Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
Optimisation of Roebel cable for HTS accelerator magnets
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
CARE08, Dec , G. de Rijk, The NED Conductor Review 1 The NED Conductor Review: Experience gained and outlook for future development Gijs de Rijk.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
CERN Accelerator School, Erice 2013 Tiepida-2 case-study 3: High field – large aperture magnet for a cable facility TiEpIdA2 design team: I. Mondino: Project.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
Preliminary analysis of a 16 T sc dipole with cos-theta lay-out INFN team October 2015.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
Lessons learnt from CERN experience
MQXF cable with RRP wires for Q2
CSP 25th November 2010 Technical agreement number 3: overview
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
CERN Conductor and Cable Development for the 11T Dipole
To be presented at Nb3Al R&D Review,
Procurement of Nb3Sn strand for coils assembled at CERN
MQXF cable with RRP wires for Q2
11T Dipole for the LHC Collimation upgrade
Presentation transcript:

Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement strategy Conductor choice, properties and procurement strategy Luc Oberli

Main characteristics of the FRESCA2 cable The cable was defined with the following requirements: The transport current has to be high enough to achieve with enough margin a central field of 13 T at 4.2 K in a large aperture dipole, but with a maximum current of 16 kA to be compatible with the power supply installed in the FRESCA test facility. The cable has to be flexible enough to facilitate the winding of the coil, not only for a block coil structure but also for a cos  dipole. The cable has to be produced with the cabling machine installed at CERN (maximum 40 spools). To satisfy all these requirements and for other reasons which will be given later in this presentation, the strand diameter was fixed to 1 mm and the number of strands to 40.

Main characteristics of the FRESCA2 cable Cable width(mm)21.4 Cable mid-thickness at 50 MPa(mm)1.82 Keystone angle(degree)0 Cable transposition pitch(mm)≈ 120 Number of strands(-)40 I C (12 T, 4.2 K)(A)31420 I C (15 T, 4.2 K)(A) T and 4.2 K-20 RRR after HT-> 120 Minimum cable unit length(m)260 Cable width calculated to compact only slightly the strands on the width. Nd/2cos  d The critical current of the cable is calculated taking into account a degradation of 10 % due to cabling.  

The cable has to be flexible enough to wind the coil having a bending radius as small as 45 mm and to make the jump between the 2 layers of each double-pancake. The reduction of the strand diameter to 1.0 mm has given a flexible cable. The transposition pitch of the cable was determined from cabling test done with Cu strands to have a cable mechanically stable. Main characteristics of the FRESCA2 cable

NEDFRESCA2 Strand diameter(mm) Sub-element diameter (  m) < 50 Copper to non-Copper volume ratio-1.25 J C (12 T, 4.2 K)(A/mm 2 ) J C (15 T, 4.2 K)(A/mm 2 ) T and 4.2 K-> 30 RRR (after full reaction)-> 200> 150 Piece length(m)> 1000> 400 Main characteristics of the strand Following the results obtained by the NED program on a strand of 1.25 mm in diameter, where only one supplier has been able to produce the conductor with 288 sub-elements and with a Jc around 1400 A/mm 2 at 15 T and 4.2 K, the performances of the strand in term of Jc have not been pushed too high.

Strand stability: an issue to avoid magnet quench at low field The stability of the Nb 3 Sn strand could be an issue with high Jc, large sub-element diameter and low RRR. Stability improves as strand diameter is reduced, as measured at 4.3 K on the RRP 54/61 strand having sub-element of ~ 80  m in diameter at a strand diameter of 0.8 mm. For this reason, the strand diameter was fixed to 1.0 mm as a compromise between the need to have a high transport current and the need to avoid magneto-thermal instabilities at low field. The sub-element diameter has also to be small enough to reduce the flux jumps at low fields and a maximum value of 50  m was specified.

Analysis of B. Bordini (CERN), conservative model used to predict the stability of a 0.8 mm strand with 80  m sub-element diameter Stability improves as the RRR of the strand is increased from around 8 to 120, it is beneficial both at 4.2 K and at 1.9 K. The RRR of the virgin strand has to be large enough to have some guaranty not to get “hot-spots” in the cable, in particular near the cable edge. RRR degradation over a length of ~ 1 mm is sufficient to create severe instability and to impair the current capability of the strand. For these reasons, the request on the RRR value is high. A minimum value of 150 was specified. Strand stability: effect of RRR

Bruker-EAS has developed for NED a 1.25 mm strand with 50  m sub- elements diameter achieving around 1400 A/mm 2 at 15 T and 4.2 K. OST has developed for LARP a 1.0 mm strand with 66  m sub-elements diameter achieving around A/mm 2 at 15 T and 4.2 K. Nb 3 Sn Strand Procurement strategy Two suppliers have the technology to develop a Nb 3 Sn strand (in a short time) meeting the specification for the FRESCA2 cable: Bruker-EAS and Oxford Superconducting Technology (OST). The procurement is divided in 3 steps: a 1 st step called “qualification phase” a 2 nd step called “pilot production” a 3 rd step for the full production The objective is to have at the end of the first 2 steps the qualification of the 2 suppliers.

Nb 3 Sn Strand Procurement strategy First Step: qualification phase A first order for 9 km of PIT strand placed by CERN to Bruker-EAS in March 2010 Three billets fabricated, one with round filaments and two with hexagonal filaments. Jc achieved: Jc(15T, 4.2K)  1350 A/mm 2 and Jc(12T, 4.2K)  2450 A/mm 2. Kilometer long strand piece lengths obtained. RRR  196 – 260 for the billet 09Y04 RRR  for the billet 09Y05 Magnet load line

Nb 3 Sn Strand Procurement strategy Second Step: pilot production 2 orders (2 X 15 km) will be placed by CEA to Bruker-EAS and OST Price enquiry sent in December 2010, deadline for answering end of January 2011 Minimum piece lengths required > 400 m RRR > 100 required to OST and RRR > 150 required to Bruker-EAS Two orders placed by CERN: 10 km of PIT strand placed to Bruker-EAS in August 2010 (delivery expected before June 2011) Strand with round filaments, RRR > 150 and minimum piece length > 150 m 10 km of RRP strand placed to OST in September 2010 (delivery expected before October 2011) Difficulties seen by OST to guarantee simultaneously Jc, RRR and long strand piece lengths for a strand of 1 mm in diameter with 50  m sub-element diameter. order accepted by OST with the following restrictions: RRR > 75 and minimum piece length > 150 m. First Step: qualification phase

Thank you for your attention ! Third Step: 35 km strand production On the basis of CERN order results, CEA will launch a 35 km strand production (mid of 2011) to one supplier. Nb 3 Sn Strand Procurement strategy

Critical Current SF+M Instability SF Instability Magnet Load Line Magnet Design Field At 4.2 K the combination of the Self-Field Instability with the Magnetization Instability at low fields is the most dangerous Magneto-Thermal Stability by courtesy of B. Bordini (CERN)