Revision Activity Log on to www.socrative.com 1. Click on ‘student log in’ 2. Enter room number 884712 Can use PC or mobile!

Slides:



Advertisements
Similar presentations
Break Even Michelle Hopkinson  Correctly calculate break even for a business provided  Correctly create break even charts for financial data provided.
Advertisements

National 4/5 Business Management
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 17 Budgetary Control.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
BPP UNIVERSITY COLLEGE BPP University College of Professional Studies Financial Performance- Revision session 4 th December 2012 BPP UNIVERSITY COLLEGE.
© 2012 Jones et al: Strategic Managerial Accounting: Hospitality, Tourism & Events Applications 6thedition, Goodfellow Publishers Chapter 9 The use of.
Problem – 10 (Profit Variance)(Factors contributing to change in profit) During , average prices increased over these of the previous year: i.20%
Standard Costing and Variance Analysis
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
Understanding & Managing Finance
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
CHAPTER 10: STATIC AND FLEXIBLE BUDGETS Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 10: Static and Flexible Budgets Cost Management,
Standard costing.
Forecasting and Budgeting
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Standard Costing and Variance Analysis
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
Costs & Break-Even GCSE Business Studies tutor2u™
Costs and Revenues The webinar will cover: Calculating contribution
MONITOR CATERING REVENUE AND COSTS
Absorption & Marginal Costing
Standard Costs Budget for a single unit
Chapter 23 Flexible Budgets and Standard Cost Systems
This test consists of 10 questions designed to test your understanding of methods of budgeting The links provide you with a choice of answer, along with.
1 Budgets and budgetary control Lecture 2 Semester B Dr. Haider Shah Dr. George H. Papadopoulos.
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Variance Analysis. What is it?  The term variance refers to the difference between the budgeted figure and the actual outcome.  If there is a variance.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Variance Analysis. Variance analysis Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity.
Use with Business Accounting and Finance Second Edition by Catherine Gowthorpe ISBN © 2005 Thomson Learning.
1 INTRODUCTION TO MANAGERIAL ACCOUNTING Lecture 3 & 4.
BUDGETS Question 1 What is the purpose of a budget? An objectiveCheap commodity Excess money Plan that outlines costs and revenue.
BUSS 1 Financial planning: using break- even analysis to make decisions.
F5 Performance Management. 2 Section D: Standard Costing And Variance Analysis Designed to give you knowledge and application of: D1. Budgeting and standard.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Comparison of Budget and Actual Achievement BUDGETS Key Definitions: Budgetary control: Involves comparing budgeted figures with actual figures and acting.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & Standard Costing E2. Functional budgets E4. Basic.
Variance Analysis. Within the context of management accounting, variance analysis studies differences between actual and budgeted figures and looks at.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
Actual Outcome or Income – Budgeted Outcome or Income FAVOURABLE Variance = good for the business, this means that the actual figures are better than.
Financial planning: break-even. Syllabus Candidates should be able to: define contribution and contribution per unit (selling price – variable cost per.
Mrs. Chathuri Senarath. Control technique that reports variances by comparing actual costs to pre-set standards so facilitating action through management.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Cost accounting Overheads.
Standard costing.
Operating Budgets: Manufacturing Budgets
Flexible Budgets & Performance Reports
Basics of financial management Chapter 12
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 15
Good or bad? Actual income was £500 less than budgeted for the period.
Financial and Non-Financial Measures of Operating Efficiency
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost and Management Accounting
Cost accounting Overheads.
Presentation transcript:

Revision Activity Log on to 1. Click on ‘student log in’ 2. Enter room number Can use PC or mobile!

AAT Level 3 Costs & Revenues

AAT Level 3 – Costs & Revenues Objectives: 1.Correctly explain what is meant by a budget. 2.Compare budget costs with actual costs, identifying variances. 3.Correctly identify when variances are significant. 4.Be able to suggest possible causes of variances. 5.Discuss the two different types of budgets (fixed and flexible). 6.Correctly calculate flexed budgets and analyse variances for management reports. 7.Prepare a full variance analysis using a fixed budget.

AAT Level 3 Costs & Revenues Fixed & Flexible Budgets & Variance Analysis

A financial plan.. that is prepared in advance Budget

Budget A financial plan.. that is prepared in advance Used to monitor costs and income Allows managers to control costs/income Cutting down on waste Eliminating unnecessary costs Changing suppliers Chasing debtors Why bother?

Adverse (Bad for business) What is a variance? Favourable (Good business) The difference between the comparative value and the actual value

Variance - The difference between the comparative value and the actual value Profit for the year 2013 averaged at £25,000 per week Profit for the year 2012 averaged at £55,000 per week Corresponding period Previous period Budget

Variances Adverse or Favourable? Adverse/Favourable results depend on the variance being considered BudgetActual Variance £120,000£125,000£5,000 Budget ActualVariance £120,000£125,000£5,000 Costs Income

Calculating Variances To calculate £ variance=A - B Where A = Actual figure B = Comparative figure (Budget, Previous, Corresponding)

Question 1: September Budget £ Actual £ Variance £ F or A Volume sold4000 units4200 units Sales revenue Less costs: Direct materials Direct labour Overheads31200 Operating profit F F A A 0

Question 2: October Budget £ Actual £ Variance £ Adv/ Fav Volume sold28000 units26000 units Sales revenue Less costs: Direct materials Direct labour Overheads Operating profit Answer

Question 2: October Budget £ Actual £ Variance £ Adv/ Fav Volume sold28000 units26000 units Sales revenue A Less costs: Direct materials A Direct labour F Overheads A Operating profit A

Variances – The Golden Rules To calculate £ variance=A - B To calculate the % variance =A – B X 100 B Where A = Actual figure B = Comparative figure (Budget, Previous, Corresponding) Remember!!! Never divide by the Actual figure!!!!! Hint: Identify & label your columns A & B first!!!

