9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 9 Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations.

Slides:



Advertisements
Similar presentations
7. Facilities layout.
Advertisements

Lean Office – Layout & Cells
9 Layout Strategies PowerPoint presentation to accompany
Process Selection and Facility Layout
Operations Management Layout Strategy Chapter 9
9 Layout Strategies PowerPoint presentation to accompany
Unit-3.
9 Layout Decisions PowerPoint presentation to accompany
9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 9 Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations.
9 - 1© 2011 Pearson Education 9 9 Layout Decisions PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
9 Layout Decisions PowerPoint presentation to accompany
Layout Strategies 9 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
Location Strategy and Layout Strategy
Layout Strategy. Objectives of the Layout Strategy Develop an economical layout which will meet the requirements of: product design and volume (product.
Chapter 9 – Layout Strategy
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
PRODUCTION AND OPERATIONS MANAGEMENT
© 2006 Prentice Hall, Inc.9 – 1 Layout Strategy Chapter9.
Operations Management
Operations Management Layout Strategy Chapter 9
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Operations Management
© 2006 Prentice Hall, Inc.9 – 1 Layout Strategy Ch10 © 2006 Prentice Hall, Inc. Production Planning and Control.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Layout Decision © 2006 Prentice Hall, Inc. Sesi 6 – Henry Yuliando.
Operations Management
Operations Management Layout Strategy
Operations Management
Operations Management
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
Chapter 10 – Facility Layout
Layout Strategy.
Chapter 9 : Layout Strategies
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 12 1.
© 2008 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategies Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Design Considerations  Higher utilization of space, equipment, and people  Improved.
Manajemen Operasi Layout Akhir Matua Harahap. Layout Layout: (related to) –Capacity –Process –Flexiblity and cost –Quality of work life –Customer contact.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
9 Layout Strategies PowerPoint presentation to accompany
8 - 1 Chapter 8: Location Strategies Outline  The Strategic Importance of Location  Factors That Affect Location Decisions  Labor Productivity.
Chapter 9 : Layout Strategies
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 9 Layout Strategies.
9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 9 Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations.
Operations Management MSOM Lecture 9 – Layout Strategies Al Baharmast, Ph.D.
9 - 1 Layout Decisions PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
Operations Management
Operations Management
9 Layout Strategies PowerPoint presentation to accompany
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Layout Strategies 9 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
Operations Management
Layout Strategies UNESCO-UNITWIN UUOOI-2015 Prepared by
Layout Strategy.
SECTION 2 STRATEGIC DESIGN
9 Layout Strategies PowerPoint presentation to accompany
9 Layout Strategies PowerPoint presentation to accompany
Operations Management
9 Layout Strategies PowerPoint presentation to accompany
7 Layout Strategies PowerPoint presentation to accompany
FACILITY LAYOUT Facility layout means:
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
9 Layout Decisions PowerPoint presentation to accompany
9 Layout Strategies PowerPoint presentation to accompany
9 Layout Strategies PowerPoint presentation to accompany
9 Layout Strategies PowerPoint presentation to accompany
Presentation transcript:

9 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 9 9 Layout Strategies PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl

9 - 2© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline  Global Company Profile: McDonald’s  The Strategic Importance of Layout Decisions  Types of Layout  Office Layout

9 - 3© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Retail Layout  Servicescapes  Warehousing and Storage Layouts  Cross-Docking  Random Docking  Customizing  Fixed-Position Layout

9 - 4© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Process-Oriented Layout  Computer Software for Process- Oriented Layouts  Work Cells  Requirements of Work Cells  Staffing and Balancing Work Cells  The Focused Work Center and the Focused Factory

9 - 5© 2011 Pearson Education, Inc. publishing as Prentice Hall Outline – Continued  Repetitive and Product-Oriented Layout  Assembly-Line Balancing

9 - 6© 2011 Pearson Education, Inc. publishing as Prentice Hall Learning Objectives When you complete this chapter, you should be able to: 1.Discuss important issues in office layout 2.Define the objectives of retail layout 3.Discuss modern warehouse management and terms such as ASRS, cross-docking, and random stocking 4.Identify when fixed-position layouts are appropriate

