ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.

Slides:



Advertisements
Similar presentations
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Advertisements

CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
February 2012 CMWG Constraints Competitiveness Tests (CCT)
February 4, 2013 ERCOT Public ERCOT Update to CMWG NPRR463 and CARD Distribution Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Review of NPRR586 CMWG 1/7/2014. Existing Credit Lock Process ERCOT calculates a “preliminary allocated CRR transaction limit” based on “eligible” CRRAHs.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
February 7, 2013 ERCOT Public ERCOT CRR Calendar Proposal to TAC Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
1 Market Trials Update NATF June 1, 2010.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
November 5, 2012 ERCOT Public ERCOT CRR Update to CMWG Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
Congestion Management Working Group WMS update 11/7/2012.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
CMWG Update to WMS Report of CMWG Meetings of &
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
CRR Update to CMWG ERCOT CRR Team Congestion Management Working Group Aug 7, 2013.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
January 9, 2012 ERCOT Public ERCOT CRR Calendar Proposal to WMS Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
CMWG Update to WMS Report of CMWG Meeting of
1 Market Trials Congestion Revenue Rights Weekly Update May 28, 2010.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Retail Workshop ERCOT Nodal Update October 06, 2010.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
September 11, 2012 ERCOT Public ERCOT CRR Update to CMWG Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Market Trials Update NATF March 2,
Market Trials Congestion Revenue Rights
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
August 25, 2016 TAC Update to COPS
Southern Cross Directives Planning Items
ERCOT CRR Update to CMWG
ERCOT CRR Update to CMWG
Presentation transcript:

ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public

2 Study Assumptions Models used for analysis –CRR Auction – August 2013 case (dated 7/23/2012) Total load of approximately 74,000 MW –CRR Auction – April 2013 case (dated 8/17/2012) Total load of approximately 36,000 MW –Total load and distribution of load taken from SSWG cases (Spring Off-peak, Summer On-peak) –Entire topology considered, i.e. not outages on lines and transformers Constraints that were analyzed: –741 SCED historical constraints (Nodal Go-Live up to 8/17/12) –332 CSCs/CREs –Some constraints are in both lists –All constraints were analyzed in both directions ERCOT Public8/27/2012

3 Study Assumptions Previous studies were updated to reflect the latest decision making entity list (updated as of 8/17/12) –This affected mothballed Resources and Resources for which the decision making entity may have changed Only the decision making entity was considered for the studies, not the Affiliates For WGRs, the full capability was considered on the export side of the constraint and 0 MW was considered on the import side –The Resource can moved down to resolve the constraint, but cannot necessarily be moved up Similarly for DC Ties, the full capability was considered on the export side of the constraint and 0 MW was considered on the import side ERCOT Public8/27/2012

4 CCT Logic Options Previously Discussed – Option 1 Option 1 logic: –A constraint is “Competitive” if Constraint can not be overloaded under worst case scenario OR Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2500 –AND negative-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive” The results using option 1 logic can be found for each constraint in column AJ of the spreadsheet ERCOT Public8/27/2012

5 CCT Logic Options Previously Discussed – Option 2 Option 2 logic: –A constraint is “Competitive” if Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2500 –AND negative-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive” The results using option 2 logic can be found for each constraint in column AO of the spreadsheet ERCOT Public8/27/2012

6 CCT Logic Options Previously Discussed – Option 3 Option 3 logic: –A constraint is “Competitive” if Constraint can be overloaded under worst case scenario AND Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2500 –AND negative-SF ECI of squared SF with min(0.02, 1/3) threshold <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive” The results using option 3 logic can be found for each constraint in column AQ of the spreadsheet ERCOT Public8/27/2012

7 Results – Summer Peak Month (August 2013) Option 3 seems to be most aligned with Protocol 3.19(1) and grey- boxed (2) Please note that the same constraint may be in both the “SCED Historical” and “CSC/CRE” constraints list ERCOT Public8/27/2012 ECI Threshold OptionECI Threshold [2000,2500] Overload Flag Check OptionOption 1Option 2Option 3 Constraint SetModel Comp. or Non- Comp. CountPctgCountPctgCountPctg SCED HistoricalCRR Auction Competitive %342.3%171.1% Non-Competitive % % % CSC/CRECRR Auction Competitive % %284.2% Non-Competitive % % %

8 Results – Off-Peak Month (April 2013) ERCOT Public8/27/2012 ECI Threshold OptionECI Threshold [2000,2500] Overload Flag Check OptionOption 1Option 2Option 3 Constraint SetModel Comp. or Non- Comp. CountPctgCountPctgCountPctg SCED HistoricalCRR Auction Competitive %372.5%322.2% Non-Competitive % % % CSC/CRECRR Auction Competitive % % % Non-Competitive % % % Option 3 seems to be most aligned with Protocol 3.19(1) and grey- boxed (2) Please note that the same constraint may be in both the “SCED Historical” and “CSC/CRE” constraints list

9 Results – Constraints Competitive in Both Study Cases The currently grey-boxed Protocols have the following language: –“3.19.3Long-Term Constraint Competitiveness Test (1) The Long-Term CCT uses the monthly peak Load case for all calculations. The monthly peak case must include planned transmission and Resource Outages for the month. (2) A constraint is classified as competitive for the year if it is competitive with respect to all monthly cases for the year. A constraint is competitive for a monthly case if the constraint can be overloaded in the monthly case and it doesn’t meet any of the following conditions:…” For the purposes of this study, this would seem to mean that a constraint would only be competitive if it were shown to be competitive in both the April and August cases ERCOT Public8/27/2012

10 Results – Constraints Competitive in Both Study Cases Applying this logic for the 3 different options, the total number of competitive constraints is: –Option 1: 1311 competitive constraints –Option 2: 232 competitive constraints –Option 3: 44 competitive constraints A full list of the competitive constraints for each option can be found in the spreadsheet on the corresponding tab ERCOT Public8/27/2012

11 Timeline for Approving CCT List According to 3.19(6): “TAC shall approve the Competitive Constraints one month prior to the annual Congestion Revenue Right (CRR) Auction. …” Some key dates the for upcoming annual CRR Auction: –September 25, 2012 – ERCOT shall post the CRR Network Model for the 2013 (Year 1) Annual Auction –October 3, 2012 – ERCOT shall post the 2013 (Year 1) Auction Notice and Credit Submission Window Opens –October 25, 2012 – CRR Auction Bid Window Closes for the 2013 (Year 1) Annual Auction –October 26, 2012 – ERCOT shall post the CRR Network Model for the 2014 (Year 2) Annual Auction –November 5, 2012 – ERCOT shall post the 2014 (Year 2) Auction Notice and Credit Submission Window Opens –November 12, 2012 – CRR Auction Results posted for 2013 (Year 1) (will post earlier if completed and results verified) –November 26, 2012 – CRR Auction Credit Lock Date for 2014 (Year 2) Annual Auction –November 29, 2012 – CRR Auction Bid Window Closes for the 2014 (Year 2) Annual Auction –December 17, 2012 – CRR Auction Results posted for 2014 (Year 2) (will post earlier if completed and results verified) ERCOT Public8/27/2012