Accelerators and other things Roger Barlow Manchester Christmas Meeting 2005/6.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

EasyGrid: the job submission system that works! James Cunha Werner GridPP18 Meeting – University of Glasgow.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Welcome to Quark Net 2011 Wayne State University Physics Department.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Nailing Electroweak Physics (aka Higgs Hunting) with the Next Linear Collider Bob Wilson High Energy Physics Group CSU Physics Research Evening November.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
The B A B AR G RID demonstrator Tim Adye, Roger Barlow, Alessandra Forti, Andrew McNab, David Smith What is BaBar? The BaBar detector is a High Energy.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The Particle Physics Group 2005 and beyond. Slide2/23 Welcome Thorsten Rob Roger Un-ki Dave Paul (M) Adriana Yibiao Joseph Remi Krisztian Panis Colin.
Group Computing Strategy Introduction and BaBar Roger Barlow June 28 th 2005.
Fermilab GDE Simulation Kickoff meeting: Information for Simulations Wakefields Roger Barlow.
3rd Nov 2000HEPiX/HEPNT CDF-UK MINI-GRID Ian McArthur Oxford University, Physics Department
Linac Marx Modulator Update Trevor Butler 5/20/2015.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Pattern Recognition: Statistical and Neural Lonnie C. Ludeman Lecture 24 Nov 2, 2005 Nanjing University of Science & Technology.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Accelerators 2007 Wakefields and the nsFFAG Roger Barlow.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
BaBar and the Grid Roger Barlow Dave Bailey, Chris Brew, Giuliano Castelli, James Werner, Fergus Wilson and Will Roethel GridPP18 Glasgow March 20 th 2007.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
Developing Imaging Calorimeters for a SiD-Flavor Lepton Collider Jacob Smith Linear Collider Physics School Ambleside,England 2009.
ZPD Project Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Design Overview Progress and Changes since CDR Current Status Plans.
11th November 2002Tim Adye1 Distributed Analysis in the BaBar Experiment Tim Adye Particle Physics Department Rutherford Appleton Laboratory University.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
Collimation for the Linear Collider, Daresbury.1 Adam Mercer, German Kurevlev, Roger Barlow Simulation of Halo Collimation in BDS.
BaBarGrid UK Distributed Analysis Roger Barlow Montréal collaboration meeting June 22 nd 2006.
Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.
Mark Thomson University of Cambridge High Granularity Particle Flow Calorimetry.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Analysis Model Zhengyun You University of California Irvine Mu2e Computing Review March 5-6, 2015 Mu2e-doc-5227.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
1 The BbgUtils package Roger Barlow BaBarGrid Workshop Ferrara, 13 th July 2005.
Marcel Stanitzki Rutherford Appleton Laboratory
14.4. Readout systems for innovative calorimeters
Final CALICE OsC meeting: Status and summary of project
MICE Computing and Software
Test Beam Request for the Semi-Digital Hadronic Calorimeter
KEK news ( ) S.Tanaka.
CEPC 数字强子量能器读出电子学预研进展
Integration and alignment of ATLAS SCT
Tracker Software Status
Gridifying the LHCb Monte Carlo production system
WP4 Dave Bailey 5th May 2006.
Presentation transcript:

Accelerators and other things Roger Barlow Manchester Christmas Meeting 2005/6

Roger Barlow2 Accelerators: PEPII and TURTLE Poster at PAC05 Where do BaBar backgrounds come from?

Roger Barlow3 Wake Fields Beam particles passing through an aperture produce image charges and currents Image charges and currents push beam particles around Big concern for Linear Collider

Roger Barlow4 Wake fields Predict experimental results if 5 th order used

Roger Barlow5 More Wake Fields Circular Aperture:Kick on one particle due to another  (  m r m r’ m W m (s)Cos m  -  ’  ) Wake effect can be coded as  m (trailing particle)xAperture(s)x(Leading slice) What about rectangular aperture??

Roger Barlow6 BaBar splitoff software Try out simple implementation of Debbie Bard’s photon/splitoff Neural Net discriminator All cluster-pair masses (E>0.5 GeV) and those for which either has quality<0.5

Roger Barlow7 BaBar analysis  ±  3  ±  0 over to Tim – who promised a talk!

