Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May 2008 1 Commissioning of the ATLAS Experiment Jϋrgen Thomas (University of Birmingham, UK)

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

TRT LAr Tilecal MDT-RPC BOS Pixels&SCT 1 The Atlas combined testbeam Thijs Cornelissen, NIKHEF Jamboree, Nijmegen, December 2004.
B-tagging, leptons and missing energy in ATLAS after first data Ivo van Vulpen (Nikhef) on behalf of the ATLAS collaboration.
1 Japanese activities in LHC Takahiko Kondo, KEK November 28, 2005 KEK-DESY 1st Collaboration Meeting in Tokyo.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Pascal PERRODO, ATLAS-LAPP
The ATLAS B physics trigger
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
ATLAS detector commissioning with cosmics and first beam Alessandro Cerri on behalf of the ATLAS collaboration.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
. APS meeting April 14 h, ATLAS Detector – status and plans David Lissauer Brookhaven National Lab. ATLAS Technical Coordination APS meeting April.
The digitization procedure occurs separately for each Muon technology, MDT, CSC, RPC and TGC. Here the main steps of each MuonHits to Muon Digits conversion.
1 ATLAS installation: Status about 3 years ago…. 2 ATLAS installation: Status half a years ago…
Taming the beast: Using Python To Control ATLAS Software David Quarrie NERSC Division Lawrence Berkeley National Laboratory 3 July 2006.
The Large Hadron Collider project is a global scientific adventure, combining the accelerator, a worldwide computing grid and the experiments, initiated.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Manoj Kumar Jha INFN – Bologna On Behalf of ATLAS Muon Calibration Group 20 th October 2010/CHEP 2010, Taipei ATLAS Muon Calibration Framework.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Muon-raying the ATLAS Detector
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
January 21, 2003 Transition from the Construction Project to Pre-Ops and Operations Howard Gordon.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS, ATLAS through first data Fabiola Gianotti (on behalf of the ATLAS Collaboration)
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
Precision Drift Chambers for the ATLAS Muon Spectrometer
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
Status of the ATLAS first-level Central Trigger and the Muon Barrel Trigger and First Results from Cosmic-Ray Data David Berge (CERN-PH) for the ATLAS.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
1 Cosmic commissioning Milestone runs Jamie Boyd (CERN) ATLAS UK Physics Meeting-- J Boyd Jan
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Establishing large international research facilities: the HEP case 1st ASEPS Summit Tsukuba March 25, 2010 Sergio Bertolucci CERN LHC.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Searching for Compositeness with ATLAS Kaushik De University of Texas at Arlington For the ATLAS Collaboration DPF/JPS 2006, Hawaii November 1, 2006.
ATLAS as an example of a large scientific collaboration
Depleted CMOS Pixel Detectors
ATLAS through first data
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Integration and alignment of ATLAS SCT
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
The First-Level Trigger of ATLAS
ATLAS Silicon Tracker commissioning
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Commissioning of the ATLAS Experiment Jϋrgen Thomas (University of Birmingham, UK) for the ATLAS Collaboration HCP2008: 19th Hadron Collider Physics Symposium 2008 Galena, IL, USA

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Outline: Introduction Calorimetry Muon Detectors Inner Tracking Detectors Trigger/DAQ Looking ahead

