System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
1 Lecture 3.2: Technical Reviews and Audits (SEF Ch 11) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Systems Engineering and Parts Management
Project Management Process Overview
SEE OTRR LONG-RANGE PLANNING CHECKLIST SEE OTRR PLANNING CHECKLIST SEE OTRR PRE-REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE At OTRR, the.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Business, Cost Estimating & Financial Management Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Sample Fit-Gap Kick-off
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
MNS - Mission need statement
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
NAVAIRINST D.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
Milestone A to Milestone B Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 2 Tollgate Review Discussion Template
Information Required for Milestone and Decision Reviews
Phase 1 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
The Department of Defense Acquisition Process
Presentation transcript:

System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review Planning Process Initiate Acquisition Coordination Team (ACT) Planning Conduct ACT Meetings Plan and schedule JROC, OIPT, DAB (if required) Begin Program Decision Brief Updates Notify Participants Documentation Updates CDD, Acquisition Strategy, TEMP, CARD, Threat, APB Mature Design for Testing System Integration Exit Criteria Satisfied System Integration Completed Complete and Submit Program Decision Brief DRR Decision Brief With PEO DRR Decision Brief With MDA PEO Approve Exit Criteria ACAT III and IV MDA Approve Exit Criteria ACAT I and II START System Integration status validated based on CDR results Coordinate with SECDEF Coordinate with SECNAV Coordinate with OPNAV Coordinate with SYSCOM Schedule DRR Decision Meeting DT & E Plans Complete & Provided Cost, Schedule Performance Trade Off Analysis FINISH SEE DESIGN READINESS REVIEW PLANNING CHECKLIST SEE DESIGN READINESS REVIEW PRE-REVIEW CHECKLIST SEE DESIGN READINESS REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE CAPABILITIES DEVELOPMENT DOCUMENT ACQUISITION STRATEGY APB SYSTEM INTEGRATION EXIT CRITERIA TEST PLANS (Especially for DT&E and IOT & E) CCA Requirements ADEQUACY OF RESOURCES (Manpower and Funding) ICE AND MANPOWER ESTIMATE (10USC2434) UPDATED C4ISR SUPPORT REQUIREMENTS ISP UPDATE TEMP TECHNOLOGY READINESS ASSESSMENT SEE DoDI ENCLOSURE (3) for additional requirements At DRR, the MDA typically emphasizes validation of the following: -ENTRY/EXIT CRITERIA FOR DRR HAVE BEEN MET - APPROVAL FOR SYSTEM DEMONSTRATON EFFORTS - EXIT CRITERIA FOR NEXT PHASE ESTABLISHED 30 DAYS (PRE-REVIEW PHASE) LONG-RANGE (PLANNING PHASE) ~1 DAY (REVIEW PHASE) EXIT CRITERIA FOR SYSTEM INTEGRATION SATISFIED BEGINNING OF SYSTEM DEMONSTRATION BEGINNING OF PHASE B 180 DAYS CONFIRM AVAILABILITY OF PRINCIPLES For proposed briefing date ENTRY CRITERIA FOR SYSTEMS INTEGRATION SATISFIED CONDUCT THE DRR PRE-BRIEF (Closed Sessions) REVIEW DRR PRE-REVIEW CHECKLIST 6 MONTHS (PLANNING PHASE) TIMELINE ~ Event Driven BETWEEN MILESTONE B and DRR PEO C4I and SPACE DESIGN READINESS REVIEW (DRR) TIMELINE PHASES MS B DRR ADM PEO C4I and SPACE ACQUISITION PROGRAM STRUCTURE GUIDE ENCLOSURE (14) Page T-1 VERSION 3.0 February 2004 NOTE: Design Readiness Review (DRR) is a discretionary review conducted after Milestone B and signifies the end of System Integration and the start of System Demonstration. Refer to DoDI , Para and SECNAVINST C, Para for Design Readiness Review requirements. PROCESS SYSTEM INTEGRATION This effort, which is the first effort of the SDD phase, is intended to integrate subsystems, complete detailed design, and reduce system-level risk. SEE DESIGN READINESS REVIEW LONG-RANGE PLANNING CHECKLIST Draft ADM (Ready for System Demo / DT & E initiation / Entry/Exit Criteria Meant) BEGINNING OF DRR PLANNING PHASE REVIEW DRR CHECKLIST & PEO MAJOR REVIEW CHECKLIST CONDUCT ACT MEETING – Obtain consensus to proceed. ( minutes to ACT Participants) DAYS DRAFT ACT CHARTER DAYS PREPARE EXIT CRITERIA FOR SYSTEM INTEGRATION AND ANY ANTICIPATED ISSUES WITH RESPECT TO SYSTEMS ACQUISITION ACTIVITIES 90 DAYS DRAFT BRIEF AND ADM 90 DAYS 30 DAYS SCHEDULE PRE-BRIEF AND BRIEF VIA ACQUISITION WEBSITE AND PEO FRONT OFFICE CALENDAR 30 DAYS ENSURE THE PDR AND CDR HAVE BEEN COMPLETED 30 DAYS ENSURE SYSTEMS ACQUISITION ACTIVITIES HAVE BEEN INITIATED 30 DAYS SEND PRE-BRIEF TO ACT MEMBERS FOR REVIEW 20 DAYS 7 DAYS SEND FINAL BRIEF AND ADM TO ACT FOR REVIEW 5 DAYS 30 DAYS REFINE AoA PLAN, AS, CDD, ICD, TDS, AND TEMP DAYS