Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.

Slides:



Advertisements
Similar presentations
RPC & LVL1 Mu Barrel Online Monitoring during LS1 M. Della Pietra.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.
How to Register for ESRI’s GIS Online Course Yong Choi School of Business CSU, Bakersfield.
The FDET DQM System Ian C. Brock FDET Review 13/6/2002.
Parallel Reconstruction of CLEO III Data Gregory J. Sharp Christopher D. Jones Wilson Synchrotron Laboratory Cornell University.
Application Process USAJOBS – Application Manager USA STAFFING ® —OPM’S AUTOMATED HIRING TOOL FOR FEDERAL AGENCIES.
Virtual Memory Tuning   You can improve a server’s performance by optimizing the way the paging file is used   You may want to size the paging file.
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
Montgomery Parks, M-NCPPC Volunteer Services Office  Log Your Hours Online  View & Edit Your Volunteer Profile Hi and thanks for volunteering with Montgomery.
MarkeTrak Update Retail Market Subcommittee December 6, 2006 Adam Martinez & Karen Farley.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Framework for Automated Builds Natalia Ratnikova CHEP’03.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – Mar. 1, 2007 Outline: Status of infrastructure Schedule.
Met Alert Tool (MAT). Introduction What is MAT? –Met Alert Tool (MAT) monitors and alerts the user to weather conditions exceeding thresholds (for example,
Welcomes you ! To a Gateway for Total Project Planning, Review, Cost Monitoring & Reports
JAS3 + AIDA LC Simulations Workshop SLAC 19 th May 2003.
Trigger-aware analysis Current status Under development What’s missing Conclusions & Outlook Ricardo Gonçalo (RHUL)
©2006, CSA Creating and Managing Your COS Expertise Profile Managing Your CV and Promoting Your Work ® Resources for Research, Worldwide.
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
NICOS System of Nightly Builds for Distributed Development Alexander Undrus CHEP’03.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
Trigger Offline Monitoring Report Valeria Bartsch (Sussex), Ricardo Gonçalo (RHUL) Trigger General Meeting – 26 th May 2010.
The New TrigDecision Nicolas Berger, Till Eifert, Ricardo Gonçalo Physics Analysis Tools session ATLAS Software Workshop – Munich, March 2007.
Trigger validation for Event size TrigDecision Jets Electrons Ricardo Gonçalo, RHUL Physics Validation Meeting – 9 October 2007.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
Darren Price – HLT B-trigger offline status report :: B-Physics meeting July 23 rd ‘08Page 1 HLT B-trigger offline monitoring status Darren Price, LANCASTER.
Problem of the Day  Why are manhole covers round?
Fundamental Programming: Fundamental Programming K.Chinnasarn, Ph.D.
G.Corti, P.Robbe LHCb Software Week - 19 June 2009 FSR in Gauss: Generator’s statistics - What type of object is going in the FSR ? - How are the objects.
Introduction Advantages/ disadvantages Code examples Speed Summary Running on the AOD Analysis Platforms 1/11/2007 Andrew Mehta.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
A Technical Validation Module for the offline Auger-Lecce, 17 September 2009  Design  The SValidStore Module  Example  Scripting  Status.
LVL2 ID ESD/AOD classes Status and plans. PESA L2 ID Algorithms Review - RAL 25 July Ricardo Goncalo ESD/AOD More and more interest from physics.
DPDs and Trigger Plans for Derived Physics Data Follow up and trigger specific issues Ricardo Gonçalo and Fabrizio Salvatore RHUL.
Alexander Richards, UCL 1 Atlfast and RTT (plus DCube) Christmas Meeting 18/12/2007.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
AFFAIR – fabric monitoring ROOT 2005 Tome Antičić Ruđer Bošković Institute, Zagreb,Croatia ALICE,CERN Tome Antičić Ruđer Bošković.
Trigger Validation TAPM Open meeting 2 October 2007 Ricardo Goncalo.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Trigger validation for Many thanks to Long Zhao, Chihiro Omachi, Julie Kirk, Giovanni Siragusa, Patricia Conde Muiño, Andreas Reinsch, Olya Igonkina,
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
Status of Monitoring in HLT ALgorithms Ricardo Gonçalo, RHUL – BNL Analysis Jamboree – Aug. 6, 2007.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
1 SICBDST and Brunel Migration status and plans. 2 Migration Step 1: SICBMC/SICBDST split  Last LHCb week: Split done but not tested  Software week.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
The PESAsim analysis framework What it is How it works What it can do How to get it and use it Mark Sutton Tania McMahon Ricardo Gonçalo.
Trigger Validation Status and plans for rel.13 Olga Igonkina (U.Oregon) and Ricardo Gonçalo (RHUL) on behalf of several people Physics Validation – August.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
A. Gheata, ALICE offline week March 09 Status of the analysis framework.
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 26 th September, 2007 Outline: Programme for today Where we are: –List of tests – post mortem –Slices.
E/gamma report Ricardo Gonçalo for the e/γ slice.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
MET Slice Monitoring Xiaowen Lei, Venkat Kaushik Ken Johns.
Mar 05 - hvdsOffline / HLT1  Athena SW Infrastructure  programming + applying tools wrt. dependencies between packages  developing + testing extra ideas.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – May 29, 2007 Outline: Code status Status of nightly tests.
SQL Database Management
Latest News & Other Issues
CMS High Level Trigger Configuration Management
TriggerDB copy in TriggerTool
CHEP La Jolla San Diego 24-28/3/2003
ARCH-14: Power Your Organisation with OpenEdge
Presentation transcript:

Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure Planning meeting Other issues Conclusions

12 Apr. 07TAPM Open Meeting2 Plans Try to have as many automatic tests as possible –Have enough information available to find and solve problems –Boring work can be automated to a large extent Available tests –ANT: compares log files for a few events –RTT: compares histograms for ~1k events –Full-chain RTT: look for major errors in chain for ~200 events Need to address: –Algorithm validation: Monitoring histograms: –time –cut variables –step counters in hypothesis –Integration tests: does it all work together? TrigDecision steering counters trigger EDM objects Reading/writing ESD/AOD/TAG/SAN

12 Apr. 07TAPM Open Meeting3 Status of infrastructure Basically well advanced. Thanks everyone for fast response! See Tomasz’s talk in this meeting for up-to-date details and instructions Histograms were added or are being added to: –TrigT2CaloJet/Tau/.. –TrigT2Tau –TrigTauHypo –TrigEgammaHypo –TrigJetHypo –TrigMuonHypo –ID tracking –B-physics algos –Cosmics –Etc Announcement: please check status of monitoring histograms in your algorithm in new steering wiki:

12 Apr. 07TAPM Open Meeting4 Status of infrastructure Monitoring infrastructure debugged also thanks to this exercise –Adds only small overheads to HLT algorithms –Allows different configuration for online Monitoring and offline Validation –Allows prescaled filling of histograms Now creating RTT jobs –Will use same tests as for ANT Run on more events Produce histograms already added to algorithms –Expect to have some jobs running by next week

12 Apr. 07TAPM Open Meeting5 Planning meeting Meeting next week with people responsible for each slice to discuss: –Progress on adding monitoring histograms –Test code to read EDM objects and produce histograms –Other existing/possible monitoring tools –Existing and planned RTT/ANT tests –Display and analysis of test results –Data samples used in tests –Validation of Level 1 simulation code –Record of validation results for past releases Dates now under discussion (choice seems tough..) Please let me and Olya know of any other subject?

12 Apr. 07TAPM Open Meeting6 Other issues Changes in RTT test organisation: talk by Vivek Jain and Wouter Verkerke in SW week: –Jobs being classified into: Offline (Performance validation!), Development, and Online (for later) Looking into ways of displaying and analysing test results and also at other tests (memory, size on disk, etc) DQMF: talk by Michael Wilson in last SW week –Framework used for online monitoring –Seems very powerful and flexible –Not planning to use for now (“too much” for our current needs), –But plan to keep an eye on it and maybe use in the future Analysis and Interpretation ( AI ): talk by Alex Undrus in last SW week –Python-based framework –Do post-processing of ANT, RTT, nightly builds,… –Check and validation tools are plugins –Analyse log files, histograms, pool files Tools to measure memory, disk size, time: talk by S. Binet in last SW week

12 Apr. 07TAPM Open Meeting7 Conclusions Infrastructure to support validation well advanced (but more work to do) Using common tools; good overlap with online Monitoring! Looking at new tools and methods to display and analyse results

12 Apr. 07TAPM Open Meeting8 AI Plugins –Tools to analyse logfile in place –Several tools under development for histogram analysis AI deploys tests and publishes results in web page: computing/links/distDirectory/nightlies/trials/ai_www/ See also wiki: columns for “Offline” “Development” “Online” color coded result for each tool link to Logfile or histo separate tables for OFF, DEV, ON classes