9 - 7© 2011 Pearson Education, Inc. publishing as Prentice Hall Learning Objectives When you complete this chapter, you should be able to: 5.Explain how to achieve a good process- oriented facility layout 6.Define work cell and the requirements of a work cell 7.Define product-oriented layout 8.Explain how to balance production flow in a repetitive or product-oriented facility

9 - 8© 2011 Pearson Education, Inc. publishing as Prentice Hall Innovations at McDonald’s  Indoor seating (1950s)  Drive-through window (1970s)  Adding breakfast to the menu (1980s)  Adding play areas (late 1980s)  Redesign of the kitchens (1990s)  Self-service kiosk (2004)  Now three separate dining sections

9 - 9© 2011 Pearson Education, Inc. publishing as Prentice Hall Innovations at McDonald’s  Indoor seating (1950s)  Drive-through window (1970s)  Adding breakfast to the menu (1980s)  Adding play areas (late 1980s)  Redesign of the kitchens (1990s)  Self-service kiosk (2004)  Now three separate dining sections Six out of the seven are layout decisions!

9 - 10© 2011 Pearson Education, Inc. publishing as Prentice Hall McDonald’s New Layout  Seventh major innovation  Redesigning all 30,000 outlets around the world  Three separate dining areas  Linger zone with comfortable chairs and Wi-Fi connections  Grab and go zone with tall counters  Flexible zone for kids and families  Facility layout is a source of competitive advantage

9 - 11© 2011 Pearson Education, Inc. publishing as Prentice Hall Strategic Importance of Layout Decisions The objective of layout strategy is to develop an effective and efficient layout that will meet the firm’s competitive requirements

9 - 12© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Design Considerations  Higher utilization of space, equipment, and people  Improved flow of information, materials, or people  Improved employee morale and safer working conditions  Improved customer/client interaction  Flexibility

9 - 13© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 1.Office layout 2.Retail layout 3.Warehouse layout 4.Fixed-position layout 5.Process-oriented layout 6.Work-cell layout 7.Product-oriented layout

9 - 14© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 1.Office layout: Positions workers, their equipment, and spaces/offices to provide for movement of information 2.Retail layout: Allocates shelf space and responds to customer behavior 3.Warehouse layout: Addresses trade- offs between space and material handling

9 - 15© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 4.Fixed-position layout: Addresses the layout requirements of large, bulky projects such as ships and buildings 5.Process-oriented layout: Deals with low-volume, high-variety production (also called job shop or intermittent production)

9 - 16© 2011 Pearson Education, Inc. publishing as Prentice Hall Types of Layout 6.Work cell layout: Arranges machinery and equipment to focus on production of a single product or group of related products 7.Product-oriented layout: Seeks the best personnel and machine utilizations in repetitive or continuous production

9 - 17© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Strategies ObjectivesExamples OfficeLocate workers requiring frequent contact close to one another Allstate Insurance Microsoft Corp. RetailExpose customer to high- margin items Kroger’s Supermarket Walgreen’s Bloomingdale’s Warehouse (storage) Balance low cost storage with low-cost material handling Federal-Mogul’s warehouse The Gap’s distribution center Project (fixed position) Move material to the limited storage areas around the site Ingall Ship Building Corp. Trump Plaza Pittsburgh Airport Table 9.1

9 - 18© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout Strategies ObjectivesExamples Job Shop (process oriented) Manage varied material flow for each product Arnold Palmer Hospital Hard Rock Cafe Olive Garden Work Cell (product families) Identify a product family, build teams, cross train team members Hallmark Cards Wheeled Coach Standard Aero Repetitive/ Continuous (product oriented) Equalize the task time at each workstation Sony’s TV assembly line Toyota Scion Table 9.1

9 - 19© 2011 Pearson Education, Inc. publishing as Prentice Hall Good Layouts Consider  Material handling equipment  Capacity and space requirements  Environment and aesthetics  Flows of information  Cost of moving between various work areas

9 - 20© 2011 Pearson Education, Inc. publishing as Prentice Hall Office Layout  Grouping of workers, their equipment, and spaces to provide comfort, safety, and movement of information  Movement of information is main distinction  Typically in state of flux due to frequent technological changes

