Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.

Slides:



Advertisements
Similar presentations
The Florida Everglades. The Everglades is also known as A: The Lake of Water Lilies B: The River of Grass C: The River of Mangroves D: The River of Sawgrass.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Everglades Restoration A Program for Integrated Regional Management
Presentation Texas Water: What You Should Know November 6, 2010.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Florida Water Forum Everglades Restoration June 3, 2011.
Preparing for the Rainy Season SFWMD Operations & Actions.
Imperial River: Water Quality Status and Basin Management Action Plan.
The South Florida Watershed
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Historical Context: How has the Caloosahatchee River/Estuary been altered? How does it fit within the broader system? Michael L. Parsons Coastal Watershed.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Florida’s Water Challenge Presentation for House Agriculture and Natural Resources Committee February 20 th, 2013 By Florida Water Advocates.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
TMDL Overview Kurt Spitzer 850/ Estimates of Cost of Compliance Florida Consumer Fertilizer.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Water Resources Advisory Commission January 5, 2006.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
River of Grass Phase I Planning Water Resources Advisory Commission Issues Workshop February 3, 2009.
IDEM and Agricultural Organizations Meeting February 17, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental Management.
Total Maximum Daily Load (TMDL) Program Status Update and Needs Assessment Presented by the Environmental Protection Division March 18, 2008.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Regulatory Developments Affecting Southwest Washington Land Use in Southwestern Washington Law Seminars International Vancouver, WA February 11, 2008 Bill.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
Best Local Land Use Practices Update Kirby Date, Countryside Program Coordinator.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
September 18, 2002 Master Recreation Plan Team Kick-Off Meeting Comprehensive Everglades Restoration Plan.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Overview of the Total Maximum Daily Load Program.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
About water pollution Water supply is a complex issue in California – San Joaquin Valley, Los Angeles – Water increased by 170% from 2006 to 2010 – Water.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Florida’s Water Infrastructure Funding Challenge Presentation for Florida Legislative Delegations Fall 2013 By Florida Section of the AWWA.
Water Reservation for Caloosahatchee Estuary April 16, 2010 Caloosahatchee Estuary Reservation Team Everglades Restoration and Capital Projects Office.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Central Florida Water Initiative 6 recommendations for getting the water right.
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Water Conditions Summary Jeff Kivett, PE, Division Director Operations, Engineering.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
Project Schedule Final SWIM Plans GEBF Funding Request
Joel VanArman Water Supply Planning and Development Division
John Tinger U.S. EPA Region IX
Washington State Infrastructure Financing
Sacramento Environmental Commission January 2019.
Central District overview and the 2016 Water Bill
Presentation transcript:

Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources Division

Overview Launched in 2005 Issues, Updates and Accomplishments Issues on the Horizon: 2010 Water Resource Initiatives and Challenges

The River is Central To Our Economy Our first “Highway” Central to our ecotourism-based economy Its management is central to the success of our fishing industry When it suffers, we suffer

Too Much, the Water Turns Red

Too Little or Too Much and the Water Turns Green

Our Industry: Tourism A $3 billion a year industry, tourism is attracted primarily to the coast Surveys here and elsewhere depict impacts as high as 35% on lodging and 29% on restaurants Using an impact of 20% during a 2 month red tide, Lee County suffered a $90 million loss

Lee County Water Resource Protection Initiative: Key Goals Implementation of Comprehensive Everglades Restoration Plan (“CERP”) Watershed approach for Protection of Caloosahatchee River & Estuary Water Quality and Water Quantity Projects State Legislation Public, Environmental and Elected Official Outreach

Goals and Accomplishments Caloosahatchee West Basin Storage Reservoir (The C-43 Project) Phase II PIR (The Water Quality Project) Southwest Florida Feasibility Study Southern Flow-way/Storage – The River of Grass / U.S. Sugar Deal

Caloosahatchee River West Basin Storage Reservoir Project (The C-43 Project) Provide essential flows during the dry season resulting in improved salinity balance and ecological health of the Caloosahatchee The Federal and State governments have invested over $200 million in land acquisition and engineering costs

C-43 Phase II PIR (Water Quality Treatment ) Commitment for Phase II of project to address upper basin needs (storage and water quality) Test Cell project (for water quality analysis BOMA 1,770 acres). Permits obtained (ready to go). C-43 Project – Log jam resolved: Chief’s Report approved by Corps Headquarters in Washington, D.C. Potential WRDA 2010

Northern Everglades and Estuary Protection Act (NEEPA) Created the Caloosahatchee River Watershed Protection Plan. Contains major initiatives and programs Watershed Construction Projects Watershed Pollutant Control Program Watershed Research and Water Quality Monitoring Program

Caloosahatchee River Watershed Protection Plan – Job Done Accepted by the Lee County Commission and the SFWMD Governing Board in January, 2009 Accepted by the 2009 State Legislature

What’s Next? 2010 Priorities Almost every year the Caloosahatchee has exceedances or violations of minimum and maximum surface water flows Significant Regulatory, Planning and Project Initiatives are underway and needed.

Lake Okeechobee Regulation Schedule Corps developed new Lake Okeechobee Regulation Schedule ( ) Extensive written comments and advocacy to achieve best schedule for Caloosahatchee – LORS 2008 – Reduces damaging wet season discharges – Low Flows for dry season

What’s Next? 2010 Priorities Caloosahatchee River Watershed Protection Plan – Implementation and funding Lake Okeechobee Regulation Schedule – Development of Adaptive Protocols for new Schedule to address lower Lake levels and deliveries to prevent environmental harm to Caloosahatchee Estuary

Future Needs and Challenges: Caloosahatchee Watershed Regulatory/Permitting Issues Basin Permitting Programs New versus existing land uses

2010 Priorities C-43 Project: Congressional Authorization and Implementation Phase II: Expedite and Implement Project Implementation Report (PIR) C-43 Project Phase II – Water Quality Component Prioritizing and funding

2010 Priorities Water supply for Caloosahatchee: – Water Reservations Water Quality: – Finalize TMDLs – Develop BMAP to implement TMDLs – Basin Rules – Numeric Nutrient Criteria – Funding and construction of BOMA

2010 Priorities Completion of the SWFFS Implementation and funding of the CRWPP Adaptive Protocols to deliver Lake Okeechobee water during dry times