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Introduction

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Albany, Alberta, NIKHEF Amsterdam, Ankara, LAPP Annecy, Argonne NL, Arizona, UT Arlington, Athens, NTU Athens, Baku, IFAE Barcelona, Belgrade, Bergen, Berkeley LBL and UC, HU Berlin, Bern, Birmingham, Bologna, Bonn, Boston, Brandeis, Bratislava/SAS Kosice, Brookhaven NL, Buenos Aires, Bucharest, Cambridge, Carleton, Casablanca/Rabat, CERN, Chinese Cluster, Chicago, Clermont-Ferrand, Columbia, NBI Copenhagen, Cosenza, AGH UST Cracow, IFJ PAN Cracow, DESY, Dortmund, TU Dresden, JINR Dubna, Duke, Frascati, Freiburg, Geneva, Genoa, Giessen, Glasgow, Goettingen, LPSC Grenoble, Technion Haifa, Hamburg, Hampton, Harvard, Heidelberg, Hiroshima, Hiroshima IT, Indiana, Innsbruck, Iowa SU, Irvine UC, Istanbul Bogazici, KEK, Kobe, Kyoto, Kyoto UE, Lancaster, UN La Plata, Lecce, Lisbon LIP, Liverpool, Ljubljana, QM London, RH London, UC London, Lund, UA Madrid, Mainz, Manchester, Mannheim, CPPM Marseille, Massachusetts, MIT, Melbourne, Michigan, Michigan SU, Milano, Minsk NAS, Minsk NCPHEP, Montreal, McGill Montreal, FIAN Moscow, ITEP Moscow, MEPhI Moscow, MSU Moscow, Munich LMU, MPI Munich, Nagasaki IAS, Nagoya, Naples, New Mexico, New York, Nijmegen, BINP Novosibirsk, Ohio SU, Okayama, Oklahoma, Oklahoma SU, Oregon, LAL Orsay, Osaka, Oslo, Oxford, Paris VI and VII, Pavia, Pennsylvania, Pisa, Pittsburgh, CAS Prague, CU Prague, TU Prague, IHEP Protvino, Regina, Ritsumeikan, UFRJ Rio de Janeiro, Rome I, Rome II, Rome III, Rutherford Appleton Laboratory, DAPNIA Saclay, Santa Cruz UC, Sheffield, Shinshu, Siegen, Simon Fraser Burnaby, SLAC, Southern Methodist Dallas, NPI Petersburg, Stockholm, KTH Stockholm, Stony Brook, Sydney, AS Taipei, Tbilisi, Tel Aviv, Thessaloniki, Tokyo ICEPP, Tokyo MU, Toronto, TRIUMF, Tsukuba, Tufts, Udine, Uppsala, Urbana UI, Valencia, UBC Vancouver, Victoria, Washington, Weizmann Rehovot, FH Wiener Neustadt, Wisconsin, Wuppertal, Yale, Yerevan The ATLAS Collaboration 1 Experiment 35 Countries (with collaborating institutes, many more countries of origin) 165 Institutes (as of July 2007) 1900 scientific authors

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May The ATLAS Detector 25m diameter 46m total length 7000t weight installed just across the CERN main site, 92 meters below ground ATLAS cavern: 55m long, 32m wide, 35m high: just large enough for the detector – ‘ship in a bottle’, assembled in situ Control room Main surface building SX1

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May The Schedule: Working towards Data-Taking Milestone weeks (Mx): Dedicated effort bringing all experts together with defined targets: Preparation days Combined runs on weekends runs in different configurations with much of the detector Commissioning using cosmic muons, and integrated calibration systems Recently: M6: 3-10 April 08, all subdetectors CaloWeek: monthly, Calorimeters (LAr and Tile), and trigger (L1Calo). Results shown here from 31 March – 7 April M7 (now and on-going, all subdetectors) Technical Runs of Trigger/Data Acquisition (TDAQ) system: Full rate of 40 MHz

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Current LHC Start-Up Schedule ATLAS 29 May 08 ATLAS closes mid-July LHC currently cooling LHC startup: First particles in LHC end-July Aiming for first high-energy pp-Collisions by September (at 10 TeV) Planning for a few weeks of stable operation in 2008 which could produce a few pb -1 (Talk S8.2 by Peter Limon on Saturday)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Detector components 4 super-conducting magnets: solenoid + 3 toroids Muon spectrometer MDT, CSC LAr calorimeters (EM Calo, Had. EndCap) TileCal hadronic calorimeter (Barrel) Transition Radiation Tracker - TRT Silicon Pixel detector Silicon tracker - SCT ~1200 precision chambers for track reconstruction ~600 RPC and ~3600 TGC trigger chambers Stand-alone momentum re- solution Δpt/pt < 10% up to 1 TeV Solenoid field 2T in inner detector region toroid field peak strength 0.4T 1.4 ∙10 8 channels, intrinsic resolution 10 x 110 μm Xe-filled straw tubes, interleafed with PP/PE foil Electron - pion separation ~ 35 hits/track for track reconstruction ~ 6 ∙ 10 6 channels 80μm wide strips ~ channels (EMC,HC) 10%/√E energy resolution for e,γ Trigger for electrons, photons and jets Sandwich structure: iron absorber + scin- tillator tiles ~ channels

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Detector Front End Electronics (Detector responsibility) Detector RODs Region of Interest Builder Custom Hardware Trigger/DAQ architecture Level-1 Trigger Custom Pipelined Hardware High-Level Trigger Large PC farm High data bandwidth Dedicated ‘Data’ Network Readout System Custom built buffers in ROS PC farm Event Building More PC farms on ‘data’ network DAQ software – control, configuration, monitoring (control network) Level-1 Trigger: Calo uses calorimeter towers, Muon has dedicated trigger chambers inside muon spectrometer (RPC in barrel, TGC in endcap)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May M6 setup (April): Detector Coverage RPC [12.5%] Sect 7&8, |  |<1.05, 2  /8 in  MDT [80%] Barrel Sect 1-12 EC A+C, no HV TGC [14%] Sect 9-11 both sides, r/o + trigger TILE [100%] LBA+LBC+EBA+ EBC all in LAr [25%] EC-A (rest being refurbished – now 100%) SCT [50%] full barrel first integration after cooling work TRT top + bottom barrel: C 10%, A 25% Pixel DAQ integrated in M5 Not in M6: Detector commissioning L1 Central Tr. RPC+TGC+L1Calo + MBS+RND+CLK L1 Calo Fully installed r/o + triggers DAQ/HLT Full chain to Tier-0 HLT algorithms Offline Analysis LB: Long Barrel EB: Extended Barrel EC: Endcap A or C: which side

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Calorimetry

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Calorimeter Commissioning: LAr M6 April ‘08: Only EndCap A participating EndCap C was being filled with LAr Barrel: refurbishment of front end boards going on at that time CaloWeek April ‘08: HV switched on (nominal HV) for the full LAr system First muon runs with the full LAr calorimeter at nominal HV Cosmic muon data taking in 32 sample transparent mode (nights and weekend) and test in 5 sample physics mode Timing with respect to Level-1 Calo and Tile trigger Monitoring, DQ tools, HLT studies M7 May ‘08: Running with full LAr calorimeter system, 100% read-out and working as expected

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Status of LAr Calorimeter System 100% of the detector switched on, participating at April CaloWeek data taking (HV, LV, …). Remaining crate operational since Friday 2 nd May. Side A EM-EndCap Cal.EM Barrel Cal. Had. EndCap & Forward Cal. Front end crates HV Side C

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May LAr: Analysis of Cosmics from April CaloWeek First data taking with the full LAr detector (100% since 2 nd May) Many quantities available in the online monitoring: Digits, Noise, Timing, Cells, Clusters LVL1Calo triggered events: Averaged cosmic muon pulse shapes (online monitoring plot, full Barrel C averaged) Shows good timing achieved over the whole detector Single cosmic muon pulses fitting very well to the predicted pulse shape

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Event Displays from M6 and CaloWeek Mcalo event LVL1Calo trigger M6 event RPC trigger Images from Atlantis Event Display HEC pulse shape EMB pulse shape

Tile Cal: Coverage Almost full coverage (Image shows status 15th May): 95% barrel Some modules still in refurbishment (power supply)

Tile Cal: Energy in Calo Week (April) Good energy density peak No top-bottom bias:  segmented into modules 1-64 cosmics muon depositing similar energies passing top (module 17/18) to bottom (module 48/49)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Tile: Laser Calibration System Patch panelLaser pump  Commissioning of Laser system is in advanced state.  Laser used routinely in commissioning data taking to send light to PMTs  Laser data essential for timing intercalibration of TileCal readout.  Tests with CTP and TDAQ done in January  Work ongoing in order to integrate laser with Online and DCS monitoring

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Calorimeter commissioning Page 19 EMBarrel pulse shape L1Calo trigger seen in LAr Extensive testing of Calorimeters and L1Calo during M6 and after, including trigger timing studies L1Calo trigger seen in Tile Page 19 ADC counts vs. bunch crossing

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Cosmic data analysis: Tile Calorimeter TileMuonFitter: Building track-like objects from Tile calorimeter data (new versions, less sensitive to noise) Track Energy (MeV) dE/dx (MeV/mm)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Muon Detectors

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Muon Barrel Commissioning: Sectors Muon Spectrometer Barrel (MDT): Consists of 16 sectors LV power on in all barrel sectors, early all chambers HV power on, apart from lower sectors (supplies) Sectors from 3 to 8 commissioned with Cosmic rays Sectors under test Many problems found and solved Installation issues: Access for other detectors Sector 3 Sector 12 Sector 7 Sector 15