9 - 21© 2011 Pearson Education, Inc. publishing as Prentice Hall Relationship Chart Figure 9.1

9 - 22© 2011 Pearson Education, Inc. publishing as Prentice Hall Supermarket Retail Layout  Objective is to maximize profitability per square foot of floor space  Sales and profitability vary directly with customer exposure

9 - 23© 2011 Pearson Education, Inc. publishing as Prentice Hall Five Helpful Ideas for Supermarket Layout 1.Locate high-draw items around the periphery of the store 2.Use prominent locations for high-impulse and high-margin items 3.Distribute power items to both sides of an aisle and disperse them to increase viewing of other items 4.Use end-aisle locations 5.Convey mission of store through careful positioning of lead-off department

9 - 24© 2011 Pearson Education, Inc. publishing as Prentice Hall Store Layout Figure 9.2

9 - 25© 2011 Pearson Education, Inc. publishing as Prentice Hall Retail Slotting  Manufacturers pay fees to retailers to get the retailers to display (slot) their product  Contributing factors  Limited shelf space  An increasing number of new products  Better information about sales through POS data collection  Closer control of inventory

9 - 26© 2011 Pearson Education, Inc. publishing as Prentice Hall Retail Store Shelf Space Planogram  Computerized tool for shelf- space management  Generated from store’s scanner data on sales  Often supplied by manufacturer 5 facings Shampoo Conditioner Shampoo Conditioner 2 ft.

9 - 27© 2011 Pearson Education, Inc. publishing as Prentice Hall Servicescapes 1.Ambient conditions 1.Ambient conditions - background characteristics such as lighting, sound, smell, and temperature 2.Spatial layout and functionality 2.Spatial layout and functionality - which involve customer circulation path planning, aisle characteristics, and product grouping 3.Signs, symbols, and artifacts 3.Signs, symbols, and artifacts - characteristics of building design that carry social significance

9 - 28© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  Objective is to optimize trade-offs between handling costs and costs associated with warehouse space  Maximize the total “cube” of the warehouse – utilize its full volume while maintaining low material handling costs

9 - 29© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  All costs associated with the transaction  Incoming transport  Storage  Finding and moving material  Outgoing transport  Equipment, people, material, supervision, insurance, depreciation  Minimize damage and spoilage Material Handling Costs

9 - 30© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehousing and Storage Layouts  Warehouse density tends to vary inversely with the number of different items stored  Automated Storage and Retrieval Systems (ASRSs) can significantly improve warehouse productivity by an estimated 500%  Dock location is a key design element

9 - 31© 2011 Pearson Education, Inc. publishing as Prentice Hall Cross-Docking  Materials are moved directly from receiving to shipping and are not placed in storage in the warehouse  Requires tight scheduling and accurate shipments, bar code or RFID identification used for advanced shipment notification as materials are unloaded

9 - 32© 2011 Pearson Education, Inc. publishing as Prentice Hall Random Stocking  Typically requires automatic identification systems (AISs) and effective information systems  Random assignment of stocking locations allows more efficient use of space  Key tasks 1.Maintain list of open locations 2.Maintain accurate records 3.Sequence items to minimize travel, pick time 4.Combine picking orders 5.Assign classes of items to particular areas

9 - 33© 2011 Pearson Education, Inc. publishing as Prentice Hall Customizing  Value-added activities performed at the warehouse  Enable low cost and rapid response strategies  Assembly of components  Loading software  Repairs  Customized labeling and packaging

9 - 34© 2011 Pearson Education, Inc. publishing as Prentice Hall Shipping and receiving docks Office Customization Conveyor Storage racks Staging Warehouse Layout Traditional Layout

9 - 35© 2011 Pearson Education, Inc. publishing as Prentice Hall Warehouse Layout Cross-Docking Layout Shipping and receiving docks Office Shipping and receiving docks

9 - 36© 2011 Pearson Education, Inc. publishing as Prentice Hall Fixed-Position Layout  Product remains in one place  Workers and equipment come to site  Complicating factors  Limited space at site  Different materials required at different stages of the project  Volume of materials needed is dynamic