Tolerances An acceptable percentage variance from the comparative The business will only investigate variances outside the tolerance levels e.g. variances of 10% + Significant Not Significant

Budgets What may cause a variance?

Colman Toys Coleman Toys make traditional wooden toys for the overseas market.

Colman Toys Coleman Toys make traditional wooden toys for the overseas market. At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000.

Colman Toys Coleman Toys make traditional wooden toys for the overseas market. At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000. It is now year end and they have actually spent £180,000 on materials and £375,000 on labour.

Colman Toys Coleman Toys make traditional wooden toys for the overseas market. At the beginning of the year they estimated that their Direct Material costs would be £150,000 and their Direct Labour Costs £400,000. It is now year end and they have actually spent £180,000 on materials and £375,000 on labour. What may have caused these variances?

Causes of Variances Direct Materials Direct Labour Fixed Overheads Sales Revenue What factors may effect these costs?

Causes of Variances Direct Materials Direct Labour Fixed Overheads Sales Revenue Quality Wastage Cost Theft Specification change Pay rise Poor supervision Skill level Machines -Breakdown -Increase speed –Decrease speed Inflation Supplier change Stepped cost Price increase or decrease Volume sold

Causes of Variances Direct Materials Direct Labour Fixed Overheads Sales Revenue Quality Wastage Cost Theft Specification change Pay rise Poor supervision Skill level Machines -Breakdown -Increase speed –Decrease speed Inflation Supplier change Stepped cost Price increase or decrease Volume sold Solutions?

Budgets Fixed BudgetFlexible (Flexed) Budget ****Cost behaviours***

Question 3: September flexed budget Budget £ Flexed budget Actual £ Variance £ Volume sold4000 units 4200 units Sales revenue Less costs: Direct materials Direct labour Overheads31200 Operating profit I/D Fixed costs (Overheads) Selling price = /4000 = £40 Flexed = 4200 x £40 = Materials = 60000/4000 = £15 Flexed = 4200 x £15 = £ Labour = 32000/4000 = £8 Flexed = 4200 x £8 = £

Question 4: October flexed budget I/D Fixed costs (Overheads) Budget £ Flexed budget Actual £ Variance £ Volume sold28000 units units Sales revenue Less costs: Direct materials Direct labour Overheads Operating profit

Questions 5, 6 & 7

Question 8

Question 8a - Answer Total materials variance = Budgeted cost for actual output - actual cost (4 kg x £26 x 22200) = – = F Total direct labour variance = Budgeted labour cost for actual output – actual cost (2 hrs x £9.40 x 22200) = – = 3600 F Total fixed overhead variance = Fixed overheads budgeted – actual (21400 units x 2 x £9.40) = – = 3860 F

Question 8b

Variance Reconciliation Statement Fixed budget profit Variances: Sales volume (B Profit – F Profit) Selling price (A Sales – F Sales) Labour (A Labour – F Labour) Materials (A Materials – F Materials) Fixed costs Actual profit

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales) Labour (A Labour – F Labour) Materials (A Materials – F Materials) Fixed costs Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales) Labour (A Labour – F Labour) Materials (A Materials – F Materials) Fixed costs Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 Labour (A Labour – F Labour) Materials (A Materials – F Materials) Fixed costs Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 Labour (A Labour – F Labour)78,000-78,000 =0 Materials (A Materials – F Materials) Fixed costs Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 Labour (A Labour – F Labour)78,000-78,000 =0 Materials (A Materials – F Materials) 58,500 – 52,000 =6,500 Fixed costs Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 Labour (A Labour – F Labour)78,000-78,000 =0 Materials (A Materials – F Materials) 58,500 – 52,000 =6,500 Fixed costs35,000 – 39,500 = 4,500 Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 A Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 F Labour (A Labour – F Labour)78,000-78,000 =0 0 Materials (A Materials – F Materials) 58,500 – 52,000 =6,500 A Fixed costs35,000 – 39,500 = 4,500 A Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 A Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 F Labour (A Labour – F Labour)78,000-78,000 =0 0 Materials (A Materials – F Materials) 58,500 – 52,000 =6,500 A Fixed costs35,000 – 39,500 = 4,500 A (14,500) Actual profit Variance Reconciliation Statement

Fixed budget profit105,000 Variances: Sales volume (B Profit – F Profit)105,000-95,000 =10,000 A Selling price (A Sales – F Sales)266,500 – 260,000 =6,500 F Labour (A Labour – F Labour)78,000-78,000 =0 0 Materials (A Materials – F Materials) 58,500 – 52,000 =6,500 A Fixed costs35,000 – 39,500 = 4,500 A (14,500) Actual profit90,500 Variance Reconciliation Statement

Question 9 – Green Ltd

Practice Questions Complete practice questions 10 – 18 in your Excel workbook. completed workbook to: