10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.

Slides:



Advertisements
Similar presentations
C2 to C5 fit up review-R41 Review of MC Type C to C assembly clearances with C2 to C5 shell surface interface details 12/19/06 Rev 4.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Vacuum Vessel Production Readiness Review
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
Pre-Lehman Review Briefing Reiersen December 18, 2006.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Preparations for working on Station 1 November 22, 2005.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 FPA Stage 2 MC Flange Assembly Issues and Design Proposals June 20, 2006 T. Brown.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
NCSX Vacuum Vessel Fabrication
ProtoDUNE – DSS Installation, Alignment and QA
On the accuracy of port assembly at Wendelstein 7-X
GLAST Large Area Telescope:
Cryomodule Assembly Plan
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager

10/31/2007Mike Viola2 FPA is Accomplished in Four Stages Station 1 – Vacuum Vessel (VV) Prep Station 2 – Modular Coil Half Period (MCHP) Assembly Station 3 - MCHP installation over VV Period Station 5 - Final Assembly in NCSX Test Cell Station 6 – Final Machine Assembly – Erik Perry

10/31/2007Mike Viola3 FPA Process Definitions FPA Manufacturing, Inspection, Test, Quality Assurance Plan (MIT/QA) Complete –Input (Station specific): Dimensional Control Plan (Art Brooks) FPA Assembly Sequence Plan (Tom Brown) FPA Specification and Assembly Drawings (Mike Cole) –MIT/QA Plan provides basis for individual procedures to perform tasks then revised to include developed improvements. FPA Procedures –FPA station 1 procedure is complete and active –FPA station 2 trials are providing input to procedure development

10/31/2007Mike Viola4 Design Philosophy We carefully assure that our designs are adequate. –Utilize outside reviewers to participate in design reviews –Complete designs early to minimize configuration changes not rely on concurrent engineering as much during assembly phase We schedule time to test the designs in advance. –Added trials to discover problems BEFORE the critical path. E.g. Added stud tension, bushing, and nose weld trials –Measure all modular coils in advance of assembly developed new alignment techniques We allow time to reinforce tooling or make adjustments as needed.

10/31/2007Mike Viola5 NCSX Vacuum Vessel Station 1 97% Complete VV #1 and VV #2 98% Complete VV #3 95% Complete Cooling tube testing and final scans remain VVSA with ports welded VV #1 VV #2 VV #3 complete

10/31/2007Mike Viola6 Station 2 Trials are Successful Station 2 FPA trials were enhanced and are well in progress: Gross fit individual mating coils found a few minor interferences Joint design trials for Station 2 (useful for Station 3 also): Install and torque bolts – assess accessibility SUCCESSFUL Develop shim technique SUCCESSFUL Pillow shims SUCCESSFUL New welded design for inboard interface (nose) SUCCESSFUL –Install Alumina coated metal shims Shims on order

10/31/2007Mike Viola7 Station 2 Assembly Sequence Preparation Steps/ Major Activities MC Fit-up Check Verify will come together (Gross Fit-ups) Pre-Measurement of MHCP Type A/B/C Coil Flanges & Interfacing Type A Coil Flange Individual coils have been racked into proper shape. (within +/-.005”) Alumina Shim Sizing & Preparation –Measure shim thicknesses to arrive at a satisfactory shim set for MCHP assembly. Potential Issues and Mitigation Plans Tooling not rigid enough – RETIRED –wedges determined to be adequate Coils still too flexible – RETIRED –physically racked (twisted) coils to re- establish their coordinate system Alignment not within tolerances bars- RETIRED –successfully met requirements Nose

10/31/2007Mike Viola8 Station 2 Assembly Sequence A-B Modular Coil Assembly Steps/Major Activities Rack A coil & measure fiducials. lower B coil into place onto outboard shims Measure shim puck height with bore gauge Install nose shear plates & lightly tack weld Lift B & flip to ready for nose welding. Establish A & B coil fiducials – weld flex shims to plasma side both coils, recheck fiducials. Back Office assess part for compliance. Place B coil back on A coil and align Install alumina shims and bushings Weld A/B nose region solenoid side & re-measure. REPEAT FOR C TO A-B ASSEMBLY

10/31/2007Mike Viola9 Station 2 Assembly Sequence A-B Modular Coil Assembly Potential Issues and Mitigation Plans Alignment not within tolerances - RETIRED –Able to achieve +/-.005” lock-in Weld distortion excessive –Install wing chairs to offset distortions –If required, coil welds can be ground out & coil separated

10/31/2007Mike Viola10 Station 2 Assembly Sequence Final Assembly Steps/Major Activities Inflate All Shim Bags Complete Local Services & Interface Details –Install sealant to fill all shim spaces to trap VV/MC insulation. Final Measurements and transfer to MCHP holding area.