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Muon Barrel Sector Commissioning: RPC  ~ 9 mm Distance between MDT track and RPC cluster MDT -RPC Correlation RPC (Level-1 Muon Trigger): Standalone Tracking: Triggered Cosmic Rays impact point at surface Large shaft Small shaft (Shafts into ATLAS cavern)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Muon Barrel Sector commissioning: MDT Results MDT shows very good track quality for cosmics: - 6 hits per track - Residuals centered at 0 - Residuals RMS ~160  m

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Barrel Commissioning: Level-1 Muon Trigger  Check of the trigger road settings: Width of correlation band between clusters on middle layer RPCs corresponds to the trigger road  Trigger time Calibration: Fit the time of flight distribution between 2 planes and derive the time offset per layer Time of flight between 2 planes of Middle station Hit time distribution within a trigger tower after time calibration

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Inner Tracking Detectors

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Inner Detector Installation Status Inner detector consists of: Pixel, SCT, TRT Commissioning of the Pixel and SCT had major setback on 1 May, due to break-down of compressors for the evaporative cooling system after only 5 days of testing of Pixel detector Compressors have been dismantled and are being repaired The failure resulted in contamination of coolant (C3F8) and entire cooling plant must be cleaned before cooling can be restarted. Cleaning, repair, and restarting of cooling plant will take until at least mid-June. Bakeout of central section of beam pipe in ATLAS requires cooling plant to be operational, and at least innermost layer (plus some disks) of Pixels detector to be cooled This failure means that Pixel sign off tests before closing ATLAS were severely reduced, and has major impact on SCT and Pixel commissioning time

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Efficiency of the L2 tracks with respect to TRT monitoring tool Events with L2 tracks TRT Monitoring tool (TRT Viewer) found tracks TRT: Event in Barrel and End-Cap-A Trigger from scintillation counter (2ns jitter) and tile calorimeter

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May TRT: Event in Barrel and End-CapA

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Cosmic data analysis: TRT and SCT SCT residuals Before alignment After alignment TRT residuals After alignment & calibrations  = 450  m  270  m

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Cosmic data analysis: TRT+SCT and Muon 31  ~ 0.6 ± 0.2 mrad  ~ 10.3 ± 0.3 mrad  ~ -7.9 ± 1.3 mm  ~ 31.9 ± 1.7 mm  ~ -2.4 ± 0.4 mrad  ~ 10.7 ± 0.4 mrad  ~ 2.3 ± 1.0 mm  ~ 44.5 ± 1.2 mm  (TRT+SCT)-  (MDT) (rad)  (TRT+SCT)-  (MDT) (rad) Difference of track position  ) TRT+SCT vs. Muon (MDT)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Trigger and Data Acquisition (TDAQ)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Level-1 Trigger Commissioning Calorimeter trigger signals are thoroughly tested before access disappears Muon trigger commissioning done sector by sector (Availability of gas and power supplies) Timing being addressed Require all triggers to have same timing w.r.t. (non-existent) bunch- crossing Complete system needs to be available (Calo and Muon) HAD Correlation between had. Trigger Tower (Level-1 Calo) and had. Energy (TileCal) Correlation between hits in Level-1 Muon (RPC) and Muon-Det. (MDT)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Level-1 Calo Triggering in April CaloWeek Setup for combined running: L1Calo, LAr, Tile TDAQ Triggering on (in collisions): electron/gamma trigger At > 5 GeV jet trigger at At > 20 GeV tau trigger at At > 15 GeV Regions LAr: EM-Barrel, EM-Endcap (EMEC), Had. Endcap (HEC) Tile: Barrel, Extended-Barrel Spacial correlation (d  ) of interesting regions flagged by L1Calo (ROI) compared to Calo (LAr and Tile) (in log scale)

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May High Level Trigger Infrastructure HLT nodes consist of: Level-2 Supervisors Level-2 Processing Nodes Event Filter Nodes 1U rack mounted dual quad core Regularly used in commissioning runs Expansion to 830 nodes 35% of foreseen system Rapid installation (3 racks per week) Sub Farm Inputs perform Event Building on Level-2 selected events, Event building at ~3kHz (event size 1.5 Mbyte) Sub Farm Outputs write Event Filter-selected events to disk Write to separate streams 6 available (final number) 300 Mbyte/s to computer centre

