2 nd POCPA Workshop CERN, 14-16 June 2010 magnet power converters for a IV Generation Light Source Roberto Visintini Denis Molaro Sincrotrone.

Slides:



Advertisements
Similar presentations
Denis Molaro – Sincrotrone Trieste Elettra digital control PS Bipolar digital control 30 A – 20 V PS Denis Molaro POCPA3 – DESY, May 21-23, 2012.
Advertisements

FEL and linac plans at MAX IV laboratory
An Introduction to Intronics Power Inc. New High Density DC/DC Converter W30 Series Intronics Power Inc Providence Highway Norwood MA
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
1 Enhancements to the Linac Coherent Light Source.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
1 Modular DC/DC Converter. 2 PSC W Standard 19“ rack 4U – 6 prewired slots (single DC input/output connection for each unit)
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
14 th CBM Collaboration Meeting Split 2009 Status of Front End Electronics N-XYTER PCB & Power Supply Volker Kleipa, GSI Darmstadt.
15. CBM Collaboration Meeting, GSI, Darmstadt, April 12–16, 2010 Status of Front End Electronics N-XYTER PCBs & Power Supply Volker Kleipa, GSI Darmstadt.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
W.S. Graves1 Seeding for Fully Coherent Beams William S. Graves MIT-Bates Presented at MIT x-ray laser user program review July 1, 2003.
Low Emittance RF Gun Developments for PAL-XFEL
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Winni Decking XFEL Beam Collimation and Switchyard Review Introduction FEL-Beam-Dynamics Group
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
L 30 Electricity and Magnetism [7] Electromagnetic Waves –Faraday laid the groundwork with his discovery of electromagnetic induction –Maxwell added the.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
Laboratory for Low-Power Management and Integrated SMPS 1 Power Stage Parameter Estimation and Digital Controller Design for SMPS with the Use of Limit.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
3rd Workshop on Power Converters for Particle Accelerators (POCPA) 2012 PETRAIII Extension digital regulation Constant current oscillations AC load Number.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Laser-Undulator Compact X-ray source (LUCX) POSIPOL2006 Workshop at CERN 1/23 Experimental Plan of X-ray Generation using Optical Resonator using Optical.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
1 REPORT Simone Spampinati on behalf of the FERMI team.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
X-band Based FEL proposal
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
ECE445: Senior Design Spring 2015 Team 17: Weather Jukebox Sang Yun Bang, Thomas Fedrigon, Shanda Lu.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Marco Lonza – and Elettra Status Tango Meeting, May 26-27, and Elettra Status Marco Lonza.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
CERN LHC RF Power Systems
Magnet Power Supply POCPA 2016 Briant Lam May 24-26, 2016.
CALIFES A proposed electron beam test facility at CERN
EUROTeV Diagnostics WP5
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Timing and synchronization at SPARC
Tango status at Elettra
DC Injector and Space Charge Simulation Status
POCPA5 POwer Converters for Particle Accelerators
Electronics requirements for special diagnostics for the XFEL
Junji Urakawa (KEK) for ATF International Collaboration
Advanced Research Electron Accelerator Laboratory
Summary of Beam Cooling Parallel Session
Elettra – Sincrotrone Trieste S.C.p.A.
Experience with photoinjector at ATF
Presentation transcript:

2 nd POCPA Workshop CERN, June 2010 magnet power converters for a IV Generation Light Source Roberto Visintini Denis Molaro Sincrotrone Trieste

R. Visintini D. Molaro - Sincrotrone Trieste 2 nd POCPA – June FERMI Structure Photocathode Gun &LINAC Undulators (FEL) & Experimental Hall ~365 m Above Ground Under Ground (-5 m) ~195 m ~170 m

R. Visintini D. Molaro - Sincrotrone Trieste 2 nd POCPA – June LINAC Photoinjector generate electrons Photoinjector generate electrons Electrons are accelerated up to 1.7 GeV by 15 accelerating sections Electrons are accelerated up to 1.7 GeV by 15 accelerating sections