9 - 37© 2011 Pearson Education, Inc. publishing as Prentice Hall Alternative Strategy  As much of the project as possible is completed off-site in a product- oriented facility  This can significantly improve efficiency but is only possible when multiple similar units need to be created

9 - 38© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout  Like machines and equipment are grouped together  Flexible and capable of handling a wide variety of products or services  Scheduling can be difficult and setup, material handling, and labor costs can be high

9 - 39© 2011 Pearson Education, Inc. publishing as Prentice Hall Surgery Radiology ER triage room ER BedsPharmacy Emergency room admissions Billing/exit Laboratories Process-Oriented Layout Patient A - broken leg Patient B -erratic heart pacemaker Figure 9.3

9 - 40© 2011 Pearson Education, Inc. publishing as Prentice Hall Layout at Arnold Palmer Hospital Central break and medical supply rooms Local linen supply Local nursing pod Pie-shaped rooms Central nurses station

9 - 41© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout  Arrange work centers so as to minimize the costs of material handling  Basic cost elements are  Number of loads (or people) moving between centers  Distance loads (or people) move between centers

9 - 42© 2011 Pearson Education, Inc. publishing as Prentice Hall Process-Oriented Layout Minimize cost = ∑ ∑ X ij C ij n i = 1 n j = 1 wheren=total number of work centers or departments i, j=individual departments X ij =number of loads moved from department i to department j C ij =cost to move a load between department i and department j

9 - 43© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example 1.Construct a “from-to matrix” 2.Determine the space requirements 3.Develop an initial schematic diagram 4.Determine the cost of this layout 5.Try to improve the layout 6.Prepare a detailed plan Arrange six departments in a factory to minimize the material handling costs. Each department is 20 x 20 feet and the building is 60 feet long and 40 feet wide.

9 - 44© 2011 Pearson Education, Inc. publishing as Prentice Hall DepartmentAssemblyPaintingMachineReceivingShippingTesting (1)(2)Shop (3)(4)(5)(6) Assembly (1) Painting (2) Machine Shop (3) Receiving (4) Shipping (5) Testing (6) Number of loads per week Process Layout Example Figure 9.4

9 - 45© 2011 Pearson Education, Inc. publishing as Prentice Hall Area 1Area 2Area 3 Area 4Area 5Area 6 60’ 40’ Process Layout Example ReceivingShippingTesting DepartmentDepartmentDepartment (4)(5)(6) Figure 9.5 AssemblyPaintingMachine Shop DepartmentDepartmentDepartment (1)(2)(3)

9 - 46© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Interdepartmental Flow Graph Figure Machine Shop (3) Testing (6) Shipping (5) Receiving (4) Assembly (1) Painting (2)

9 - 47© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Cost =$50+$200+$40 (1 and 2)(1 and 3)(1 and 6) +$30+$50+$10 (2 and 3)(2 and 4)(2 and 5) +$40+$100+$50 (3 and 4)(3 and 6)(4 and 5) = $570 Cost = ∑ ∑ X ij C ij n i = 1 n j = 1

9 - 48© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Revised Interdepartmental Flow Graph Figure Machine Shop (3) Testing (6) Shipping (5) Receiving (4) Painting (2) Assembly (1)

9 - 49© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Layout Example Cost =$50+$100+$20 (1 and 2)(1 and 3)(1 and 6) +$60+$50+$10 (2 and 3)(2 and 4)(2 and 5) +$40+$100+$50 (3 and 4)(3 and 6)(4 and 5) = $480 Cost = ∑ ∑ X ij C ij n i = 1 n j = 1

9 - 50© 2011 Pearson Education, Inc. publishing as Prentice Hall Area 1Area 2Area 3 Area 4Area 5Area 6 60’ 40’ Process Layout Example ReceivingShippingTesting DepartmentDepartmentDepartment (4)(5)(6) Figure 9.8 Painting Assembly Machine Shop DepartmentDepartmentDepartment (2)(1)(3)

9 - 51© 2011 Pearson Education, Inc. publishing as Prentice Hall Computer Software  Graphical approach only works for small problems  Computer programs are available to solve bigger problems  CRAFT  ALDEP  CORELAP  Factory Flow