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May High Level Trigger: Track Trigger Analysis of one M6 cosmics commissioning run taken in March 2008 Trigger is requiring TRT tracks reconstructed online within pixel volume (equivalent to d0  250 mm) Triggered events (red) end up in one stream file, non-triggered events (blue) into another one: proves trigger and streaming are working All TRT reco tracks Triggered TRT tracks High Level Trigger Page 36

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Technical Runs Series of tests of TDAQ-only at nominal rate (40 MHz input). Using busy events e.g. ttbar from MC. Most recently in April ’08: Concentration on stress tests: Stress data flow at all levels Achievements: Stable running (several hours without intervention) Event sizes from 1 MB to 10 MB Event Building and Data Writing ran at Gbit link limits Controlled ~1500 applications over 350 nodes Successful, though some tweaks needed in error handling Playback of M4, M5 and Monte Carlo data to test all algorithm slices Generated data set for luminosity used to test HLT menu for initial running

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Technical Run Display 1.5 hour running time stable trigger rate memory leak spotted

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Looking ahead…

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Looking ahead: Commissioning with beam Activities during Beam Commissioning (expected end-July): Calibration triggers Detector characterisation, timing Cosmic triggers Exercise whole system, HLT, read out, TTC system, Alignment data, coarse timing, synchronisation, Monitoring, exercise reconstruction/ Tier 0 Verification of experiment protection without beam Single beam triggers Validation of beam protection systems Feedback to machine, First synchronization with LHC Collision triggers Full synchronization with LHC Understanding of full detector Physics... (Talk S6.4 today by Tetiana Hryn'ova) collision tt cosmic tt beam-gas interaction halo track

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Conclusions ATLAS detector is fully installed in the cavern Last hardware work being done before beam-line closes, esp. in Muon (MDT) and Inner Detector (SCT and Pixel cooling) area Milestone weeks with cosmic, calibration and technical runs on-going: Combined analysis ‘Real’ triggers used TDAQ integrating all subsystems Online and Offline software maturing, computing infrastructure being tested Moving into continuous runs and 24/7 shifts Ready and waiting for collisions!

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May BACKUP SLIDES

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May ATLAS Level-1 Muon Trigger Dedicated muon chambers with good timing resolution Barrel: Resistive Plate Chambers (RPC) Endcaps: Thin Gap Chambers (TGCs) Local track finding on-detector, candidate multiplicity calculation off- detector 43 Looking for coincidences in chamber layers within programmable roads (road width related to momentum) 6 programmable coincidence windows determine momentum threshold (using B-field deflection) For cosmic rays open up the coincidence windows as much as possible

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Inner Detector Installation Status Inner Detector consists of: Pixel, SCT, TRT Inner Detector preparation is behind schedule due to breakdown in cooling system compressors for SCT and Pixels: Compressors dismantled and being repaired During the repair SCT and Pixels cannot be operated Repair will take until end of May at the earliest Time available for Pixel commissioning sharply reduced Beam-pipe closure possible only after cooling

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Muon Barrel/EndCap Commissioning: Calibration During M4: Calibration Stream emulated offline, data sent (offline) to Tier2-Computing centres During Dec.’07 muon run: Calibration stream extracted online from LVL2 Still many problems to investigate but very encouraging progress The Muon Calibration Data Stream provides large samples of muon data extracted before the Level-2 decision (Only data in Region Of Interest marking by Muon Level-1 trigger). MDT Residuals from Cosmics after calibration on Calibration Stream Data

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Cosmic data analysis: TRT+SCT Detailed studies performed for each sub-system have been performed, in particular: ID alignment and calibration Muons calibration List of bad channels Tile laser timing updated TRT residuals SCT residuals Before alignment After alignment After alignment & calibrations Muons calibrated chambers  = 450  m  270  m

Commissioning of ATLAS Juergen Thomas, HCP 2008 Galena, 30 May Cosmic data analysis: HLT Tracks High-Level-Trigger track (algorithm ‘SiTrack’ in LVL-2) Efficiency w.r.t. Offline tracks Efficiency  0 (rad) d0 (mm)