P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Progress on 2006 Committee Recommendations Mark McKinnon Project Manager.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Rick PerleyEVLA Advisory Committee Meeting December 14 – 15, EVLA `Descoping’ Options Rick Perley.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Science Commissioning
EVLA Advisory Committee Meeting System Status
Software Requirements
Charge to the Review Panel
Gustaaf van Moorsel September 9, 2003
Software Requirements
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA Operations Jim Ulvestad
Correlator Growth Path
EVLA Construction Status
Presentation transcript:

P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response

P.NapierEVLA Advisory Comm, 14 Dec 2004 Status Activities since last meeting EVLA Test Antenna (#13) –Prototype system. First light and fringes at X-band and L-band –Continuing addition of capabilities (eg time synchronization, fringe rotation) –Debugging and testing slower than expected Robustness of prototypes, complexity of equipment, reduced monitor data, AOC-VLA separation.

P.NapierEVLA Advisory Comm, 14 Dec 2004 Status (cont) Second EVLA Antenna (#14) –Second generation prototypes. First EVLA- EVLA fringes. –Came to life much more easily than 13 –“Production-like” modules early 2005 Third EVLA Antenna (#16) –Undergoing EVLA structural modifications –First “production” modules

P.NapierEVLA Advisory Comm, 14 Dec 2004 Status (cont) Lab test system –Mockup of antenna electronics system established in AOC lab. Production orders –Lifetime supplies of adequately tested components being ordered to prevent obsolescence problem and reduce cost (eg DTS chips, cryo-refrigerators, feed support structures, antenna HVAC, synthesizer YIG oscillators).

P.NapierEVLA Advisory Comm, 14 Dec 2004 Status (cont) Correlator –Chip contract in final process –Prototype board construction beginning Software –Monitor and Control (M/C): keeping up with antenna test needs, working on transition software. –e2e: EVLA overall software design completed –AIPS++: passed ALMA acceptance test, EVLA specific tasks begun.

P.NapierEVLA Advisory Comm, 14 Dec 2004 Status (cont) Design Reviews Completed –Overall software design –M/C hardware and IF/LO/FO CDRs –Correlator PDR, Feeds, FE and software CDRs planned

P.NapierEVLA Advisory Comm, 14 Dec Committee Response Last meeting 30 Sept., Project Response 4 Nov., Management Issues –Schedule delay. Recovery plan in place (see schedule presentation) Hardware Issues –Location of FE hybrids. Detailed study concluded no change. –Calibration of solar data. Calibration procedure devised. –Dual LO phase stability test. Not yet achieved. Effort had to be used for synthesizer improvements, fringe rotation, temperature chamber phase stability tests.

P.NapierEVLA Advisory Comm, 14 Dec Committee Response (cont) –Obsolete electronic components. So far sufficient funds available to buy lifetime supplies of critical components. Correlator –Chip schedule contingency. Study contracts with two vendors completed, detailed chip CDR planned ( Jan 2005). –Correlator software definition and management. Software specification documents in place, some NRAO programmers under HIA direction. –Simultaneous observations with EVLA, NMA and VLBA. Funds in Phase II budget for additional programming effort

P.NapierEVLA Advisory Comm, 14 Dec Committee Response (cont) Correlator –Pulsar Observing. Supported by WIDAR correlator and correlator backend design. Software –NRAO/EVLA computing management structure. The structure has worked – all EVLA software under single lead. Major issue now is not management but resource availability. NRAO Director intends to appoint NRAO-wide Software Leader (Ulvestad talk). –VLA and VLBA observers should use AIPS++. Not in current short-term plan, although VLA data is used for testing. –An algorithm development group is needed. A group is now functioning. (See Bhatnagar talk).

P.NapierEVLA Advisory Comm, 14 Dec Committee Response (cont) Software –Need for overall EVLA Software System Design. Completed, (see Van Moorsel talk), –AIPS++ performance, robustness and interface. Significant improvements and plans. (see Myers/McMullin talks). –Need for User and Scientist involvement in testing. Good involvement in AIPS++ testing. Concern over resource availablity for EVLA software commissioning (see Owen talk). RFI –Design for RFI excision. Significant module testing for self-generated RFI, no obvious problems on test antenna. Headroom specification revisited – OK. Hooks for high time resolution data from samplers and total power detectors in place to allow auto-flagging.

P.NapierEVLA Advisory Comm, 14 Dec Committee Response (cont) RFI –Need for Algorithm Development. New AIPS autoflagging algorithm, new excision algorithm (EVLA Memo 86) developed. Phase II Issues. –Submit proposal ASAP. Proposal submitted April NSF Review underway. (see Perley talk)). –Include low frequencies if possible. Low frequencies removed from this proposal because technical concept not sufficiently developed.