9 - 52© 2011 Pearson Education, Inc. publishing as Prentice Hall CRAFT Example Figure 9.9 TOTAL COST 20,100 EST. COST REDUCTION.00 ITERATION 0 (a) AAAABBAAAABBDDDDDDCCDDDDFFFFFDEEEEEDAAAABBAAAABBDDDDDDCCDDDDFFFFFDEEEEED TOTAL COST 14,390 EST. COST REDUCTION 70 ITERATION 3 (b) DDDDBBDDDDBBDDDEEECCDEEFAAAAAFAAAFFFDDDDBBDDDDBBDDDEEECCDEEFAAAAAFAAAFFF

9 - 53© 2011 Pearson Education, Inc. publishing as Prentice Hall Computer Software  Three dimensional visualization software allows managers to view possible layouts and assess process, material handling, efficiency, and safety issues

9 - 54© 2011 Pearson Education, Inc. publishing as Prentice Hall Work Cells  Reorganizes people and machines into groups to focus on single products or product groups  Group technology identifies products that have similar characteristics for particular cells  Volume must justify cells  Cells can be reconfigured as designs or volume changes

9 - 55© 2011 Pearson Education, Inc. publishing as Prentice Hall Advantages of Work Cells 1.Reduced work-in-process inventory 2.Less floor space required 3.Reduced raw material and finished goods inventory 4.Reduced direct labor 5.Heightened sense of employee participation 6.Increased use of equipment and machinery 7.Reduced investment in machinery and equipment

9 - 56© 2011 Pearson Education, Inc. publishing as Prentice Hall Requirements of Work Cells 1.Identification of families of products 2.A high level of training, flexibility and empowerment of employees 3.Being self-contained, with its own equipment and resources 4.Test (poka-yoke) at each station in the cell

9 - 57© 2011 Pearson Education, Inc. publishing as Prentice Hall Improving Layouts Using Work Cells Current layout - workers in small closed areas. Improved layout - cross-trained workers can assist each other. May be able to add a third worker as additional output is needed. Figure 9.10 (a)

9 - 58© 2011 Pearson Education, Inc. publishing as Prentice Hall Improving Layouts Using Work Cells Current layout - straight lines make it hard to balance tasks because work may not be divided evenly Improved layout - in U shape, workers have better access. Four cross-trained workers were reduced. Figure 9.10 (b) U-shaped line may reduce employee movement and space requirements while enhancing communication, reducing the number of workers, and facilitating inspection

9 - 59© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing and Balancing Work Cells Determine the takt time Takt time = Total work time available Units required Determine the number of operators required Workers required = Total operation time required Takt time

9 - 60© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing Work Cells Example 600 Mirrors per day required Mirror production scheduled for 8 hours per day From a work balance chart total operation time = 140 seconds Standard time required Operations AssemblePaintTestLabelPack for shipment

9 - 61© 2011 Pearson Education, Inc. publishing as Prentice Hall Staffing Work Cells Example 600 Mirrors per day required Mirror production scheduled for 8 hours per day From a work balance chart total operation time = 140 seconds Takt time= (8 hrs x 60 mins) / 600 units =.8 mins = 48 seconds Workers required= Total operation time required Takt time = 140 / 48 = 2.91

9 - 62© 2011 Pearson Education, Inc. publishing as Prentice Hall Work Balance Charts  Used for evaluating operation times in work cells  Can help identify bottleneck operations  Flexible, cross-trained employees can help address labor bottlenecks  Machine bottlenecks may require other approaches

9 - 63© 2011 Pearson Education, Inc. publishing as Prentice Hall Focused Work Center and Focused Factory  Focused Work Center  Identify a large family of similar products that have a large and stable demand  Moves production from a general-purpose, process-oriented facility to a large work cell  Focused Factory  A focused work cell in a separate facility  May be focused by product line, layout, quality, new product introduction, flexibility, or other requirements

9 - 64© 2011 Pearson Education, Inc. publishing as Prentice Hall Focused Work Center and Focused Factory Table 9.2 Work CellFocused Work CenterFocused Factory Description: Work cell is a temporary product-oriented arrangement of machines and personnel in what is ordinarily a process- oriented facility A focused work center is a permanent product- oriented arrangement of machines and personnel in what is ordinarily a process- oriented facility A focused factory is a permanent facility to produce a product or component in a product-oriented facility. Many focused factories currently being built were originally part of a process-oriented facility Example: A job shop with machinery and personnel rearranged to produce 300 unique control panels Example: Pipe bracket manufacturing at a shipyard Example: A plant to produce window mechanism for automobiles

