SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Charles Nola Lisa Blue June 21, 2006 Charles Nola Lisa Blue June 21, 2006 Crew Launch Vehicle (CLV) Upper Stage Avionics & Software Acquisition Planning.
Systems Engineering in a System of Systems Context
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
The program work breakdown structure (WBS) establishes the essential
The BIM Project Execution Planning Procedure
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Integrated Capability Maturity Model (CMMI)
LISA Programme Jan 20, 2005 – LISA France.A.Gianolio – LISA status - 1 LISA Status LISA France College de France January 20-21, 2005 A. Gianolio LISA Project.
S/W Project Management Software Process Models. Objectives To understand  Software process and process models, including the main characteristics of.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
1 LISA Science and Concept Robin T. Stebbins. 2 May 13, 2003 LISA Overview The Laser Interferometer Space Antenna (LISA) is a joint ESA- NASA mission.
NextGen: Changes to Strengthen Validation and Verification Jay Merkle Director, Enterprise System Integration October, 2011.
The Challenge of IT-Business Alignment
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Government Procurement Simulation (GPSim) Overview.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Requirements Development in CMMI
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
Constellation Space Transportation Planning Office July 30, 2009.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
LISA News from ESA O. Jennrich LISA Project Scientist.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
Export Compliance Laboratory Outreach Practices Rachel Skinner Office of Export Compliance Jet Propulsion Laboratory
1 Integrated Modeling Stephen Merkowitz. 2 May 13, 2003 Integrated Modeling LISA has intricate interactions between subsystems that require an integrated.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
Building Systems for Today’s Dynamic Networked Environments A Methodology for Building Sustainable Enterprises in Dynamic Environments through knowledge.
Office of Major Project Development (OMPD) Overview November 2015.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
LISA Laser Interferometer Space Antenna: The Mission Mike Cruise For the LISA Team.
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
Systems Analysis and Design in a Changing World, 4th Edition
CS4311 Spring 2011 Process Improvement Dr
IEEE Std 1074: Standard for Software Lifecycle
Enterprise Content Management Owners Representative Contract Approval
Data Integrity Leadership Institute
Defining the Activities
Assist. Prof. Magy Mohamed Kandil
Engineering Processes
Systems Engineering Management
By Jeff Burklo, Director
Systems Engineering for Mission-Driven Modeling
Introduction to Systems Analysis and Design Stefano Moshi Memorial University College System Analysis & Design BIT
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
Requirements Development in CMMI
Presentation transcript:

SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw

2 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 LISA Overview The Laser Interferometer Space Antenna (LISA) is an exciting science mission designed to detect gravitational waves from space – Provides an ability to view the Universe in a way we never saw before! The mission consists of three drag- free spacecraft nominally forming an equilateral triangle with 5 million kilometer arms. The constellation is placed in a heliocentric orbit Spacetime strains induced by gravitational waves are detected by measuring changes in the separation between masses using laser interferometry LISA is a joint NASA-ESA mission which enters Formulation in the summer of 2003 and launches in 2011

3 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Organizational Chart Drivers LISA’s science is unique – Detecting gravitational waves from space LISA’s partnering agreement is unique – The mission is an equal partnership between NASA and ESA LISA’s system engineering is unique – The three spacecraft functioning as one system constitutes the measurement system. LISA is one integrated system. – The systems perspective is essential throughout the entire lifecycle

4 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Project Roles & Responsibilities Roles and responsibilities are assigned on the strengths of each partner NASA/ GSFC emphasis is on: – Project management – System engineering – Software management – Observatory and constellation I&T – Launch vehicle procurement & processing JPL emphasis is on: – Mission Science – Payload management – Payload components and payload integration – Operations ESA emphasis is on: – Three Spacecraft – Three Propulsion Modules – Key payload components – Intermediate payload integration

5 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Organizational Chart C - 5

6 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Systems Engineering Office The System Engineering Office (SEO) is responsible for ensuring system level coherence of all design and developmental activities of all project elements and ensures technical coherence of the LISA mission. System engineering capabilities are located within several Project elements, but their technical activities are coordinated through ONE System Engineering Team The SEO is responsible for the technical integrity of the mission including: systems, payload, spacecraft, ground system, and launch vehicle. NASA and ESA share the management of the SEO however, NASA/GSFC has the lead for day-to-day activities. SEO employs Integrated Technical Teams (ITT) and the Integrated Systems Team (IST) to facilitate collaboration between NASA and ESA

7 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Integrated Systems Team The Integrated Systems Team accommodates the interests of both NASA and ESA Allows LISA to capitalize on the expertise in the US and Europe Is located within the SEO and co-chaired by the NASA/ESA System Engineering Managers Comprised of 6 scientists and 6 engineers from GSFC, JPL, ESA, and ESA member states. The IST is a cohesive technical team that assists the SEO in orchestrating the evolution of the design throughout all phases of the mission. IST supports the SEO with technical decisions

8 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 Integrated Technical Teams Integrated Technical Teams (ITT) accommodate each partner’s interest Allows LISA to capitalize on the expertise in the US and Europe Integrated teams comprised of relevant members from NASA, ESA, and both SE&I contractors During formulation, ITT’s emphasis is on design and definition During implementation, emphasis shifts to monitoring progress of the development, evaluating potential changes, and maintaining previously established ICD’s Examples may include Operations, Mission Design, DRS, etc.

9 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 SE&I Contractor NASA SE&I contractor provides support to the GSFC SEO and the JPL Payload Office throughout the project lifecycle – Tasks may include requirements flow down, system verification and validation, interface definition and management, operations concept definition, design definition, software system engineering and risk management – In addition, the SE&I contractor may be responsible for payload and observatory integration and test, knowledge management systems, ground support fixtures and simulators, and development of mission software Major role of SE&I contractor is the staffing and coordination of the ITTs

10 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 = Critical Path = Major Milestone = TRL = Launch Legend LISA Project Master Schedule

11 SE&I Pre-Proposal Meeting SE&I Pre-Proposal Meeting – May 13, 2003 System Engineering Challenges Coordination of engineering efforts given the multiple teams located in multiple countries. Hardware components from multiple facilities including NASA, Universities, Industry, ESA, and European Member States The Systems Engineering Office must have insight and track technical progress at a much lower level than previously done on NASA missions. The three spacecraft must act as ONE system. The technical and organizational integrated nature of LISA calls for a unique System Engineering organization.