH ADMINISTRATION SLIDE 0 New Requirements for VA ORD Investigators: Implementation of Data Management and Access Plans.
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
Doc.: IEEE /0448r0 Submission March, 2007 Srinivas SreemanthulaSlide 1 Joiint TGU : Emergency Identifiers Notice: This document has been.
Doc.: IEEE sru Submission 11 November 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0039r1 Submission January 2007 Larry Green, Ixia Slide 1 TCP Parameters and Settings Notice: This document has been prepared to assist.
17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.
Submission doc.: IEEE /0052r1 March 2016 Sho Furuichi, SonySlide 1 Supplemental document for text proposal on amendment to entity operations Date:
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
Administrative Code Amendment
Equipment Authorization Update
Premarket Notification 510(k) process
The E-Rate Program CIPA Update Fall 2011 Applicant Trainings.
Nov 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Resolution of PAR and 5C Comments for MBAN Study.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
P802.11aq Waiver request regarding IEEE RAC comments
P802.11aq Waiver request regarding IEEE RAC comments
Premised on a comprise, Part 68 rules mandated that:
Standards and Certification Training
TCP Parameters and Settings
Updates to Expedited Review Procedures
FCC Regulations and Multi-band Operation
TRTR Briefing September 2013
Subject Matter Eligibility
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC Comments Supporting MBANS ET Docket
February 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Initiative to enable to operate.
P802.11aq Waiver request regarding IEEE RAC comments
P802.11aq Waiver request regarding IEEE RAC comments
RR-TAG Liaison Report Mar07 IEEE
Location Presentation
Presentation transcript:

doc.: IEEE /1171r0 SubmissionRich Kennedy, MediaTek Summary of FCC Administrative Changes Proposed in NPRM FCC Date: Authors: September 2015 Slide 1

doc.: IEEE /1171r0 SubmissionRich Kennedy, MediaTek Abstract This presentation is a summary of the FCC proposed administrative changes to the radio equipment certification process. September 2015 Slide 2

doc.: IEEE /1171r0 Submission NPRM FCC Amendment of Parts 0, 1, 2, 15 and 18 of the Commission’s Rules regarding Authorization of Radiofrequency Equipment; and Request for the Allowance of Optional Electronic Labeling for Wireless Devices –ET Docket September 2015 Rich Kennedy, MediaTekSlide 3

doc.: IEEE /1171r0 Submission Intent of the Changes The Commission proposed to combine two separate product approval programs—Declaration of Conformity and verification—into one product self- approval program. It also proposed to revise and clarify the rules that govern equipment certification, including those specifying when device changes necessitate a new FCC ID. These revisions would codify the current practices related to certification of modular transmitters for licensed services as well as the filing requirements for RF devices that incorporate multiple certified modular transmitters. They would also replace requirements that apply only to devices specifically classified as “software defined radios” (SDRs) with broadly applicable rules, based in part on the current Commission practices regarding software control of radio parameters, and would eliminate restrictions on hardware modifications of SDR devices. September 2015 Rich Kennedy, MediaTekSlide 4

doc.: IEEE /1171r0 Submission Intent of the Changes [2] The Commission also proposed to codify procedures related to electronic labeling, streamline the rules for the measurement procedures that are used to demonstrate device compliance, and codify existing practices that protect the confidentiality of market-sensitive information. It proposed to eliminate unnecessary or duplicative rules and consolidate rules from various specific rule parts into the equipment authorization rules in part 2 of the Commission's rules and to discontinue the requirement that importers file information associated with FCC Form 740 with Customs and Border Protection for RF devices that are imported into the United States. Finally, the Commission sought comment on how to codify any filing or notification requirements that may be necessitated by the adoption of these proposals. September 2015 Rich Kennedy, MediaTekSlide 5

doc.: IEEE /1171r0 Submission Unifying Self-Approval Procedures Currently, RF devices must be authorized in accordance with one of three procedures specified in subpart J of part 2-certification, Declaration of Conformity (DoC), and verification. DoC and verification are self-approval procedures in which the responsible party is required to take specific actions to ensure that its equipment complies with the Commission's rules. Unlike certification, these procedures do not require submittal of an application to the FCC or a Telecommunication Certification Body (TCB) and do not require the explicit grant of certification. Under DoC, the responsible party must use a recognized accredited test laboratory when testing devices and include a compliance information statement with the product that identifies the product and a responsible party within the United States. Verification does not require the use of FCC-recognized test laboratories or the provision of a compliance information statement with the product. September 2015 Rich Kennedy, MediaTekSlide 6

doc.: IEEE /1171r0 Submission Unifying Self-Approval Procedures [2] A single process would simplify the equipment authorization requirements and reduce confusion as to which process may apply to any given device, while continuing to adequately ensure compliance with the rules, and sought comment on the proposed rule revisions. To incorporate certain elements of the existing Suppliers Declaration of Conformity (SDoC) process now used for Telephone Network Terminal Equipment into the new single process, which would apply to all equipment currently subject to the DoC and verification procedures. September 2015 Rich Kennedy, MediaTekSlide 7

doc.: IEEE /1171r0 Submission Updating Certification Procedures Modular Transmitters –Retain the concept of a “limited modular approval,” under which the manufacturer demonstrates in the certification application that the transmitter will comply with our rules only under specific circumstances. –Incorporate the part 15 rules and the guidance in KDB Publication for limited modular approvals into the revised part 2 rule. –No longer specify a unique RF exposure requirement for modular transmitters. –Eliminate the rule provision that permits authorization of modular transmitters that are “split” into the “radio front end” (the radio elements) and the “transmitter control element” (the hardware on which the software that controls the radio operation resides). September 2015 Rich Kennedy, MediaTekSlide 8

doc.: IEEE /1171r0 Submission Updating Certification Procedures [2] Modular Transmitters (cont’d) –Permit certification of modular transmitters that consist of a single chip which has been tested to demonstrate compliance in a typical installation provided that the grantee includes detailed instructions for integration into other RF devices (i.e. host devices) to ensure that the ultimate configuration is consistent with the significant parameters for which it was tested. Devices With Software-Based Capabilities –Simplify the rules by removing the SDR designation from grants of certification and incorporating any necessary requirements for software control of RF parameters and software security for all devices in the general certification rules and guidance, as current SDR rules have proven to be insufficiently flexible –Modify the SDR-related requirements in part 2 of its rules based in part on the current Commission practices regarding software configuration control. September 2015 Rich Kennedy, MediaTekSlide 9

doc.: IEEE /1171r0 Submission Updating Certification Procedures [3] Devices With Software-Based Capabilities (cont’d) –Grantees must implement well-defined measures to ensure that certified equipment is not capable of operating with RF-controlling software for which it has not been approved to minimize the potential for unauthorized modification to the software that controls the RF parameters of the device. Including all frequency bands, power levels, modulation types, or other modes of operation for which the device is designed to operate. –Grantees must specify which parties will be authorized to make software changes (e.g., the grantee, wireless service provider, other authorized parties) to prevent unauthorized parties from enabling different modes of operation. September 2015 Rich Kennedy, MediaTekSlide 10

doc.: IEEE /1171r0 Submission Changes to Certified Equipment Eliminate the Class III Permissive Change category (modifications to devices originally specifically certified as SDRs), as this category of devices has been eliminated. For Class II changes (as well as those approved as Class III prior to these changes), the grantee can file an abbreviated application for certification under the same FCC ID. Replace the “electrically identical” benchmark with a new standard that considers how the device differs from what was evaluated at the time of equipment certification and whether those differences could affect how the modified device complies with our rules. –Under current rules a device may add a completely new set of RF operating parameters from the already approved device and still be “electrically identical” under the rules and, thus, can be authorized under one FCC ID September 2015 Rich Kennedy, MediaTekSlide 11

doc.: IEEE /1171r0 Submission Changes to Certified Equipment [2] Changes in layout, included components, operating software, or variations in overall electrical or mechanical constructions that do not substantially change the overall function of the device do not require a new FCC ID. Continue to permit Class I permissive changes for those changes that do not degrade the device parameters normally reported in an equipment authorization application (including a decrease in the fundamental emissions that does not increase spurious emissions; an improved spurious emission performance; minor variations in the enclosure or components; and software changes that do not affect RF parameters). When the grantee adds capabilities through software changes it would be required to demonstrate the device controls that would prevent unauthorized software modifications by filing an application for certification, as a permissive change, under the same FCC ID. September 2015 Rich Kennedy, MediaTekSlide 12

doc.: IEEE /1171r0 Submission Changes to Certified Equipment [3] A grantee of a certified modular transmitter that wants to use the transmitter in a manner for which it has not been approved, the grantee would have to also obtain a new grant of certification under the same FCC ID by filing an application with data that demonstrates compliance with all pertinent technical standards. Permit a group of devices that are essentially similar, based upon the overall design of the devices, their functions, components and layout, to be authorized as a “family of products” under the same FCC ID without having to obtain distinct approval from a TCB for each device. revise § and remove the “electrically identical” definition from § of the rules, and to add rules that address the modular transmitters, software- defined radio, and device change matters outlined above. September 2015 Rich Kennedy, MediaTekSlide 13

doc.: IEEE /1171r0 Submission Responsible Parties for Certified Equipment General –The grantee of certification is responsible for the compliance of the certified equipment. When another party modifies a device through either hardware or software changes without the authority of the original grantee, or incorporates a certified device into another host device, that party becomes responsible for the modified device's compliance and must obtain a new FCC ID for its product –When a party other than the grantee of certification modifies a device under the authority of the original grantee, the party must obtain a new certification under either the original FCC ID with the original grantee's approval, or with a new FCC ID. End Products Incorporating Certified Modular Transmitters –Continue to apply the general principle that a party that creates an end product is responsible for the compliance of the end product it creates, and to establish rules for two general scenarios involving end products that incorporate certified modular transmitters. September 2015 Rich Kennedy, MediaTekSlide 14