Roger Barlow8 BaBar Grid - utilities Wrapper for unmemorable ldap bash-2.05b$ BbgWho Names of BaBar VO members =========================== Artem Trunov Walter Toki Dr J A Nash Dominique Boutigny … bash-2.05b$ BbgWhere List of all sites available to the BaBar VO ====================================== gridce.sns.it: with 10 CPUs available gridba2.ba.infn.it: with 88 CPUs available ce3.egee.unile.it: with 3 CPUs available Grid10.fe.infn.it: with 20 CPUs available lcg-gridka-ce.fzk.de: with 1145 CPUs available ……………..

Roger Barlow9 BbgCERNUI Sets up the user interface even in a grid-free environment (e.g.SLAC) [noric08]~/analysis25 > grid-proxy-init grid-proxy-init: Command not found. [noric08]~/analysis25 > source BbgUtils/BbgCERNUI your operating system is sl3 your shell is tcsh [noric08]~/analysis25 > grid-proxy-init Your identity: /O=Grid/O=UKHEP/OU=hep.man.ac.uk/CN=Roger Barlow Enter GRID pass phrase for this identity:

Roger Barlow10 BaBar+Grid Idiot-proofing James’ easyroot: analysis of TauUser ntuples using the local BaBar farm via the grid We have disk space and CPUs and the knowledge and the need…

Roger Barlow11 BaBar Statistics As of Dec 05 - joint convenor of BaBar Statistics Working Group (with Ilya Narsky). Rôle in encouraging good practice

Roger Barlow12 Asymmetric Errors Shows bias resulting from combination of 2 typical asymmetric (Poisson) results using 8 different methods ‘Standard’ method is clearly not the best See PHYSTAT05

Roger Barlow13  ln L=- 1 / 2 ? Error estimates for a lifetime measurement from a small number of results Solid line is correct. Dashed line is usual. Dotted is Bartlett Approximation

Roger Barlow14 Coverage… How I spent the Xmas break.. To appear in PHYSTAT05 proceedings

Roger Barlow15 CALICE R and D towards a very high granularity Silicon/Tungsten ECAL for the Linear Collider Also HCAL designs being considered Very nice detector Mainstream design Manchester in at the start

Roger Barlow16 Bid to PPARC Went to PPARC in February Asked for £2.5M over the next 3 years for 5 workpackages Iterations between committees Emerge with delayed scheme costing £2.7M over the next 4 years EuDet makes up a lot of the shortfall

Roger Barlow17 Workpackage 4: Thermal+Mechanical Manchester with Roger Barlow in charge Work with École Polytechnique (and Lyon?) Glue studies (literature + ageing). Radiation? Thermal simulations – need information on design details Thermal measurements to validate simulations + cooling design Assembly robot: pattern recognition and placing for 24,000,000 pads

Roger Barlow18 In the UK CALICE project we WP4, the Thermal and Mechanical Work Package, and part of WP2, the DAQ package. TaskPeopleDeliverableDateProgress/remarks Glue studiesRay Julian Report on glue availability and characteristics Xmas Glue AgingRay Julian Andy Report on aging properties found using thermal cycling in programmable oven First results by Xmas, final by summer 06 Prototype assembly procedures Ray Julian Demonstrations 2006 Heat flow simulation StevePlotsSome by Xmas, more in 2006 Awaiting data on what to simulate Thermal Measurements MikeMeasurements to confirm simulations 2006 Assembly Robot Design Ray Julian Design and prototypesometime?What does the collaboration want? Networking Studies Marc Richard Studies of online to offline switch performance 2006/7 Acquiring new Virtex-4 based card Complete FPGA firmware MarcUpdated program allowing full use of memory SpringNeeded for CERN testbeam run CoolingRayDesign(s)2006/7

Roger Barlow19 CALICE - Mechanical Work started (Ray Thompson, Julian Freestone) Literature being looked at Glue currently used is Epotech E4110 (used by GLAST) Thermal Cycling: we have the programmable oven

Roger Barlow20 HEPP+EPS Finished term as IoP HEPP group chair 3 good conferences (Durham, Birmingham, Dublin) Started new no-losers HEPP prize for Particle Physics Re-started Newsletter (help from Christina) Vibrant series of half day conferences (including Manchester last November) EPS conference HEPP2007 on the way

Roger Barlow21 Next Year The mixture as before plus: Accelerator projects: Super B, ATF2, FFAG Statistics: BaBar SWG + Banff workshop. Asymmetric Errors CALICE: Get busy (+ Dave Bailey) BaBar Grid: now in demand