10/31/2007Mike Viola11 Station 3 Assembly Sequence Potential Issues and Mitigation Plans Tooling not rigid enough –Reinforce/redesign tooling if necessary Left or Right MCHP changes shape –Back Office review changes & provides new left to right MCHP orientation Pre-Assembly Steps/Major Activities Pre-Installation Set-Up –Install monuments, floor mounted tracks & Vacuum Vessel base support, measure MCHP CG –Anchor tooling (floor mounted tracks, support carts, adjuster bar, temporary scaffolding, etc. Pre-Assembly of Left MCHP –Establish global coordinate system and install laser screens. –Measure MCHP in vertical orientation, including A-A flange –Perform Metrology and align MCHP support cart assembly MCHP Left side Vacuum Vessel Support

10/31/2007Mike Viola12 Station 3 Assembly Sequence Pre-Assembly Steps/Major Activities Install Laser Screens Perform Dry Runs with MCHPs Inboard screens Right screen Floor mounted screen Left screen Floor mounted screen

10/31/2007Mike Viola13 Station 3 Assembly Sequence Assembly Steps/Major Activities Install VV NBI support stand & install VVSA to base support structure. Using metrology, take tooling ball readings to properly position VVSA to global coordinate system. MCHP support cart assembly MCHP fixed support assembly VV lateral support NBI Port VV base support

10/31/2007Mike Viola14 Station 3 Assembly Sequence Potential Issues and Mitigation Plans Components damaged during assembly (highly unlikely due to very slow motion). –remove MCHP from vessel & repair damaged component with existing spare component e.g. cooling tube or clamp. Weld distortion excessive –Install wing chairs to offset distortions –If required, coil welds can be ground out & coil separated Assembly Steps/Major Activities Install Left then Right MCHP over VVSA Weld Inboard Shims and re- measure alignment

10/31/2007Mike Viola15 Station 5 Assembly Sequence Potential Issues and Mitigation Plans Floor not stiff enough –Will be tested in advance with a concrete block; reinforcing can be added to substructure –Photogrammetry will allow a bundle adjustment independent of the floor. Pre-Assembly Steps/Major Activities Pre-Installation Set-Up –Install period support fixture –Install FPA on support stand & engage base of MC. –Install internal & external working platforms FPA lowered onto support stand FPA support stand with lower trim coil

10/31/2007Mike Viola16 Station 5 Assembly Sequence Potential Issues and Mitigation Plans Difficulty of welders working inside VV in contorted positions may pose ergonomic & confined space hazards –Ergonomic / confined space hazards – prior Job Hazard Analysis (JHA) will consider all hazards Leak check fails on one or more ports –Identify leak point (s), repair weld and re-test Assembly Steps/Major Activities VV Port Installation –Install circular ports. –Install domes, inserting the long port through the MC hole opening & weld dome shell to VV. –Leak check all port welds. 1” – 2” clearance around all ports

10/31/2007Mike Viola17 Station 5 Assembly Sequence Assembly Steps/Major Activities Trim Coil Installation –Install trim coils - mounted to the MC shells using local field fit support brackets There are four different trim coil sizes.

10/31/2007Mike Viola18 Station 5 Assembly Sequence Right & Left TF Coil Assembly Steps/Major Activities Attach temporary supports, disengage base of MC, & install TF support brackets Slide TF assemblies against TF support brackets one at a time Install machine support plates & re-engage base of MC Temporary end support simplified with two TF coils) Right side leveler pad with intermediate support removed

10/31/2007Mike Viola19 Station 5 Assembly Sequence Assembly Steps/Major Activities Advanced TF Fit-Up Checks Install TF support brackets on the sides of the coils, both on the top of the MC and on the bottom.

10/31/2007Mike Viola20 Station 5 Assembly Sequence Final Assembly Steps/Major Activities Tack Weld Ports 4’s Install PF Structural Members Route MC leads and coolant lines Install MC Coolant Manifold Install Rogowski Coils on end of VV Port 4 MC coolant manifold

10/31/2007Mike Viola21 Station 5 Assembly Sequence Potential Issues and Mitigation Plans Final measurements not within tolerances –Project assess steps necessary if unable to accept out-of-tolerance conditions Final Assembly Steps/Major Activities Final Measurements –Obtain set of Period 1 alignment fiducials for locating VV within the MC –Using monuments on VV for alignment, perform trial VV alignment, adjusting VV supports as necessary. –Make final measurement of all fiducials, VV end flanges, & Type C end flanges REPEAT FOR PERIODS 2 & 3

10/31/2007Mike Viola22 Summary Station 1 vacuum vessel segments are nearly complete. Station 2 modular coil assembly trials are well underway, most risks are retired, and assembly steps are well defined. Station 3 installing the modular coil half period assembly over the vacuum vessel and Station 5 final field period assembly sequence plans have been developed in detail and include the necessary metrology and trial elements. We have a credible plan to assemble the field periods to the accuracy required. I have confidence in successfully performing the Field Period Assembly activities.