9 - 65© 2011 Pearson Education, Inc. publishing as Prentice Hall Repetitive and Product- Oriented Layout 1.Volume is adequate for high equipment utilization 2.Product demand is stable enough to justify high investment in specialized equipment 3.Product is standardized or approaching a phase of life cycle that justifies investment 4.Supplies of raw materials and components are adequate and of uniform quality Organized around products or families of similar high-volume, low-variety products

9 - 66© 2011 Pearson Education, Inc. publishing as Prentice Hall Product-Oriented Layouts  Fabrication line  Builds components on a series of machines  Machine-paced  Require mechanical or engineering changes to balance  Assembly line  Puts fabricated parts together at a series of workstations  Paced by work tasks  Balanced by moving tasks Both types of lines must be balanced so that the time to perform the work at each station is the same

9 - 67© 2011 Pearson Education, Inc. publishing as Prentice Hall Product-Oriented Layouts 1.Low variable cost per unit 2.Low material handling costs 3.Reduced work-in-process inventories 4.Easier training and supervision 5.Rapid throughputAdvantages 1.High volume is required 2.Work stoppage at any point ties up the whole operation 3.Lack of flexibility in product or production ratesDisadvantages

9 - 68© 2011 Pearson Education, Inc. publishing as Prentice Hall McDonald’s Assembly Line Figure 9.12

9 - 69© 2011 Pearson Education, Inc. publishing as Prentice Hall Disassembly Lines  Disassembly is being considered in new product designs  “Green” issues and recycling standards are important consideration  Automotive disassembly is the 16 th largest industry in the US

9 - 70© 2011 Pearson Education, Inc. publishing as Prentice Hall Assembly-Line Balancing  Objective is to minimize the imbalance between machines or personnel while meeting required output  Starts with the precedence relationships  Determine cycle time  Calculate theoretical minimum number of workstations  Balance the line by assigning specific tasks to workstations

9 - 71© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example This means that tasks B and E cannot be done until task A has been completed PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time 66

9 - 72© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time 66 I G F C D H B E A Figure 9.13

9 - 73© 2011 Pearson Education, Inc. publishing as Prentice Hall I G F C D H B E A Figure 9.13 PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time 66 Wing Component Example 480available mins per day 40units required Cycle time = Production time available per day Units required per day = 480 / 40 = 12 minutes per unit Minimum number of workstations = ∑ Time for task i Cycle time n i = 1 = 66 / 12 = 5.5 or 6 stations

9 - 74© 2011 Pearson Education, Inc. publishing as Prentice Hall Wing Component Example I G F C D H B E A Figure 9.13 PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time available mins per day 40units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 Line-Balancing Heuristics 1.Longest task timeChoose the available task with the longest task time 2.Most following tasksChoose the available task with the largest number of following tasks 3.Ranked positional weight Choose the available task for which the sum of following task times is the longest 4.Shortest task timeChoose the available task with the shortest task time 5.Least number of following tasks Choose the available task with the least number of following tasks Table 9.4

9 - 75© 2011 Pearson Education, Inc. publishing as Prentice Hall 480available mins per day 40units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time 66 Station 1 Wing Component Example Station 2 Station 3 Station 4 Station 5 Station 6 I GF H C D B E A Figure 9.14

9 - 76© 2011 Pearson Education, Inc. publishing as Prentice Hall PerformanceTask Must Follow TimeTask Listed Task(minutes)Below A10— B11A C5B D4B E12A F3C, D G7F H11E I3G, H Total time 66 Wing Component Example 480available mins per day 40units required Cycle time = 12 mins Minimum workstations = 5.5 or 6 Efficiency = ∑ Task times (Actual number of workstations) x (Largest cycle time) = 66 minutes / (6 stations) x (12 minutes) = 91.7%

9 - 77© 2011 Pearson Education, Inc. publishing as Prentice Hall All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.