R. Visintini D. Molaro - Sincrotrone Trieste 2 nd POCPA – June E-BEAM TRANSPORT A diagnostic beam dump (measuring beam characteristics) A diagnostic beam dump (measuring beam characteristics) Spreader section to send electrons either to FEL1 or FEL2 Spreader section to send electrons either to FEL1 or FEL2

R. Visintini D. Molaro - Sincrotrone Trieste 2 nd POCPA – June UNDULATOR HALL 9 undulators for FEL1 (Wavelength= 100 – 20 nm) 9 undulators for FEL1 (Wavelength= 100 – 20 nm) 13 undulators for FEL2 (Wavelength= 20 – 30 nm) 13 undulators for FEL2 (Wavelength= 20 – 30 nm) Main beam dump Main beam dump

R. Visintini D. Molaro - Sincrotrone Trieste 2 nd POCPA – June POWER SUPPLIES REQUIREMENTS Power Supplies Status (June 2010) Type/model# (with FEL2+)Installed A A Argantix XDS Argantix XDS Danfysik V/500A2 Danfysik Delta SM 52-AR-6011 Delta SM15/10055 Delta SM15/40044 Lambda Gen Lambda Gen Lambda Gen Lambda Gen EEI 55/75021 TransTechnik 25/7502 TOTAL Installed = placed in the rack Percentage vs. TOTAL38% Ready = Fully tested (mag+int'lk) Ready vs. TOTAL27%

R. Visintini D. Molaro - Sincrotrone Trieste A2605 Output Current Range: -5/+5 ADC Output Current Range: -5/+5 ADC Output Voltage Range: -15/+15 VDC Output Voltage Range: -15/+15 VDC Output Current Resolution: 16 bit Output Current Resolution: 16 bit Accuracy: 30 ppm/FS Accuracy: 30 ppm/FS Long Term Stability: 50 ppm/FS Long Term Stability: 50 ppm/FS Max Ripple: 30 ppm/FS Max Ripple: 30 ppm/FS 2 nd POCPA – June 2010 Cooling: forced air Cooling: forced air Communication: Ethernet TCP or UDP Communication: Ethernet TCP or UDP Current update rate: 100Hz Current update rate: 100Hz Bandwidth-3dB 2Ω load): 1KHz Bandwidth-3dB 2Ω load): 1KHz Digital control loop Digital control loop Efficiency DC/DC stage: 90 % Efficiency DC/DC stage: 90 %

R. Visintini D. Molaro - Sincrotrone Trieste A2620 Output Current Range: -20/+20 ADC Output Current Range: -20/+20 ADC Output Voltage Range: -22/+22 VDC Output Voltage Range: -22/+22 VDC Output Current Resolution: 16 bit Output Current Resolution: 16 bit Accuracy: 30 ppm/FS Accuracy: 30 ppm/FS Long Term Stability: 50 ppm/FS Long Term Stability: 50 ppm/FS Max Ripple: 30 ppm/FS Max Ripple: 30 ppm/FS 2 nd POCPA – June 2010 Cooling: forced air Cooling: forced air Communication: Ethernet TCP or UDP Communication: Ethernet TCP or UDP Current update rate: 100Hz Current update rate: 100Hz Bandwidth-3dB 2Ω load): 1KHz Bandwidth-3dB 2Ω load): 1KHz Digital control loop Digital control loop Efficiency DC/DC stage: 95 % Efficiency DC/DC stage: 95 %

R. Visintini D. Molaro - Sincrotrone Trieste Commercial PS TDK-Lambda and Argantix have had problems of oscillation under inductive load TDK-Lambda and Argantix have had problems of oscillation under inductive load Fast fix from the manufactures/dealers Fast fix from the manufactures/dealers Delta almost no problems Delta almost no problems 2 nd POCPA – June 2010

R. Visintini D. Molaro - Sincrotrone Trieste Time schedule 2 nd POCPA – June 2010

R. Visintini D. Molaro - Sincrotrone Trieste END Thank you 2 nd POCPA – June 2010