doc.: IEEE /1171r0 Submission Responsible Parties for Certified Equipment [2] Modification of Certified Equipment by Third Parties –To revise § 2.909(d), which allows a new party that performs device modifications without the consent of the original grantee to become responsible for the compliance by labeling the device with a statement indicating it was modified, with the requirement that the party obtain a new grant of certification. It would have to specify a new FCC ID unless the consent of the original is obtained. Repaired and Refurbished Devices –to formally adopt its current practice whereby a third party that repairs or refurbishes certified equipment to the device's original specification does not need to submit an application for certification if the equipment continues to operate as specified in its current grant. September 2015 Rich Kennedy, MediaTekSlide 15

doc.: IEEE /1171r0 Submission Responsible Parties for Certified Equipment [3] Imported Equipment –To require that all applications for certification include the contact information of a party located in the United States that is responsible for compliance, and asked whether there were other options (including rules amendments) that would provide it with jurisdiction over the party responsible for the compliance of the equipment. September 2015 Rich Kennedy, MediaTekSlide 16

doc.: IEEE /1171r0 Submission Information Included With Applications for Certification To streamline § of the rules by combining the duplicative information requirements listed in the two sections of the rule that list the information that must be included with applications for certification and reorganizing the information required only in specific rule parts or for specific types of operation into a more logical structure. September 2015 Rich Kennedy, MediaTekSlide 17

doc.: IEEE /1171r0 Submission Confidentiality of Certification Applications Short-term confidentiality allows for the preparation for marketing of devices without disclosure of sensitive information to the public prior to actual sale, and is typically requested for information that will become discoverable once sales commence and the product and its related literature can be physically examined—e.g. external photos, internal photos, and user manuals. To codify the short-term confidentiality procedure for the types of information described in the Commission's June 15, 2004 public notice, DA , concerning short-term confidentiality requests. It would grant short-term confidentiality upon the applicant's request for 45 days or an earlier date if specified by the applicant, which may be extended with serial requests to a maximum of 180 days. No need to provide a specific justification for its request. September 2015 Rich Kennedy, MediaTekSlide 18

doc.: IEEE /1171r0 Submission Updating Procedures Applicable to Both Certification and Self-Approval Labeling –to amend its regulations to comply with the provisions of the Enhance Labeling, Accessing, and Branding of Electronic Licenses Act (E-LABEL Act), which requires it to make regulations (or take other appropriate action) “to allow manufacturers of radiofrequency devices with display the option to use electronic labeling for the equipment in place of affixing physical labels to the equipment. –to codify the guidance in KDB Publication , which states that the FCC ID may be placed in the device user manual if the device is too small for the FCC ID to be readable (smaller than 4-6 point font size). September 2015 Rich Kennedy, MediaTekSlide 19

doc.: IEEE /1171r0 Submission Updating Procedures Applicable to Both Certification and Self-Approval [2] Labeling (cont’d) –To eliminate the requirement for part 15 devices to be labeled with the FCC logo, and observed that doing so would make a pending request by the Information Technology Industry Council (ITI) moot. Measurement Procedures –To modify § 2.947(a)(3) to specifically reference the advisory information available in its online KDB publications. –to consolidate references to measurement procedures into part 2, to the extent practicable, and asked if, until this consolidation can occur, it should further modify § to state that other rule parts may specify additional measurement procedures. September 2015 Rich Kennedy, MediaTekSlide 20

doc.: IEEE /1171r0 Submission Updating Procedures Applicable to Both Certification and Self-Approval [3] Measurement Procedures (cont’d) –To revise §§ 15.31, 15.32, 15.33, and 15.35; and the part 18 rules as described in § , with § in a manner that references procedures that will be published by OET as KDB Publications and to provide clarifying text. –Asked whether the measurement procedures specified in § 15.31(a)(3) and (4) (referencing ANSI C and ANSI C ) are sufficient to address compliance testing for devices subject to the part 15 requirements, such that it could remove specific measurement procedures in § –To modify § to clarify the measurement detector functions and bandwidth requirements and to replace an old reference to CISPR Publication 16 in § with an updated reference to the measurement instrumentation procedures in ANSI C September 2015 Rich Kennedy, MediaTekSlide 21

doc.: IEEE /1171r0 Submission Importation Rules Importation Declaration Modification of Customs Bonded Warehouse Requirement Increasing the Number of Trade Show Devices Excluded Devices Devices Imported for Personal Use September 2015 Rich Kennedy, MediaTekSlide 22